RH1 RH1This is in conjunction with SATIP-L-350-01or with
the applicable piping/equipment SATIP.
Review of Test Package Preparation
1.3Line Flushing or Internal Cleanliness
Procedure
* See Note 1 (General Notes)
1.4 Lay-Up Procedure SAIC-A-2007 RH1
W1
SAIC-A-2003
SAIC-A-2016SATR-A-2001
R1
SAIC-L-2001
W1
W1 S
R2
H1SAIC-A-2009
MECHANICAL
RH1
RH1
PROJECT PHASE &
Activi ty Code
SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)
RH1
DISCIPLINE:
REMARKSQUALITY
PROCEDURE
1.0
Hydrostatic testing Procedure
DOCUMENT REVIEW
SAIC-A-20011.1
SATR-A-2002
SATR-A-2003
SATR-A-2004
SATR-A-2005SATR-A-2006
SATR-A-2001
for test
Manifold)
SAIC-A-2009
3.3
3.0 APPLICATION
3.1
3.6
SAIC-A-2013
Pneumatic Testing of Reinforcing padscovering Pressure containing Welds SAIC-A-2016
Filling & Pressurization SAIC-A-2013
SAIC-A-2008 R1RH1
MATERIAL RECEIVING
Test Preparation & Verification ofTesting equipment (including safety
requirements)
SAIC-A-2008
SATR-A-2014
Verification of Testing Media for
Hydrostatic Testing
Forms SATR-A-2003 & SATR-A-2004 shall be
used for 24-hr recorded hydrostatic test, Ie;underground piping or piping whose joints are
covered before pressure testing.
W1
H1 H1
SAIC-A-2015
SATR-A-2001H1 H1
APPROVED DATE
25-May-05
SAUDI
ARAMCO
CONTRACTOR/SUBCONTRACTOR
Hydrostatic Testing of On-Plot Piping
SAUDI ARAMCO TYPICAL INSPECTION PLANSATIP No.
SATIP-A-004-02
ITEM
NO. TASK / ACTIVITY
CNTRCTR
QUALITY
RECORD
WBS/BI/JO/NO.PROJECT TITLE:
INSPECTION RESPONSIBILITY
ASSIGNMENTS
2.1
2.0
1.2
3.4
SAIC-A-2015Visual Inspection at Test Pressure3.5
Pre-Test Punch Listing SAIC-A-2010 SATR-A-2007
In Conjunction with SATIP-L-350-01
In Conjunction with SATIP-L-350-01
3.2 Internal Cleanliness or Flushing SAIC-L-2017SAIC-L-2017
SATR-A-2008H1 H1
Page 1 of 2
8/17/2019 1 SATIP-A-004-02 Hydro Test of Plant Piping-Rev 1
2/2
MECHANICAL
PROJECT PHASE &
Activi ty Code
SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)
DISCIPLINE:
REMARKSQUALITY
PROCEDURE
APPROVED DATE
25-May-05
SAUDI
ARAMCO
CONTRACTOR/SUBCONTRACTOR
Hydrostatic Testing of On-Plot Piping
SAUDI ARAMCO TYPICAL INSPECTION PLANSATIP No.
SATIP-A-004-02
ITEM
NO. TASK / ACTIVITY
CNTRCTR
QUALITY
RECORD
WBS/BI/JO/NO.PROJECT TITLE:
INSPECTION RESPONSIBILITY
ASSIGNMENTS
4.2 Lay-up SAIC-A-2018 H1 W1
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative inattendance.
SATR-A-2009
4.0 POST- TEST
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
organization representative is not present.
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
W1 H2
R1W2
5
3
1
2
R2
Sample Hold Point for QC Inspection or Test
100% Review of Documents
sample Review of Documents Surveillance
RH1
RH2
100% Review and Approval of Documents
Sample Review and Approval of Documents
S
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust
the levels of Saudi Aramco participation based upon the Contractor’s performance.
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.
4
H1
100% Witness Inspection/Test
Sample Witness Inspection/Test
100% Hold Point for QC Inspection or Test
SAIC-A-2017 W1 S4.1 De-Pressurization & Water Disposal SAIC-A-2017
Page 2 of 2