In Conjunction with SATIP-L-350-01 In Conjunction with SATIP-L-350-01 3.2 Internal Cleanliness or Flushing SAIC-L-2017 SAIC-L-2017 SATR-A-2008 H1 H1 RH1 H1 R2 This is in conjunction with SATIP-L-350-01or with the applicable piping/equipment SATIP. * See Note 1 (General Notes) DISCIPLINE: REMARKS MECHANICAL QUALITY PROCEDURE 1.0 DOCUMENT REVIEW PROJECT PHASE & Activity Code W1 H1 SATR-A-2007 H1 3.4 3.5 3.0 APPLICATION 3.1 Pre-Test Punch Listing SAIC-A-2010 SAIC-A-2020 S 4.0 Filling & Pressurization a) Strength test b) Service test SAIC-A-2020 POST- TEST W1 W1 SAIC-A-2004 R1 MATERIAL RECEIVING Verification of Testing Medium for Pneumatic Testing SAIC-A-2021 SATR-A-2001 H1 4.1 SAIC-A-2022 APPROVED DATE 25-May-05 SAUDI ARAMCO TASK / ACTIVITY CNTRCTR QUALITY RECORD PROJECT TITLE: CONTRACTOR/SUBCONTRACTOR WBS/BI/JO/NO. SAIC-A-2021 Visual Inspection at Test Pressure De-Pressurization Pneumatic Pressure Testing SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. SATIP-A-004-01 INSPECTION RESPONSIBILITY ASSIGNMENTS 2.1 2.0 1.2 Review of Test Package Preparation ITEM NO. RH1 3.3 Test Preparation & Verification of Testing equipment (including safety requirements) SAIC-A-2009 RH1 S SATR-A-2002 SATR-A-2005 SATR-A-2006 SATR-A-2001 for test Manifold) SAIC-A-2009 H1 RH1 1.1 Pressure Testing Procedure SAIC-A-2001 RH1 SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004) 1.3 Line Flushing or Internal Cleanliness Procedure SAIC-L-2001 RH1 SAIC-A-2003 Page 1 of 2

1 SATIP-A-004-01 Pneumatic Pressure Testing

Embed Size (px)

DESCRIPTION

j

Citation preview

Page 1: 1 SATIP-A-004-01 Pneumatic Pressure Testing

In Conjunction with SATIP-L-350-01

In Conjunction with SATIP-L-350-01

3.2 Internal Cleanliness or Flushing SAIC-L-2017 SAIC-L-2017SATR-A-2008 H1 H1

RH1

H1

R2

This is in conjunction with SATIP-L-350-01or with the applicable piping/equipment SATIP.

* See Note 1 (General Notes)

DISCIPLINE:

REMARKS

MECHANICAL

QUALITY PROCEDURE

1.0 DOCUMENT REVIEW

PROJECT PHASE & Activity Code

W1

H1SATR-A-2007 H1

3.4

3.5

3.0 APPLICATION

3.1 Pre-Test Punch Listing SAIC-A-2010

SAIC-A-2020 S

4.0

Filling & Pressurizationa) Strength testb) Service test

SAIC-A-2020

POST- TEST

W1

W1

SAIC-A-2004 R1

MATERIAL RECEIVING

Verification of Testing Medium for Pneumatic Testing

SAIC-A-2021SATR-A-2001 H1

4.1 SAIC-A-2022

APPROVED DATE

25-May-05

SAUDI ARAMCO

TASK / ACTIVITY CNTRCTR

QUALITY RECORD

PROJECT TITLE: CONTRACTOR/SUBCONTRACTORWBS/BI/JO/NO.

SAIC-A-2021Visual Inspection at Test Pressure

De-Pressurization

Pneumatic Pressure TestingSAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No.

SATIP-A-004-01

INSPECTION RESPONSIBILITYASSIGNMENTS

2.1

2.0

1.2 Review of Test Package Preparation

ITEM NO.

RH1

3.3Test Preparation & Verification of Testing equipment (including safety requirements) SAIC-A-2009

RH1

S

SATR-A-2002SATR-A-2005SATR-A-2006SATR-A-2001

for test Manifold)

SAIC-A-2009

H1

RH1

1.1 Pressure Testing Procedure SAIC-A-2001 RH1

SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

1.3 Line Flushing or Internal Cleanliness Procedure SAIC-L-2001 RH1

SAIC-A-2003

Page 1 of 2

Page 2: 1 SATIP-A-004-01 Pneumatic Pressure Testing

DISCIPLINE:

REMARKS

MECHANICAL

QUALITY PROCEDURE

PROJECT PHASE & Activity Code

APPROVED DATE

25-May-05

SAUDI ARAMCO

TASK / ACTIVITY CNTRCTR

QUALITY RECORD

PROJECT TITLE: CONTRACTOR/SUBCONTRACTORWBS/BI/JO/NO.

Pneumatic Pressure TestingSAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No.

SATIP-A-004-01

INSPECTION RESPONSIBILITYASSIGNMENTSITEM

NO.

SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not present.

If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

5

3

1

2

4

H2R1W2

LEGEND

100% Review of Documentssample Review of Documents Surveillance

RH1RH2

100% Review and Approval of DocumentsSample Review and Approval of Documents

S

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.

Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.

GENERAL NOTES

H1

100% Witness Inspection/TestSample Witness Inspection/Test100% Hold Point for QC Inspection or Test

W1

R2

Sample Hold Point for QC Inspection or Test

Page 2 of 2