Mohammad Alauddin Deputy Secretary Power Division Ministry of Power, Energy & Mineral Resources Govt. of the People’s Republic of Bangladesh [email protected] December 16, 2013

Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

Mohammad AlauddinDeputy Secretary

Power Division

Ministry of Power, Energy & Mineral Resources

Govt. of the People’s Republic of [email protected]

December 16, 2013

Page 2: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

December 16, 2013

Category Achievement

Solar Home System (SHS) 110 MW

Solar PV Application(Office Buildings) 1 MW

Solar PV Systems as a prerequisite ofnew connections

10 MW

Wind Energy 2 MW

Biomass based electricity 1 MW

Biogas based electricity 1 MW

Total (Excl. Hydro) 125 MW

Hydro Power Plant 230MW

Achievement in RE

Page 3: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

December 16, 2013

Program started in Jan 2003.

2.68 million SHS installed by Nov’13 (110 MW)

Beneficiaries:11 million, 7% of the population.

Savings: 30,000 tons of kerosene worth USD110 million per year.

Job creation: 30,000 direct & 40,000 indirect.

Investment: USD 432 million

Page 4: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

What is a SHS ?

Capacity Appliances Operation

20WpLamp: 2

Mobile Charger: 14-5 hours

50WpLamp: 4

B & W TV: 1Mobile Charger: 1

4-5 hours

85WpLamp: 9

B & W TV: 1Mobile Charger: 1

4-5 hours

CFL /LED Light Gel Battery DC-DC Converter to run

color television, fan, refrigerator etc.

Page 5: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

December 16, 2013

-

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

1,000,000

11,697 20,635

27,579 37,151 69,562

103,301

169,916

325,067

468,978

452,310

480,000

960,000

229,994

Inst

alla

tio

n o

f SH

S

Actual Installation Projected Installation

Page 6: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

December 16, 2013

Supply Equipment

Pay for Equipment

Seeks grant & loan

Provide grant & loan

IDCOL

Technical Standards Committee

SuppliersSeeks approval

Provides approval

Household

Sells SHS & provide

service

Pay down-payment & installment

Operations Committee

POPO Selection Committee Select POs

Applies

Dev. Partner

Grant & soft term

credit

Page 7: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

12/16/2013

Dev. Partners

• Provides grant and soft loans

• Provides technical assistance needed

GoB

• Provides grants and soft loan to IDCOL

• Provides policy support

IDCOL

• Provides grants to reduce SHS cost and for capacity building

• Provides soft loans

• Provides training, promo support

• Monitors implementation

PO

• Identify potential customers

• Installs SHS

• Extends micro-credit

• Provides after sales services

Household

• Maintain system

• Repay loan in monthly installments.

Loan & Grant Loan & Grant Loan & Grant Loan & Grant

Debt ServiceDebt ServiceDebt ServiceDebt ServiceDebt ServiceDebt ServiceDebt ServiceDebt Service

Page 8: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

12/16/2013

(a) Market Price of 20 Wp SHS BDT 13,600

(b) Buy-down Grant (Grant A) (USD 20/SHS) BDT 1600

(c) System Price for Household [(a)-(b)] BDT 12,000

(d) Down Payment from Household to PO [15% of (c)] BDT 1,800

(e) Loan Payable from Household to PO [(c)-(d)] BDT 10,200

Loan Tenor 3 years

Interest Rate 12-16% p.a.

Monthly Installment Amount BDT 350

(f) IDCOL Refinance [80% of (e)] BDT 8,160

Loan Tenor 5~7 years

Interest Rate 6~9% p.a.

Page 9: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

PO Selection CommitteeConsists of the representatives from IDCOL & relevant

government ministries & organizations.

Technical Standards CommitteeConsists of technical experts from universities, engineering

departments of government of Bangladesh & IDCOL.

Determines technical standards, reviews product credentials of dealers, & approves the eligible equipment.

Operations CommitteeConsists of program-in-charges from all POs and

representatives from IDCOL

POs.ppt

12/16/2013

Page 10: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

IDCOL has 12 regional offices across the country to inspect

& monitor SHS installations by various Pos

Each regional office consists of a regional supervisor and

10-12 inspectors

Each inspector inspects around 300 systems every month

Any discrepancy identified on SHS units are updated into

the database

Follow up with the POs is carried out on minor defects

found in SHS

12/16/2013

Page 11: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

Training of Trainers is provided by IDCOL to POs staff &

IDCOL inspectors

POs train their technicians & customers

Financial aid provided to POs for carrying out trainings

Training manuals, booklets/brochures on SHS system

operation & maintenance also prepared and provided to

POs/customers

12/16/2013

Page 12: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

IDCOL has set up a dedicated customer care call

centre to which customers report directly on system

defects/maintenance issues, during warranty period

After 3 years of warranty, users can sign annual

maintenance agreements with POs

IDCOL provides incentives to customers if they replace

the old batteries through POs itself - this ensures safe

disposal of used batteries by suppliers

12/16/2013

Page 13: Mohammad Alauddin - UN ESCAP · Solar Home System (SHS) 110 MW Solar PV Application(Office Buildings) 1 MW Solar PV Systems as a prerequisite of new connections 10 MW Wind Energy

December 16, 2013

Project/Program Target

SHS Program 4 million by 2015

Domestic Biogas Program

100,000 by 2016

Improved Cook Stove Program

1 million by 2015

Solar Irrigation Program

1,550 by 2016

Solar Mini Grid 50 by 2016

Biomass Gasification Project

50 by 2016

Biogas Based Electricity Project

50 by 2016