1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013 Kavouss Arasteh Chairman, RAG CG on ITU-R Strategic Plan

1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

Embed Size (px)

Citation preview

Page 1: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

1

ITU-R Strategic PlanDraft Report from the RAG Correspondence Group

RAG Informal Meeting on ITU-R Strategic and Operational PlansGeneva, 21 May 2013

Kavouss ArastehChairman, RAG CG on ITU-R Strategic Plan

Page 2: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

2

ITU-R Strategic Plan

This is the Strategic Plan of the ITU-R, i.e. the Membership

This is not the Strategic Plan of the BR. The BR provides support to the activities of the ITU-R

It is a matter for the Membership to address, consistent with the specific strategic plans of each member.

Page 3: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

3

Avoid confusion between objectives and means in the “strategic goal”

Possible improvements to Resolution 71

Resolution 71 (Rev. Guadalajara, 2010) may be improved on the following aspects:

Avoid confusion between activities, outputs and objectives

Avoid confusion between ITU-R and BR roles, in respect of activities, results and KPI

Avoid separation between consistent activities (e.g. RA and RAG, publications)

Page 4: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

4

ITU-R Strategic Objectives

To ensure interference-free operations of radiocommunication systems by implementing the Radio Regulations and regional agreements, as well as updating these instruments in an efficient and timely manner through the processes of world and regional radiocommunication conferences

To establish worldwide standards and associated materials Recommendations intended to enassure the necessary required performance , interoperability and quality in for operating radiocommunication systems.

To seek ways and means to ensure the rational, equitable, efficient and economical use of the radio-frequency spectrum and satellite-orbit resources and to promote flexibility for future expansion and new technological developments.

Page 5: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

5

Proposed Process 1 (Associated to “Objective 1”):

Output of this process is the Final Acts of WRCs and RRCs, updated Radio Regulations, Rules of procedure of the RRB

Activities are: preparatory activities by administrations and regional groups, WRC and RRC discussions, RRB activities and BR activities in support of all this.

Input is proposals from administrations, reports from the Director, BR

Establish and update international regulations on spectrum use

Page 6: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

6

ITU-R Production Process 1

On Spectrum Usage

P

Establish and update International Regulations on Spectrum Use

R1

R1A1

BR Support and

reports

Piloting

ITU

ME

MB

ER

ST

AT

ES

SP

EC

TR

UM

R

EQ

UIR

EM

EN

TS

(P

rop

osa

ls f

or

Reg

ula

tio

ns

)

U

PD

AT

ED

RE

GU

LA

TIO

NS

WRC, RRC, Regional groups activities

R1A2

RRB activities

Page 7: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

7

Outputs are updated MIFR and Plans by recording/suppression/modifications of assignments/allotments in the MIFR/relevant Plans and associated publications (BRIFIC, Lists of Maritime publications, Inputs are the notices from administrations on intended use of spectrumActivities are:

Proposed Process 2 (Associated to “Objective 2”):

Apply international regulations on spectrum use

- the actions taken by the BR in administering the procedures of theRR and regional Agreements,

- the activities of the RRB other than the adoption of RoPs,

- the actions taken by administrations and operators in coordinating frequencies and exchanging information with the BR, and the BR supports for these works.

Page 8: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

8

ITU-R Production Process 2

On Spectrum Usage

P

Apply International Regulations on Spectrum Use

R2

R2A1

BR Support and

reports

Piloting

IT

U M

EM

BE

R S

TA

TE

S S

PE

CT

RU

M

RE

QU

IRE

ME

NT

S (

No

tice

s o

n in

ten

ded

sp

ectr

um

use

)

UP

DA

TE

D M

IFR

, PL

AN

S

Application of procedures by BR, Administrations

R2A2

RRB activities in solving difficulties in the application of the procedures (not including RoP)

(not including RoP)

Page 9: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

9

Outputs are recommendations, reports (including the CPM report) and handbooksInputs are contributions by the ITU-R Membership

Activities are the technical, operational and regulatory studies within the ITU-R Study Groups, SCRPM and CPM, as well as the BR activities in support of these tasks

RA is piloting this process

Proposed Process 3 (Associated to “Objective 3”):

Produce worldwide standards, recommendations, reports and Handbooks for optimum use of spectrum and its associated works

Page 10: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

10

ITU-R Production Process 3

On Spectrum Usage

P

Produce global standards, recommendations, reports and Handbooks for optimum use of

spectrum

R3

R3A1

BR Support

Piloting (RA)

ITU

ME

MB

ER

SH

IP

CO

NT

RIB

UT

ION

S

Glo

bal

Sta

nd

ard

s,

Rec

om

men

dat

ion

s,, R

epo

rts

and

H

and

bo

oks

Activities of Study Groups, Working parties, SCRPM, CPM

R3A2

Edition and publication of ITU-R outputs

Page 11: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

11

The activities relating to informing from those relating to assisting administrations may be difficult to separate. Therefore, these activities have been combined into one process intended to fulfill Objectives 4 and 5.

Proposed Process 4 (Associated to “Objectives” 4 and 5):

Inform and assisting membership in radiocommunication matters

Page 12: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

12

ITU-R Production Process 4

On Spectrum Usage

P

Inform and Assist Administrations on Radiocommunications matters

R4

R4A1

BR Support

Piloting

ITU

ME

MB

ER

SH

IP R

EQ

UE

ST

S F

OR

IN

FO

RM

AT

ION

/AS

SIS

TA

NC

E

Del

iver

able

s :

even

ts,

wo

rksh

op

s, s

emin

ars

Development of presentations, tutorial material for information and capacity building

Page 13: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

13

ITU-R Processes

On Spectrum Usage

P

Establish and update International Regulations on Spectrum

R1

R2

R3

Inform and Assist Administrations in radiocommunication matters

R4

Piloting

ITU

ME

MB

ER

SH

IP

RE

QU

IRE

ME

NT

S

SA

TIS

FA

CT

ION

OF

IT

U

ME

MB

ER

SH

IP

Apply International Regulations on Spectrum

Produce global Standards, Recommendations, Reports, Handbooks for Optimum Spectrum Use

BR Support

Page 14: 1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013

14

Follow up

Modifications to Resolution 71 are to be decided by PP-14Preparation expected to take place in a Council working group to be created by C13 and to produce a report for consideration by C14 and by MS in formulating their formal proposals to PP14RAG may wish to liaise its conclusions, if any, to the Council Working group, as foreseen by Resolution 71