Implementing the EPWP in the Infrastructure Sector

2 March 2005

Page 2: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

2

INTRODUCTION TO THE EPWP

Page 3: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

3

BACKGROUND

President’s State of the Nation Address February 2003

Growth and Development Summit June 2003

Cabinet approved conceptual framework November 2003

National Launch in May by President

KZN Provincial Launch in August by Deputy President

Page 4: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

4

Nation-wide programme which will draw significant numbers of the unemployed into productive work, so that workers

gain skills while they work, and increase their capacity to earn an income

DEFINITION

Page 5: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

5

OBJECTIVE

To utilise public sector budgets to alleviate unemployment

Page 6: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

6

Creating productive employment opportunities

Increasing the labour intensity of government-funded infrastructure projects

Creating work opportunities in public environmental programmes (eg Working for Water)

Creating work opportunities in public social programmes (eg community health workers)

Utilising general government expenditure on goods and services to provide the work experience component of small enterprise learnership / incubation programmes

This will be achieved by:

Page 7: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

7

Enhancing the ability of workers to earn an income, either through the labour market or through entrepreneurial activity

Provide unemployed people with work experience

Provide education and skills development programmes to the workers

Page 8: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

8

(not mutually exclusive)

Reduce poverty bythe alleviation/reduction of

unemployment

Government Strategies

Utilise governmentexpenditure to

alleviate and reduceunemployment

Balanceeconomicgrowth with

growth in EAP

Govt. budget/procurement

RegulationEducation

policyMacro-economic

policies

Short/medium-term

Improveenabling

environment

Interventiontype

Improveeducation

sytem

Medium/longterm

Long-termMedium/long

termImpacttimescale

(EAP = economically active population)

Improve socialsecurity net

Govt. socialwelfare budget

Short/medium-term

Expanded PublicWorks

ProgrammeGoal

Page 9: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

9

TARGETS, SCOPE, AND INSTTUTIONAL

ARRANGEMENTS

Page 10: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

10

TARGETS

Target the unemployed and marginalised

To provide one million employment opportunities with training to unemployed people, within the first five years of the programme

Page 11: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

11

Covers all spheres of government and SOE’s

Each public body must formulate plans for utilising its budget to draw significant numbers of the unemployed into productive work, and to provide them with training

SCOPE

Page 12: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

12

• EPWP involves the large-scale re-orientation of line budgets so that government expenditure results in more work opportunities

•All public bodies are expected to contribute to the programme

•The conditionalities that are attached to the Provincial Infrastructure Grant (PIG) and Municipal Infrastructure Grant (MIG) are contained in the Guidelines

Implementation in infrastructure

Page 13: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

13

Infrastructure Sector: ProvincesNational Treasury

Province

Provincial Infrastructure Grant earmarked for the EPWP through the Division of Revenue Act and Audited by the Auditor General Provincial

Infrastructure Budget

Infrastructure Budget from Equitable Share

Equitable Share

Other Provincial Expenditure

Department of Public Works Support

to province

Provinces report indicators

Page 14: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

14

Infrastructure Sector: MunicipalitiesNational Treasury

Municipality

Municipal Infrastructure Grant earmarked for the EPWP through the Division of Revenue Act and Audited by the Auditor General Municipal

Infrastructure Budget

Infrastructure Budget from Rates, levies and Taxes

Rates, Levies and Taxes

Other Provincial Expenditure

Public Works

Support DPLG

Reporting

Page 15: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

15

Key requirements of the EPWP Guidelines

EPWP conditions will be included in the Division of Revenue Act (DORA) for the conditional provincial and municipal infrastructure grants (PIG and MIG):

Certain types of infrastructure projects must be done labour-intensively projects, in accordance with DPW guidelines

DPW guidelines cover identifying, designing, and producing tender documentation for labour-intensive projects

Guidelines require provinces and municipalities to apply eligibility requirements for appointment of contractors and engineers on labour intensive projects (they must be qualified in the use of labour intensive methods)

Page 16: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

16

TRAINING REQUIREMENTS

The need has been identified to build capacity to implement large numbers of labour intensive projects

Together with the CETA a strategy for building this capacity is being implemented.

NQF level 2, 4, 5 and 7 unit standards have been registered with the SAQA and CETA targeting: Foremen Site supervisors Contractors/ Consultants/ Officials Engineers/ Consultants

In addition these are being integrated with existing learnerships and skills programmes

Page 17: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

17

Projects and activities amenable to labour intensive construction and that must be done by hand on EPWP Projects:

•Spreading•Shaping•Camber formation•Loading•Ditching/ Trenching•Sloping•Gravelling and Finishing•Sidewalks

Page 18: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

18Spreading

Page 19: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

19Trenching

Page 20: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

20Sloping

Page 21: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

21Camber Formation

Page 22: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

22Loading

Page 23: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

23Culverts and headwalls

Page 24: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

24On time at required standard and cost

Completed product

Page 25: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

25

Implications of the EPWP on the execution of projects

DORA conditions are aimed at creating a minimum amount of labour-intensive construction. Government bodies are encouraged to do more

While it is recognised that most provinces and municipalities do some labour intensive construction projects, the targets of the EPWP will only be met if the use of these methods is increased significantly.

This means that it will need to go beyond the small common LI contracts and needs to move also executing larger projects labour-intensively

This will mean that larger contractors will also be required to use labour-intensive methods

Page 26: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

26

Provinces and municipalities prioritise and decide on projects using their PIG and MIG funding, using normal allocation methods, such as Integrated Development Plans (IDPs)

National not involved in allocation of funds to projects – provinces and municipalities allocate in line with DORA conditions

MIG is managed and disbursed through dplg, PIG through National Treasury

DPW will provide support to provinces and municipalities to simplify implementation

CETA and DPW putting in place NQF unit standards, qualifications, and accredited training programmes for contractors and engineers for labour-intensive construction

Page 27: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

27

Going beyond the minimumAppendices A & B of the Guidelines include references to documents and suggestions on the use of LIC on other higher standard infraustructure

• Agrément South Africa • Construction Industry Development Board• Development Bank of Southern Africa• Southern African Bitumen and Tar Association• Standards South Africa• The School of Civil Engineering , University of

the Witwatersrand

Page 28: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

28

Rubble Masonry Bridges and Culverts

Page 29: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

29

Foamed bitumen gravel

Cast in-situ block paving

Emulsion treated gravel

Waterbound Macadam

Hysen Cells

Base courses

Page 30: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

30

Waterbound Macadam on High Volume Road (N1)

Page 31: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

31

Bridge built using labour-intensive methods

Before

Page 32: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

32

Page 33: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

33

Page 34: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

34

After

Page 35: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

35

Alternative cost effective low-cost

sealing options by LIC

Scarce wearing course material, requires innovative approaches to reducing the maintenance cost of Gravel roads

Page 36: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

36

Blacktop roads using LIC methods

Page 37: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

37

Slurry bound macadam

Page 38: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

38

Concrete Block Paving

Page 39: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

39

CIDB Best Practice Guidelines for Labour-Based Methods and Technologies for Employment Intensive Construction Works

BESA Building System for housing, schools and clinics

(bitumen emulsion stabilised adobe blocks)

Page 40: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

40

Gabions

Page 41: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

41

Key aspects of the EPWP employment conditions frameworks:

Ministerial Determination for Special Public Works Programmes and the Code of Good Practice

Gazetted after negotiations at NEDLAC Allow for special conditions of employment to facilitate

greater employment on Public Works Programmes:

• Employers may set rates of pay locally at self-targeting rates, to avoid attracting workers away from more permanent employment

• Reduced obligations for employers, eg no UIF insurance payments

• Task-based payment for labour-intensive works

Page 42: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

42

These special conditions of employment are on condition that:

Workers have an entitlement to training

The duration of employment of a worker under these special conditions is limited

Page 43: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

43

DPW and CETA designed learnership programme

Is a support mechanism to provinces and municipalities: participation is optional

Participation based on province/municipality signing an MOU with DPW and the CETA

Modelled on Limpopo’s Gundo Lashu programme (expansion of best practice)

LABOUR INTENSIVE CONTRACTOR LEARNERSHIP PROGRAMME

Page 44: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

44

CETA has agreed to fund learnerships for 1500 individuals for the EPWP Labour Intensive contractor learnership programme

Each Contractor Learnership will have three persons trained in the programme: one contractor and two site supervisors

DPW will provide a mentor over the two-year period to the learner contractor

Municipality or province will allocate three training projects to the learner contractors

DPW will also provide programme management support as required

Page 45: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

45

ROLES AND RESPONSIBILITIES

Province / municipality

Learner contractor2 learner supervisors

Unemployed EPWP beneficiaries

CETA DPW DOL

ABSA

Trainingproviders for learnerships

Training providers for workers

Mentors forlearners

Mentors for training providers

Training projects

Trainers of trainers

Programme Managementsupport

IDT

CommunityFacilitationSupport

Access tocredit

Page 46: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

46

What the EPWP Unit in Department of Public Works has to offer

•There are still learnerships to be taken by municipalities or other public bodies•DPW is together with CETA, LGW SETA and PS SETA coordinating training on NQF 5 & 7 unit standards for all relevant officials in departments and municipalities which will start in January•A learnership manager based in KZN has been appointed•DPW could appoint a contract specialist to align KZN department and municipalities contact documents with the EPWP•Information and advise on use of labour intensive construction methods to public bodies

Page 47: 1 Implementing the EPWP in the Infrastructure Sector 2 March 2005

47