Exponential smoothing:The state of the art – Part II
Everette S. Gardner, Jr.
2
Exponential smoothing:The state of the art – Part II
History Methods Properties Method selection Model-fitting Inventory control Conclusions
3
Timeline of Operations Research (Gass, 2002)
1654 Expected value, B. Pascal1733 Normal distribution, A. de Moivre1763 Bayes Rule, T. Bayes 1788 Lagrangian multipliers, J. Lagrange 1795 Method of Least Squares, C. Gauss, A. Legendre1826 Solution of linear equations, C. Gauss1907 Markov chains, A. Markov1909 Queuing theory, A. Erlang1936 The term OR first used in British military applications1941 Transportation model, F. Hitchcock1942 U.K. Naval Operational Research, P. Blackett1943 Neural networks, W. McCulloch, W. Pitts1944 Game theory, J. von Neumann, O. Morgenstern 1944 Exponential smoothing, R. Brown
4
Exponential smoothing at work
“A depth charge has a magnificent laxative effect on a submariner.”
Lt. Sheldon H. Kinney, Commander, USS Bronstein (DE 189)
5
Forecast Profiles N A M
None Additive Multiplicative
N
None
A
Additive
DA
Damped Additive
M
Multiplicative
DM
Damped Multiplicative
6
Damped multiplicative trends (Taylor, 2002)
-
1,000
2,000
3,000
4,0001.00 0.95 0.90
0.85
Damping paramete
r
7
Variations on the standard methods Multivariate series (Pfefferman & Allen, 1989) Missing or irregular observations (Wright,1986) Irregular update intervals (Johnston, 1993) Planned discontinuities (Williams & Miller, 1999) Combined level/seasonal component (Snyder & Shami, 2001) Multiple seasonal cycles (Taylor, 2003) Fixed drift (Hyndman & Billah, 2003) Smooth transition exponential smoothing (Taylor, 2004) Renormalized seasonals (Archibald & Koehler, 2003) SSOE state-space equivalent methods (Hyndman et al., 2002)
8
Smoothing with a fixed drift (Hyndman & Billah, 2003)
Equivalent to the “Theta method”?(Assimakopoulos and Nikolopoulos, 2000)
How to do it Set drift equal to half the slope of a regression on time Then add a fixed drift to simple smoothing, or Set the trend parameter to zero in Holt’s linear trend
When to do it Unknown
9
Adaptive simple smoothing (Taylor, 2004)
Smooth transition exponential smoothing (STES) is the only adaptive method to demonstrate credible improved forecast accuracy
The adaptive parameter changes according to a logistic function of the errors
Model-fitting is necessary
10
Renormalization of seasonals Additive (Lawton, 1998)
Without renormalization Level and seasonals are biased Trend and forecasts are unbiased
Renormalization of seasonals alone Forecasts are biased unless renormalization is done
every period
Multiplicative (Archibald & Koehler, 2003) Competing renormalization methods give forecasts
different from each other and from unnormalized forecasts
11
Archibald & Koehler (2003) solution
Additive and multiplicative renormalization equations that give the same forecasts as standard equations
Cumulative renormalization correction factors for those who wish to keep the standard equations
12
Continental Airlines Domestic Yields
0.10
0.11
0.12
0.13
0.14
0.15
Jan-00 Jan-01 Jan-02 Jan-03 Jan-04 Jan-05
ModelRestarted
13
Standard vs. state-space methods Trend damping
Standard: Immediate State-space: Starting at 2 steps ahead
Multiplicative seasonality Standard: Seasonal component depends on level State-space: Independent components
Model fitting Standard: Minimize squared errors State-space: Minimize squared relative errors if
multiplicative errors are assumed.
14
Properties
Equivalent models Prediction intervals Robustness
15
Equivalent models Linear methods
ARIMA DLS regression Kernel regression (Gijbels et al.,1999; Taylor, 2004) MSOE state-space models (Harvey, 1984)
All methods SSOE state-space models (Ord et al.,1997)
16
Analytical prediction intervals Options
SSOE models (Hyndman et al., 2005) Model-free (Chatfield & Yar, 1991)
Empirical evidence None
17
Empirical prediction intervals Options
Chebyshev distribution (fitted errors) (Gardner, 1988) Quantile regression (fitted errors) (Taylor & Bunn, 1999) Parametric bootstrap (Snyder et al., 2002) Simulation from assumed model (Bowerman, O’Connell,
& Koehler, 2005)
Empirical evidence Limited, but encouraging
18
Robustness Many equivalent models for each method
(Chatfield et al., 2001; Koehler et al., 2001)
Simple ES performs well in many series that are not ARIMA (0,1,1) (Cogger,1973)
Aggregated series can often be approximated by ARIMA (0,1,1) (Rosanna & Seater, 1995)
19
Robustness (continued)
Exponentially declining weights are robust (Muth, 1960; Satchell & Timmerman, 1995)
Additive seasonal methods are not sensitive to the generating process (Chen,1997)
The damped trend includes numerous special cases (Gardner & McKenzie,1988)
20
Automatic forecasting with the damped additive trend
= .84
= .38 = 1.00
21
Summary of 66 empirical studies,1985-2005
Seasonal methods rarely used Damped trend rarely used Multiplicative trend never used Little attention to method selection But exponential smoothing was robust,
performing well in at least 58 studies
22
Method selection
Benchmarking Time series characteristics Expert systems Information criteria Operational benefits Identification vs. selection
23
Benchmarking in method selection
Methods should be compared to reasonable alternatives
Competing methods should use exactly the same information
Forecast comparisons should be genuinely out of sample
24
Method selection: Time series characteristics
Variances of differences (Gardner & McKenzie,1988)
Seemed a good idea at the time
Discriminant analysis (Shah,1997)
Considered only simple smoothing and a linear trend Should be tested with an exponential smoothing
framework
Regression-based performance index (Meade, 2000)
Considered every feasible time series model Should be tested with an exponential smoothing
framework
25
Method selection: Expert systems Rule-based forecasting
Original version (Collopy & Armstrong, 1992)
Automatic version (Vokurka et al., 1996)
Streamlined version (Adya et al., 2001)
Other rule-induction systems(Arinze,1994; Flores & Pearce, 2000)
Expert systems are no better than aggregate selection of the damped trend alone (Gardner, 1999)
26
Method selection: AICDamped trend vs. state-space models selected by AIC:
Average of all forecast horizons
8
10
12
14
16
18
20
111 1,001 M3 Ann. M3 Qtr. M3 Mon.
Damped trend
State-space
MAPE Asymmetric MAPE
27
Method selection:Empirical information criteria (EIC)
Strategy: Penalize the likelihood by linear and nonlinear functions of the number of parameters (Billah et al., 2005)
Evaluation: EIC superior to other information criteria, but results are not benchmarked
28
Method selection: Operational benefits
Forecasting determines inventory costs, service levels, and scheduling and staffing efficiency.
Research is limited because a model of the operating system is needed to project performance measures.
29
Method selection: Operational benefits (cont.) Manufacturing (Adshead & Price, 1987)
Producer of industrial fasteners (£4 million annual sales)
Costs: holding, stockout, overtime
U.S. Navy repair parts (Gardner, 1990) 50,000 inventory items Tradeoffs: Backorder delays vs. investment Savings: $30 million (7%) in investment
30
Average delay in filling backorders
Damped trend
Simple smoothing
Linear trend
Random walk
25
30
35
40
45
50
370 380 390 400 410 420 430
Inventory investment (millions)
Backo
rde
r d
ays
31
Inventory analysis: Packaging materials for snack-food manufacturer
Month$0
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
Target maximum inventory based on damped trend Monthly
Usage
Actual Inventory from
subjective forecasts
Month
32
Method selection: Operational benefits (cont.) Electronics components (Flores et al., 1993)
967 inventory items Costs: holding cost vs. margin on lost sales
RAF repair parts (Eaves & Kingsman, 2004) 11,203 inventory items Tradeoffs: inventory investment vs. stockouts Savings: £285 million (14%) in investment
33
Forecasting for inventory control:Cumulative lead-time demand
SSOE models yield standard deviations of cumulative lead-time demand (Snyder et al., 2004)
Differences from traditional expressions (such as ) are significant
timeLeads
34
Standard deviation multipliers, α = 0.30
Lead time
0
1
2
3
4
5
2 3 4 5 6
TraditionalCorrect
35
The parametric bootstrap (Snyder et al., 2002) can estimate variances for: Any seasonal model Non-normal demands Intermittent demands Stochastic lead times
Forecasting for inventory control:Cumulative lead-time demand (cont.)
36
Forecasting for inventory control:Intermittent demand
Croston’s method (Croston, 1972)
Smoothed nonzero demandMean demand = Smoothed inter-arrival time
Bias correction (Eaves & Kingsman, 2004; Syntetos & Boylan, 2001, 2005)
Mean demand x (1 – α / 2)
37
Forecasting for inventory control: Intermittent demand (continued) There is no stochastic model for Croston’s
method (Shenstone & Hyndman, 2005) Many questionable variance expressions in the
literature The state-space model for intermittent series requires
a constant mean inter-arrival time (Snyder, 2002)
Why not aggregate the data to eliminate zeroes?
38
Progress in the state of the art, 1985-2005
Analytical variances are available for most methods through SSOE models.
Robust methods are available for multiplicative trends and adaptive simple smoothing.
Croston’s method has been corrected for bias. Confusion about renormalization of seasonals has
finally been resolved. There has been little progress in method selection. Much empirical work remains to be done.
39
Suggestions for research Refine the state-space framework
Add the damped multiplicative trend Damp all trends immediately Test alternative method selection procedures
Validate and compare method selection procedures Information criteria – Benchmark the EIC Discriminant analysis Regression-based performance index
40
Suggestions for research (continued) Develop guidelines for the following choices:
Damped additive vs. damped multiplicative trend Fixed vs. adaptive parameters in simple smoothing Fixed vs. smoothed trend in additive trend model Standard vs. state-space seasonal components Additive vs. multiplicative errors Analytical vs. empirical prediction intervals
41
Conclusion
“The challenge for future research is to establish some basis for choosing among these and other approaches to time series forecasting.” (Gardner,1985)