3rd SOL and Divertor ITPA Meeting G. Federici, ITER
G. FedericiITER JWS Garching
Outline• Highlights of PFC design &
material selection• Erosion during transient
heat loads• Remaining open questions• Summary
Materials Selection and Engineering Design of ITER PFCs
2nd SOL and Divertor Physics ITPA Meeting, Ioffe Institute, St. Petersburg - July 14-17, 2003
2
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
Rationale for material selectionPresent choice: 3 different materials
Advantages Drawbacks
Be Good O2 gettering capability ~ tokamak practice (mainly JET); low Z; repairability by plasma-spraying; established joining technology; low tritium inventory.
Inadequate for the divertor (Tm<1300˚C). Be dust on ‘hot’ surfaces -> H
production due to reactivity with steam during accidents.
Compatibility with Type I ELM loads disruptions or ‘mitigated’ disruptions.
C Good power handling, thermal shock
and thermal fatigue resistance; does not melt (but sublimes); low radiative power losses with influx
to plasma due to low Z; well established joining technology; broad tokamak operation experience.
Chemical erosion --> erosion lifetime (~few thousand pulses).
Tritium codeposition --> needs adequate recovery methods.
W low physical sputtering yield and high
sputtering threshold energy; no chemical sputtering in H-plasma; low tritium inventory; repairability by plasma-spraying; well established joining technology.
Plasma compatibility-->favourable operation experience from ASDEX-Upgrade, dust radiological hazard.
Near strike points, its operational lifetime, has still uncertainties due to melt layer loss during disruptions and ‘large’ ELMs.
ITER
3
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
• Total power Q 150 MW• Nominal surface heat loads q = 10 MW/m2, = 400-500 sec, N = 3000 cycles (1st div.)
• Transient heat load q = 20 MW/m2, = 10 sec, N = 300 cycles (i.e., 10%)• Disruption heat load Q = 10-100 MJ/m2, = 0.110 ms, N = 300 event (i.e., 10%) • Ion flux parameters J = 1021-1024 m-2s-1, E = 10-100 eV
• Neutron load J(E>0.1MeV)1018 m-2s-1, D = ~0.1 dpa
• Other factors electromagnetic loads (P 4 MPa), H environment, etc.
0.560.56
1.341.34
2.352.35
3.473.47
4.234.23
Code simulation of surface heat flux on divertorCode simulation of surface heat flux on divertor
Strike Strike pointspoints
Divertor design loads/lifetime ITER
W/m2
4
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
• The PFCs and cassette body combine to provide adequate shielding to the vessel and the coils.
• The divertor comprises 54 cassettes installed in ITER via 3 equi-spaced handling ports.
• Each cassette consists of a cassette body onto which are mounted 3 PFCs.
• These PFCs can be exchanged in hot cell in order to refurbish or to change the geometry of the divertor.
• Several complete exchanges are foreseen during the life of ITER.
• The cassettes are accurately positioned in the vessel such that each PFCs is aligned within ±2mm with respect to the PFCs on adjacent cassettes.
Design assembly/maintenance ITER
5
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
Tungsten has still uncertainties due to melt layer loss during disruptions and ‘large’ ELMs.
Maintain option to switch to an all-W divertor, prior or during T-operation. This option will be considered if
we do not succeed in mitigating the effects of T co-deposition (need to be to be determined during D-phase):
Design mitigation/temperature tailoring.Mixed-material effects (=>need to use existing tokamaks).
we fail in developing reliable and effective techniques of in-situ tritium removal, which need to be demonstrated/tested in tokamaks.
there is substantial progress in mitigating heat loads during disruptions and ELMs.
CFC
W
Initial operation strategyCurrent strategy is to initially install CFC on the targets
ITER
Urgent need for development PMI diagnostics to be tested validated in existing tokamaks and during early operation with D in ITER.
6
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
First-wall design loads/lifetime• Total power Q 690 MW• Surface heat loads q = 0.25 MW/m2 (avg.) 0.5 max.
= 400-500 sec, N = 30000 cycles• Disruption heat load None.• VDEs: q = 60 MW/m2, = 300 ms
N=300 cycles (1%), • Neutron load 0.56 MW/m2 (avg.) / 0.78 (max)
D = ~1 dpa.
ITER
• 412 blanket modules attached to the vessel.
– ~4.5 t/module RH constraint.
– steel shielding block
– separate first wall panels.
7
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
Design assembly/maintenanceSeparate first-wall to minimise the operational waste
• Each blanket module is connected to a permanent water cooling manifold by two pipes.
• The FW part repairable and/or replaceable in hot-cell.
• The modules are maintained by a special remotely driven in-vessel transporter inserted through the equatorial port.
ITER
8
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
– Option A: attachment with bolts and small shear ribs to support EM loads and to prevent sliding due to thermal expansion.
– Option B: central beam attachment connected to the shield block on the rear side.
Separate first-wall conceptsThe FW has 4 or 6 separate panels depending on the option chosen for FW attachment.
ITER
9
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
Remote handling classificationbased on need for scheduled and unscheduled maintenance and modifications, likelihood for maintenance, and impact on operations and availability
Divertor is Class 1: • Requires scheduled maintenance or replacement.• Component design and RH equipment and procedures, optimised to ensure task completion within a minimum time.• Feasibility of maintenance tasks demonstrated with R&D during EDA.• Demonstration using real components during initial assembly prior to active phase of operation is highly desirable.
Blanket is Class 2:• Do not require scheduled but likely unscheduled or very infrequent maintenance.• Components are designed for full remote repair or replacement but “minimisation of repair is subordinate to
consideration on nuclear performance and reliability”.• Feasibility of maintenance tasks partially demonstrated with R&D during EDA.• Demonstration using real components during initial assembly prior to active phase of operation is desirable.
ITER
10
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
• Divertor cassette refurbishment
– 18 cassettes --> 1 RH port =>2 months (7 working day/week, 2 (8 hrs) wk shifts/day, 1 cask transporter (8 hrs/shift/day).
– 3 RH ports in series ==> 6 months
– Replacement of 1 single faulty cassette ≤ 2 months!!
• Blanket maintenance
– Replacement of some shield modules is likely due to local damage.
– Replacement of the full first wall is presently not anticipated, but should be feasible.
– 1 blanket module:25 days
– 1 toroidal row: 32-151 days *– All blanket modules: 276-916 days ** Depends on # of deployed IVT.
• Current design policy: small number of spare parts.
Maintenance time estimatesIn-vessel components are removed from the VV by 4 equatorial ports,
3 divertor ports and (?) upper ports (EC and diagnostics).
ITER
11
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
Critical PFC design/operation issues ITER
• Heat loads and erosion during type I ELMs Ongoing vigorous ITPA effort, EU PWI task force
• Heat loads and erosion during thermal quench disruptions and VDEs Ongoing vigorous ITPA effort, EU PWI task force
• Hydrocarbon transport/T codeposition in remote areas and removal Surveys in tokamaks (EU PWI task force)
• Identify source and sinks.• Deposition patterns and dependence on operation parameters.• Composition of exhaust.
Laboratory simulations (EFDA, EU PWI task force) • Sticking of radicals.• Effects of temperature, H/C ratios, etc.• Mixing of materials (C/Be)
12
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
Heat loads and erosion during type I ELMsTolerable ELMs in ITER set by materials: Tplate
ELM < physical limits (evap., melting).ITER
Critical parameters are: (1) energy loss from pedestal, (2) fraction reaching the divertor, (3) wetted area, (4) duration/shape of ELM heat pulse.
Knowledge of these quantities still uncertain.
Temp. excursions during ELMs=> no ratcheting!!!
Triang. ELMs, 0.3 ms, 1 MJ/m2(1) BOL: 20 mm CFC, 10 mm W.
(2) EOL: 2 mm CFC, 2 mm W.
Only near-surface ≤400µm=> Steep Temp. gradients
13
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
• CFC and W show similar ELM erosion lifetime. Lifetime for W depends on melt layer loss.
• Erosion lifetime shorter if one use a statistical evaluation of ELM parameters.
• More inclined divertor target performs better.
• Compatibility of inter-ELM plasmas with irregular W surface remains an issue.
• Additional macroscopic erosion mechanisms due to high frequency pulsing and high temperature excursions localised in the near-surface (<400µm).
ITER
Armour material
For W assume 50% melt loss.
CFC W
Baseline divertor design• All ELMs w. same parameters• Statistical evaluation
9 MJ
4 MJ
10 MJ
3 MJ
More inclined divertor target• All ELMs w. same parameters• Statistical evaluation
15 MJ
6 MJ
17 MJ
5 MJ
Tolerable ELM sizeA large number of ELMs >1 MJ/m2 cannot be tolerated
ITER
In ITER: Wped ~ 100 MJ, nped ~8x1019 m-3,
Tped~3.5 keV, w~10 cm =>low collisionality (ped ~0.04)
• Scaling to ITER - WELM/Wped:
ped 15%-20% --> 15-20 MJ.
//10%-15% --> 10-15MJ.
nped/nGW 4%-5% --> 4 -5 MJ.
• 50-70% of energy is deposited in divertor;• Wetted area: 4.5 -9 m2 with modest (~50%) broadening;
• impact time > // µsIR/ // =1.5-3.1.
14
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
Where does the Rest of WELM go ? 1) Toroidal Asymmetries (probably No)2) Main Chamber (probably Yes)3) Transiently enhanced PRAD
ELM
(probably No)
WELMdiv ~ 50 – 80 % of WELM
dia
A non-negligible fraction of the ELM energy from the main plasma reaches the main chamber wall
JET
– T
ype
I E
LM
ITER
Despite narrow @ELM WELM
div/WELM ~ 0.6
15
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
ITEREffects of type I ELMs at the main chamber wall
Expect interaction with protruding surfaces (~1 m2) ==> tolerable only 1-2 MJ depending on duration (if ≥ 1 ms no melting of W)
16
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
• If the JET results extrapolate to ITER then disruptions would not damage a W target.• However, it is not known at the moment where and by what processes the missing and
thermal an magnetic energies are deposited in the main chamber. • If this energy deposition is not sufficiently uniform, then additional damage to main
chamber components might be expected.
Evolution of the surface temperature near and far from strike points in a Wth=5.6 MJ
Thermal Quench DisruptionsOnly a fraction of the energy reaches the divertor and is distributed rather uniformly.
ITER
G. Matthews et al., 19th IAEA FEC 2002, LyonTo appear in Nucl. Fusion.
17
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
ITERITER thermal quench specificationsNeed to be revisited on the basis of the new findings (ongoing)
0.1
1
10
100
0 5 10 15 20 25 30
Dis
rup
tio
n e
ne
rgy
de
nsit
y,
MJ
/m2
SOL broadening, lambdaplate
/lambdamid
Current ITER specifications
Wdiv
/ Wdia
=100%
Wdiv
/ Wdia
=50%
Wdiv
/ Wdia
=10%
G. Federici, ITER JWS Garching, 7 Oct. 2002
Absence of melting for W
lambdamid
=5 mm
• If energy deposited in the divertor during disruptions is < 40% of the thermal energy with a broadening of the order 20-30 times, energy density at the target remains below the melting threshold for W.
• Some shallow melting can nevertheless take place some times.
Case 1
Case 2
Concern remains on whether generation during ELMs/disruptions of surface irregularities in tungsten due to melting, and in CFC due to brittle destruction, might form hot spots during normal operation.
18
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
• The thermal energy density in ITER (plasma stored thermal energy/ wall surface area) is ~350 MJ/800m2 = 0.45 MJ/m2.
• This energy density sets the minimum time in which the plasma thermal energy can be radiatively dissipated to the wall before melting/ablation occurs.
• The allowed time scales for ITER w. Be first wall is closed to the limits set by the MHD time scale.
• Assuming uniform (spatial and temporal) dissipation tlim≥0.5 ms.
• Assuming a PF of 1.5-2 tlim≥2 ms.
ITEREffects of ‘mitigated’ disruptions
Allowed time scale for energy dissipation (see talk of D. Whyte)
G. Federici, G. Strohmayer 3/2003
Melting as a function of deposited energy
19
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
ITERParametric analyses of VDE effectsVDE parameters: 60 MJ·m-2, 300 ms, 1% UncertaintiesMelting - comparison Be and W
10 mm 2 mm
WB
e
<10 MJ/m2 t≥500 ms avoid melting <10 MJ/m2 t>500 ms avoid melting
<10 MJ/m2 t>100 ms avoid melting <10 MJ/m2 t>100 ms avoid melting If t=500 ms no melting up to 70 MJ/m2 If t=500 ms no melting up to 30 MJ/m2
20
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
ITERParametric analyses of VDE effectsTemp. excursions at Cu interface - comparison Be and W
10 mm 2 mm
WB
e
TCu melting
TCu melting Problems!! We need at least 5 mm W
21
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
• Type I ELM and disruption heat loads - energy loss, energy to divertor and wall, duration, broadening, impurities, etc.; (ITPA, JET TF, EU PWI TF)
• Mitigation of disruptions (ITPA, JET TF, EU PWI TF); • Effect of mitigated disruptions on Be wall (ITPA); • Material damage due to ELMs/disruptions (Russia, EU PWI TF);• Erosion - mixed material effects (PISCES-B/EFDA)• Explain co-deposition in existing machines (ITPA, JET & EU PWI TFs);• Mitigation of co-deposition (temperature tailoring, reactive species (N2)); • Monitor CxHy deposits on cryopumps (JET, AUG);• Carbon removal - e.g. baking with oxygen - temperature, hold time (???);• Dust generation - volume, location, BET, mobilisation.• Plasma interaction with irregular and/or molten W surfaces.• Measurements/diagnostics
Future Work/ Open Questions3-5 years before starting PFC material procurement for ITER
Current efforts: EU task force on PWI / ITPA work
ITER
22
3rd SOL and Divertor ITPA Meeting G. Federici, ITER
• According to current ITER construction plans, 3-5 years are available for further R&D and physics input to divertor/first-wall design and PFM choice.
• We take a big risk if we construct ITER without first testing/validating proposed material mix in an existing tokamak.
• We should reduce to a minimum the extent that ITER has to be a PMI experiment and explore all these effects before hand in existing machines.
• In case we retain CFC armour and use it during T operation a reliable method to remove the codeposted layers and control T-uptake is required.
• Type-I ELMs are still challenging for the ITER divertor and design optimisation is ongoing. Power deposition on the first-wall is still uncertain.
• IF JET divertor results extrapolate to ITER, the large majority of disruptions would not lead to melting a W target. Compatibility of plasma with irregular W surfaces and macroscopic C erosion and impact on operation/performance require investigations.
• ITER divertor design has enough flexibility. Feasibility of maintenance has been demonstrated. For the first-wall only infrequent maintenance is anticipated and feasibility demonstration is needed.
SummaryOpportunities and challenges
ITER