09/12/2009 SWIM-SUIT User Forum, Rome
SWIM-SUITSWIM-SUITProject Overview Project Overview
Giuliano d’AuriaSELEX Sistemi Integrati
Project Coordinator
09/12/2009 SWIM-SUIT User Forum, Rome
Why SWIM-SUIT?Why SWIM-SUIT?
ATM Network
Tec
hn
ical
En
able
r
Tec
hn
ical
En
able
r
SW
IM
Tec
hn
ical
En
able
r
Tec
hn
ical
En
able
r
•SWIM is a key enabler of the future ATM vision
09/12/2009 SWIM-SUIT User Forum, Rome
Why SWIM-SUIT?Why SWIM-SUIT?
•How strong are the foundations?
ATM Network
Technical Enabler Technical Enabler
Technical Enabler
Technical Enabler
SW
IM
09/12/2009 SWIM-SUIT User Forum, Rome
SWIM-SUIT ObjectivesSWIM-SUIT Objectives
SWIM Prototype
Specification of the requirements for the SWIM implementation
Validation of the technologies identified as enablers of the SWIM concept
Assessment of the Organisational, Legal and Financial Implications
SW
IM F
EA
SIB
ILIT
Y
09/12/2009 SWIM-SUIT User Forum, Rome
Consortium CompositionConsortium Composition
09/12/2009 SWIM-SUIT User Forum, Rome
Consortium CompositionConsortium Composition
09/12/2009 SWIM-SUIT User Forum, Rome
Consortium CompositionConsortium Composition
09/12/2009 SWIM-SUIT User Forum, Rome
Consortium CompositionConsortium Composition
09/12/2009 SWIM-SUIT User Forum, Rome
Consortium CompositionConsortium Composition
09/12/2009 SWIM-SUIT User Forum, Rome
Consortium CompositionConsortium Composition
09/12/2009 SWIM-SUIT User Forum, Rome
Consortium CompositionConsortium Composition
09/12/2009 SWIM-SUIT User Forum, Rome
Consortium CompositionConsortium Composition
09/12/2009 SWIM-SUIT User Forum, Rome
Consortium CompositionConsortium Composition
09/12/2009 SWIM-SUIT User Forum, Rome
Consortium CompositionConsortium Composition
09/12/2009 SWIM-SUIT User Forum, Rome 15
Consortium at a GlanceConsortium at a Glance
• 10 Countries• 20 Partners• 6 Industries• 1 Airport Managing Company• 2 Airlines• 2 ANSPs• 4 SMEs• 2 Research Centres• 1 University
•User Group
•Budget:•11,8 M€•6,3 M€ funded by EC
•Support:
09/12/2009 SWIM-SUIT User Forum, Rome 16
The positioning of SWIM-The positioning of SWIM-SUITSUIT
SESAR Development Phase
SESAR Definition phase
FOIPS
OATA
FAA SWIM
ICOG
OATA MCS
CFMU FOS
SWIM WP8-14
SW
IM-S
UIT
09/12/2009 SWIM-SUIT User Forum, Rome 17
The Road to SWIM-SUITThe Road to SWIM-SUIT
Requirements Design Integration Validation
WP0ECEuropean
Commission
WP1
Information Management Users
Requirements
WP2
SWIM Design, Development and
Testing
WP3
Test Bed Integration and Testing
WP4
Validation
WP5
Financialand
Institutional
Financial & Institutional
09/12/2009 SWIM-SUIT User Forum, Rome01/10/2009 18
The Road to SWIM-SUITThe Road to SWIM-SUIT
Requirements Design Integration Validation
WP1
Information Management Users
Requirements
WP2
SWIM Design, Development and
Testing
WP3
Test Bed Integration and Testing
WP4
Validation
WP5
Financialand
Institutional
User Group
WP0ECEuropean
Commission
Financial & Institutional
09/12/2009 SWIM-SUIT User Forum, Rome 19
SWIM-SUIT PrototypeSWIM-SUIT Prototype
ISPOC Prototype
ATFCM
(CFMU)
ACC/APP
ACC
AOCAOC Flight Simulator
FMS
EAD
USA SWIM
Acquire Data
MXP AIRPORT Heathrow
A-CDM
09/12/2009 SWIM-SUIT User Forum, Rome 20
SWIM-SUIT PrototypeSWIM-SUIT Prototype
MXP AIRPORT Heathrow
A-CDM
ISPOC Prototype
ATFCM
(CFMU)
ACC/APP
ACC
AOCAOC Flight Simulator
FMS
EAD
Disseminate Data
USA SWIM
09/12/2009 SWIM-SUIT User Forum, Rome 21
SWIM-SUIT PrototypeSWIM-SUIT Prototype
ATM Virtual Information Pool
AVI POOL
AOCAOC
MXP AIRPORT Heathrow
A-CDM
ISPOC Prototype
ATFCM
(CFMU)
ACC/APP
ACC
Flight Simulator
FMS
EAD
USA SWIM
09/12/2009 SWIM-SUIT User Forum, Rome01/10/2009 FABEC CDSTF Meeting 22
SWIM SUIT:SWIM SUIT:Achievements and Next Achievements and Next StepsSteps
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 42007 2008 2009 2010
WP1
WP2
WP3
WP4
WP5
D.1.2.1:•Information Content& Services Requirements
D.1.3.1: •Preliminary FHA report
D.1.5.1:•Overall SWIM Users Requirements
D.1.4.1:Information Security Requirements
D.1.6.1:SWIM PrototypeRequirements
D1.6.3Preliminary Validation Plan
09/12/2009 SWIM-SUIT User Forum, Rome01/10/2009 FABEC CDSTF Meeting 23
SWIM SUIT:SWIM SUIT:Achievements and Next Achievements and Next StepsSteps
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 42007 2008 2009 2010
WP1
WP2
WP3
WP4
WP5
D.2.2: Report on candidate technology and service options
D.2.3.1:Information Model and Services
D.5.2.2:Cost benefit analysis Methodology
D.2.4.2:SSDD
D.4.2.1:•Validation Plan
09/12/2009 SWIM-SUIT User Forum, Rome01/10/2009 FABEC CDSTF Meeting 24
SWIM SUIT:SWIM SUIT:Achievements and Next Achievements and Next StepsSteps
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 42007 2008 2009 2010
WP1
WP2
WP3
WP4
WP5
Valid
atio
n
PrototypingSessions
D.1.7.1:•Overall SWIM Users Requirements - Final
D.5.2.4 - D.5.2.7 •CBA
D.4.4.1:•Validation Report
D.5.3.1:•Organisational and Legal implications
D.4.5.1:•Lessons Learned and Recommendations
09/12/2009 SWIM-SUIT User Forum, Rome
Questions and FeedbackQuestions and Feedback
http://www.swim-suit.aero/swimsuit/