DESCRIPTION
http://www.elia.be/sitecore/shell/Controls/Rich%20Text%20Editor/~/media/files/Elia/About-Elia/Users%20Group/Plenaire_vergadering-Agenda2012/09-02-2012/09022012Plenaire%20vergadering2FeedbackWGBelgiangrid.pdf
Citation preview
13.02.2012 Auteur changer dans le masque de titre
WG Belgian GridFeedback to Users’ Group
Frank Wellens
08/12/2011
213.02.2012 Aueur changer dans le masque des diapositives
Meeting 31/01:• Proposals “Title III Technische voorschriften voor aansluiting” (Art. 41 – art 78)• Drivers for proposals: Bottom-up (dateert van 2002; update; nieuwe concepten);Top-down (Code ENTSO-e; harmonisation concepts)• First proposals to WG Belgian Grid but subjected to modifications (nieuw release ofNC RfG) => final proposals : september 2012
Meeting 21/02:• White paper “Réservation de capacité des unités de production”• Adaptations “processus de raccordement” (based on work done by WGBG 2011)• NC Entso-e & impacts FTR
Next meetings (March – June)Issues already identified for proposals for adaptations= closed distribution system (v. meeting 15/12/2011); local production; safety;capacity reservation for production units (depending conclusions White Paper); reactive energy;
principles for ARP (to be shared with WG SO) ; metering ; grid development
1. Traject Analysis Federal Grid Code
313.02.2012 Aueur changer dans le masque des diapositives
2. Closed distribution systems1. Position Paper Users’ Group
« relatif à la mise en œuvre opérationnelle du concept de Closed Distributionsystems au niveau du réseau d’Elia »On hold
2. Model Closed distribution systemsDiscussions on operational aspects : 15/12 & 31/1- Applicability of UMIX rules on data exchanges to Elia (allocation sets of
data) and to suppliers :- presentation of UMIX rules on data exchanges applicable to ARM meters (timing +set of data)- presentation of UMIX communication lay-out
- Identification of ARP actif on CDS- Generation of EAN codes for CDS users- Aggregation of individual CDS points/ users as a global ARP perimeter- Relations between Elia, CDS network operator and suppliersNext steps : integration of the comments within the new contractual document
between Elia & CDS network operator (up to now new annex to accesscontract) => new draft document : March 2012
413.02.2012 Aueur changer dans le masque des diapositives
3. European Network Codes “connexion”meeting 21/02
Two Network Codes in the pipe for WG Belgian Grid:- final ENTSO-e Draft « Requirements for grid connection applicable
to all Generators »- ENTSO-e Draft « Demand Connection Code »
Presentation of the NC: topics & issues
Formal consultation process:Preparation of the UG’s members to formal consultation process