Project:- Date:- 07/12/2017 PCP NGR:- 511161 144356
Exchange:- Post Code:- RH5 6NH KN Order No:- 1049706 DSLAM NGR:- 511173 144354
KN Group 01634 683635 PCP No:-
DSLAM to JB route Power route
Metres Red Amber Green
Tel Number: DSLAM Power
Excavation to LV15.8
01483 505050 PCP to DSLAMN/A
Tel Number: Tie Pair Cable Length
03456 009 009 DSLAM to JB6.5
HighwaysNo Issues
Town PlanningLN in CA
BDUKSurface Type
Soft
WAYLEAVE REQUIRED - SEE FTTC FOR MORE INFOEarth Required
NO
ABG _PCP 007 _LP
Re-Build Joint BoxNO
Re-Shell
007
02/01/2018
LPA:
Highways Authority:
Surrey County Council
Exchange
Abinger
Contact Name:
Date of Search
Location:-
OPP to Manor Cottage, Horsham Road, Abinger
BT Openreach
Contact Name:
Abinger
Guildford Borough Council
This montage is for illustration purposes to show approximate positioning of the DSLAM Cabinet. Not to scale.
WAJMGR7H 23/01/2018
WAJMGR7H
Detail of PCP cabinet
ABG _PCP 007 _CP
No of Ducts in PCP N/A
WAJMGR7H
DSLAM TYPE:
Huawei 288
Huawei 96 PCP no.
Huawei AIO 1
ECI 256
FTTC
Surveyor Checklist PRE-SURVEY REQUISITES
The following minimum documentation is required to complete the survey :
• Utility Company power print• Conservation area data
•OS map or PIPeR print • Tie pair volume requirements
• Duct print • A55 blank
SURVEY COMPLETION DETAILS :
EXISTING PCP INFORMATION :
511161 144356
(1) Grid Reference to be determined from PIPeR or OS mapping)
YES NO x
YES NO x
YES NO x
YES NO x
YES NO x
YES x NO
YES x NO
YES NO x
YES NO x
YES NO x
YES x NO
For any questions answered YES, please supply brief detail in box overleaf
Council attendee name (if any)
Within floodplain
Two man working necessary
07/12/2017
Surveyor’s name
Planning office
Region / Zone
Busy junction
Red Route
Surveyor
Tel.
Enterprise - Scott Long
01634 683635
Harlequin
Survey completion date
007
Exchange name
Within school “Keep Clear” area
Surveyor OUC
Check box to confirm WFMT task opened (mandatory pre-survey action )
Exchange Area
Within hospital “Keep Clear” area
RH5 6NH
Abinger
Within conservation area
PCP Location
Overhead cable hazard
Traffic sensitive street ( TMA )
Private road
Postcode
PCP number
Other parking restrictions / difficulties
12 digit ref. (1)
007
OPP to Manor Cottage, Horsham Road, Abinger
Abinger
FTTC Surveyor Checklist 5 Issue 3b - 27 January 2010
EXISTING PCP INFORMATION (contd.)
Existing PCP type :
1 2 3 4 4A
5 6 6A 6B 6C
6L 7/5 7/7
Condition of PCP (eg. Good) :
Obstructions within 10 metres of PCP, showing distance and nature (eg. tree)mtrs
Any other information relevant to location hazards or potential obstructions :
BDUK
Volume of each connector type in groups of 100 pairs :
E side D side
E side D side
E side D side
E side D side
E side D side
E side D side
E side D side
EXISTING PCP INFORMATION (contd.)
Spare capacity currently available in PCP :
E side D side
E side D side
(capacity is as determined by physical on-site inspection, not by CSS interrogation)
Spare capacity potentially available in PCP by grooming :
E side D side
E side D side
(capacity is as determined by physical on-site inspection, not by CSS interrogation)
Completely spare blocks
Completely spare verticals
Internal condition
Above
Completely spare verticals
MS2
AIO cabinet could not be located in OR's planned location due to BT ducts, AIO cabinet located within 10m of planned location. Traffic
management required for ducting in the carriageway for power. No gas shown on gas map, AIO may be close to gas, excavate with
caution. WAYLEAVE REQUIRED FOR DSLAM FROM PROPRIETOR: SHERE PARISH COUNCIL of Tanyard Hall, 30 Station Road,
Gomshall, Guildford GU5 9LF.
DSLAM CLOSE TO GAS, EXCAVATE WITH CAUTION.
Left
External condition
Back
Older type PCP 100 verticals
SCC 1 crimps
SCC 2 crimps
Quante HDMCCS
Door lock type
nature of obstruction
Front (to kerb)
Right
Completely spare blocks
Mox ( Bix )
KRONE MCCS
FTTC Surveyor Checklist 6 Issue 3b - 27 January 2010
Reshell :
YES NO
Earth bonding :
YES NO X
PHOTOGRAPHS
The following photographs are required (unless impossible due to obstructions) :
(1) include indication or marker, to show the proposed positioning of the DSLAM cabinet.
FOOTWAY BOX
Show type and duct capacity :
empty semi* full
2 1 1
2 1 1
0
2 2
(* “semi” filled indicates space for at least 2x 100-pair cables)
DSLAM CABINET
Proposed location :
(1) Grid Reference to be determined from PIPeR or OS mapping
(2) Distance from inside edge (ie. pavement side) of kerbstone to front edge
of prospective DSLAM (NB. must be a minimum of 1.2 metres).
Is a re-shell the only viable way to provide sufficient
capacity ?
DSLAM to kerbstone distance (2)
51117312 digit ref. (1)
OPP Manor Cottage, Holmbury St. Mary
No. of ducts in REAR wall
No. of ducts in FRONT wall
2
RH5 6PDPostcode
Footway joint box type
Secondary Address (nearest property incl. street no.)
Town
No. of ducts in LEFT wall
Dorking
Horsham Road
144354
JF6
x
Earth bonding required
PCP – Right
x
Primary Address (street name only of DSLAM)
PCP – Left
F/w Box - Internal
No. of ducts in RIGHT wall
PCP - Internal DSLAM location (1)
PCP – Front
PCP – Rear
FTTC Surveyor Checklist 7 Issue 3b - 27 January 2010
Tie cables (PCP to DSLAM) :
Power cable duct length (nearest powerline to DSLAM) :
END
Confidentiality
OwnerBrian Pull : NEJ/NGA Process Management
© British Telecommunications plc 2010
Grass / Soil
(mtrs)(mtrs)
Carriageway
Duct length through …
(mtrs)
All information in this document is provided exclusively for planning purposes within Openreach, and shall not be be
transmitted, published or disclosed wholly or in part to any other party, or for any other purpose, without prior written
permission.
Tie pair cable length …
Number of tie pairs required …200
(mtrs)
Any Utilities Missing? (note which ones)
2.5
Cable and Water
0.3 13
These obligations shall not apply to information contained herein, which becomes known legitimately from sources other than
Openreach.
Duct length through …
(mtrs)
(mtrs)
FootwayGrass / Soil Carriageway
Footway
6.5
FTTC Surveyor Checklist 8 Issue 3b - 27 January 2010
Project:- Date:- 07/12/2017 PCP NGR:- 511161 144356
Exchange:- Abinger Post Code:- RH5 6NH KN Order No:- 1049706 DSLAM NGR:- 511173 144354
KN Group 01634 683635 PCP No:-
ABG _PCP 007 _DUCT
007
BT Openreach
Insert BT Duct Drawing Here
OPP to Manor Cottage, Horsham Road, Abinger
Location:-
Project:- Date:- 07/12/2017 PCP NGR:- 511161 144356
Exchange:- Abinger Post Code:- RH5 6NH KN Order No:- 1049706 DSLAM NGR:- 511173 144354
KN Group 01634 683635 PCP No:-
Electric Map
ABG _PCP 007 _ELEC
BT OpenreachLocation:-
007
INSERT ELECTRICITY MAP HERE
OPP to Manor Cottage, Horsham Road, Abinger
Project:- Date:- 07/12/2017 PCP NGR:- 511161 144356
Exchange:- Abinger Post Code:- RH5 6NH KN Order No:- 1049706 DSLAM NGR:- 511173 144354
KN Group 01634 683635 PCP No:-
Elec HV Map
ABG _PCP 007 _HV
OPP to Manor Cottage, Horsham Road, Abinger
007
BT Openreach
INSERT HV MAP HERE
Location:-
Project:- Date:- 07/12/2017 PCP NGR:- 511161 144356
Exchange:- Abinger Post Code:- RH5 6NH KN Order No:- 1049706 DSLAM NGR:- 511173 144354
KN Group 01634 683635 PCP No:-
Gas Map
ABG _PCP 007 _GAS
Location:-
BT Openreach
007OPP to Manor Cottage, Horsham Road, Abinger
INSERT GAS MAP HERE
Project:- Date:- 07/12/2017 PCP NGR:- 511161 144356
Exchange:- Abinger Post Code:- RH5 6NH KN Order No:- 1049706 DSLAM NGR:- 511173 144354
KN Group 01634 683635 PCP No:-
Utility Summary
ABG _PCP 007 _UT
Location:-
BT Openreach
OPP to Manor Cottage, Horsham Road, Abinger
007
INSERT UTILITY SUMMARY MAP HERE
Date:- 07/12/2017 PCP NGR:- 511161 144356
Post Code:- RH5 6NH KN Order No:- 1049706 DSLAM NGR:- 511173 144354
KN Group 01634 683635 PCP No:-
Line Drawing DSLAM CLOSE TO GAS, EXCAVATE WITH CAUTION.
ABG _PCP 007 _LD
DSLAM Power
Excavation to LV:15.8
PCP to DSLAM:
BDUK
Metres
DSLAM to Junction
Box:
511173
Metres
RH5 6PD
Location:-
OPP to Manor Cottage, Horsham Road, Abinger
BT Openreach
Measurements
Dorking
Project:-
Exchange:-
007
Abinger
DSLAM CABINET LOCATION:
OPP Manor Cottage,
Holmbury St. Mary
Horsham Road
WAYLEAVE REQUIRED - SEE FTTC FOR MORE INFO
N/A Metres
144354
Located AIO cabinet on wide grass verge to be close to
BT junction box. This is the best location for the AIO
cabinet in the vicinity, other locations discounted due to
narrow verges/footways, house fronts and services.
Pavement Width @
DSLAM:N/A Metres
6.5
This is for guidance only, this is not a utility print
Number Planning Policy Requirement Self Check (Yes or No?) Reason for not meeting planning policy
RDSLAM position is 2m to 50m from PCP (using
Duct print lengths).
N/A AIO Cabinet
NOTE: This distance is more critical than the
power duct distance or position.
2 1m space available either side of RDSLAM Yes
3 Additional space left around RDSLAM for adjacent
street furniture access and maintenance e.g. bus
stop, advertising hoardings &, phone kiosk.
Yes
Minimum 100mm space behind RDSLAM Yes
- for full length of fixed structure
Access to footpaths, drives and doors not blocked Yes
- with RDSLAM doors open
- including fire exits
RDSLAM plinth position is not over UG services,
BT duct, tree roots or existing foundations
Yes
check for surface scars
check for line of sight of services and BT duct
check for adjacent trees
check duct plans and routes
7Minimum of 1.2m distance between RDSLAM and
kerb edge on footpath (measured to the road side
edge)
Yes
8 RDSLAM is not positioned at kerb edge Yes
Householder potential issues avoided Yes
not in line of sight of front windows
not obstructing air bricks, basement, windows or
cellar access
RDSLAM cannot be used as a stepping stone
across boundary walls or fences.
If RDSLAM can be used as stepping stone has an
anti climb device been planned (Top Hat)
Highway potential issues avoided
Yes
RDSLAM not in vicinity of road junction or zebra
crossing
Do not obstruct sight lines from driveways and
junctions
Not obstructing road sign
Doors do not open into carriageway
11 RDSLAM not positioned under crown / canopy of
tree
Yes
12 RDSLAM not positioned in flood plain Yes
13 Please indicate if the position RDSLAM is on
public or adoped highway or council land. Any
RDSLAM planned on private land needs to be
agreed by Openreach Planning.
PRIVATE LAND WAYLEAVE REQUIRED - SEE FTTC FOR MORE INFO
10
5
1
4
6
9
Date:- 07/12/2017 PCP NGR:- 511161 144356
Post Code:- RH5 6NH KN Order No:- 1049706 DSLAM NGR:- 511173 144354
KN Group 01634 683635 PCP No:-
Project:-
Exchange:- Abinger Location:-
OPP to Manor Cottage, Horsham Road, Abinger
BT Openreach
007
Date:- 07/12/2017 PCP NGR:- 511161 144356
Post Code:- RH5 6NH KN Order No:- 1049706 DSLAM NGR:- 511173 144354
KN Group 01634 683635 PCP No:-
Title Register
Title Plan
OPP to Manor Cottage, Horsham Road, Abinger
007
Project:- BT OpenreachExchange:- Abinger Location:-
24815EBB.pdf
89BF3237.pdf
Project:- Date:- 07/12/2017 PCP NGR:- 511161 144356
Exchange:- Post Code:- RH5 6NH KN Order No:- 1049706 DSLAM NGR:- 511173 144354
KN Group 01634 683635 PCP No:-
PCP to JB route
Tel Number:
Surface
01483 505050PCP Type
Tel Number:New JB Type
03456 009 009
No of Ducts Soft Footway Carriageway
PCP to new JB
New JB to existing JB
PCP to existing JB
_PCP _LP
PCP location in
planned Location?Moved more than 10m?
Agreed by
BT OpenreachAbinger Location:-
OPP to Manor Cottage, Horsham Road, Abinger
007
LPA: Contact Name:
Guildford Borough Council
Highways Authority: Contact Name:
Surrey County Council
Exchange Date of Search
Abinger02/01/2018
This montage is for illustration purposes to show approximate positioning of the PCP Cabinet. Notto scale.
WAJMGR7H 23/01/2018
Date:- 07/12/2017 PCP NGR:- 511161 144356
Post Code:- RH5 6NH KN Order No:- 1049706 DSLAM NGR:- 511173 144354
KN Group 01634 683635 PCP No:-
Line Drawing
_PCP 007 _LD
Project:- BT OpenreachExchange:- Abinger Location:-
OPP to Manor Cottage, Horsham Road, Abinger
007
PCP CABINET LOCATION:
OPP to Manor Cottage,
Horsham Road, Abinger
RH5 6NH
511161 144356
Measurements
PCP to New
Junction Box:Metres
New Junction Box to
Existing Junction
Box
Metres
PCP to Existing
Junction BoxMetres
Pavement Width @
PCP:Metres
This is for guidance only, this is not a utility print