8/30/2017 1 18 th National Award for Excellence in Energy Management 2017 Hadapsar, Pune 30-Aug-17 Kirloskar Pneumatic Co. Ltd. 1 KIRLOSKAR PNEUMATIC CO. LIMITED A Kirloskar Group Company Outline 30-Aug-17 Kirloskar Pneumatic Co. Ltd. 2 Company Profile Specific Energy Consumption & Benchmarking ENCON Projects Summary Innovation in ENCON Projects Carbon Footprints Reduction Projects Utilization of Waste Materials Environment Projects Renewable Energy Initiatives Green Initiative ENCON Management Structure Energy Monitoring & Reporting Employee Engagement in ENCON & CSR Recognition for ENCON Efforts Future ENCON Projects Rakesh A Parmar Corporate Energy Manager Parag D Bhusari Manager HT Shop Presentation Team 30-Aug-17 Kirloskar Pneumatic Co. Ltd. 3 Company Profile Manufacturing Plant 30-Aug-17 Kirloskar Pneumatic Co. Ltd. 4

05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... · D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

  • Upload
    hakhanh

  • View
    215

  • Download
    2

Embed Size (px)

Citation preview

Page 1: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

1

18th National Award for Excellence in Energy Management 2017

Hadapsar, Pune

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 1

KIRLOSKAR PNEUMATIC CO. LIMITEDA Kirloskar Group Company

Outline

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 2

Company Profile

Specific Energy Consumption & Benchmarking

ENCON Projects Summary

Innovation in ENCON Projects

Carbon Footprints Reduction Projects

Utilization of Waste Materials

Environment Projects

Renewable Energy Initiatives

Green Initiative

ENCON Management Structure

Energy Monitoring & Reporting

Employee Engagement in ENCON & CSR

Recognition for ENCON Efforts

Future ENCON Projects

Rakesh A ParmarCorporate Energy

Manager

Parag D BhusariManager HT Shop

Presentation Team

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 3

Company Profile

Manufacturing Plant

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 4

Page 2: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

2

Products & Application

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 5

Air Compressor Division CentrifugalReciprocatingRotary ScrewOil Free Screw

Transmission Division Locomotive TransmissionIndustrial Gear BoxesHydraulic Marine

Traction Gears and Pinions

Products & Application

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 6

ACR Equipments & VACRefrigeration CompressorsRECIP Bare / Packages

Screw PackagesKirloskar - Ebara Vapor Absorption Chillers

PGS & ProjectsMarine HVACR Systems / Solutions Refrigeration Systems Gas Compression

Packages

Integrated Manufacturing Operations

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 7

Design & Manufacturing of High Quality products

Project Design, Fabrication, Packaging & Testing Facility

Ability To Manufacture Wide Product Range

Integrated Manufacturing Operations

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 8

P

D

C

A

MenMachineMethodMaterialSOPResources

Input Output

Process

CUSTOMER

QA PE ME HR PPC R&E Mktg.

Management

Mission Vision

Mission Vision

ValuesValues

LRP / AOPLRP / AOP

Strategy / PolicyStrategy / Policy

SHEQPC

HD

Competition Environment Society

I.T. Support

Waste EliminationWaste Elimination

•Waste Elimination Approach

Workplace PracticesWorkplace Practices

•Best Practices

Standard PracticesStandard Practices

•Standardized Work

Continual ImprovementContinual Improvement

•Kaizen, VSM• Problem Solving

Page 3: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

3

KPCL Mission, Vision & Values

30-Aug-17 9Kirloskar Pneumatic Co. Ltd.30-Aug-17 10

ISO 9001-2008

Company certification:

OHSAS 18001-2007ISO 14001-2004

Kirloskar Pneumatic Co. Ltd

Kirloskar Pneumatic Co. Ltd.

30-Aug-17 11

Company certification:

KPCL is Certified to Integrated Management System (IMS) by TUV

NORD

IMS isIntegration of

ISO 9001-2008, ISO 14001-2004 &

OHSAS 18001-2007

Kirloskar Pneumatic Co. Ltd.

Energy Policy

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 12

Managing Director Shri. Aditya Kowshiksigned Energy Policy – indicates strongcommitment from top managementtowards ENCON

Policy reviewed 4 times from firstpublished in 2005 in view of energyperformance scenario

KPI Strategy Deployment

Plant Level Goals

Dept. Level Goals

ENCON Key Projects Individual Goals

Page 4: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

4

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 13

SEC & Benchmarking

Specific Energy Consumption

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 14

Air Compressor Division

Increase in R&E TestingTrials, Testing & Customer InspectionSubstantial Increase in Third Party Inspection

0

1000

2000

3000

4000

14-15 15-16 16-17 17-18Actual 2915 2828 3128Target 2700 2700 2700 2700

kWh / No. of UnitsBetter

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 15

Specific Energy ConsumptionTransmission Division

Increase in R&E TestingDifferent product mix - High Speed & IGB Addition of New Machines

010002000300040005000

14-15 15-16 16-17 17-18Actual 4287 4294 4293Target 4080 4080 4080 4080

kWh / MT Better

Specific Energy Consumption

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 16

Foundry

Better

0

200

400

600

800

14-15 15-16 16-17 17-18Actual 635 628 640Target 638 630 620 620

kWh / MT

Increase in new design productsFrequent power failure from MSEDCL leads to molten metal holding

Page 5: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

5

Specific Energy Consumption

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 17

16-17 17-18Actual 42 31Target 40

01020304050

Shot Blast ing M/ckWh / MT

16-17 17-18Actual 1050 1087Target 998

950

1000

1050

1100

Ferrous ShopkWh / MT

16-17 17-18Actual 2763 3347Target 2625

01000200030004000

Non-Ferrous ShopkWh / MT

16-17 17-18Actual 71 85Target 67

020406080

100

Air Compressor - FoundrykWh / MT

16-17 17-18Actual 1.36 1.28Target 1.32

1.241.261.281.301.321.341.361.38

ACD OperationsLac kWh / Year New target developed in

year 2016-17

Focus on process benchmarking

Benchmarking For Foundry Operation

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 18

0

320

640

KPCL Foundry Target NationalBenchmark

InternationalBenchmark

630 620 610 560kWh / MT

Source for National & International Benchmark: UNIDO Global Benchmarking Tool 2010

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 19

Energy Projects Summary

ENCON Summary – 2014 to 2017

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 20

ENCON Projects Summary

Energy Saving: 1.03 Million

kWh

Cost Saving: Rs. 14.65 Mn

Investment: Rs. 9.59 Mn

Payback Period:

8 Months

Investment No. of Projects

Energy Saving in Million kWh

Cost Saving in Rs. Mn

Investment in Rs. Mn

Zero Fund 33 0.66 5.41 0.00Low Fund 16 0.27 2.42 0.52High Fund 14 0.10 6.82 9.07

Page 6: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

6

Zero Fund Projects

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 21

33 Projects

5 Programs

5.41 Rs. Mn

Immediate

0.66 kWh Mn

Low Fund ProjectsInvestment < 2.0 Lac

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 22

16 Projects

5 Programs

2.42 Rs. Mn

2.6 Months

0.27 kWh Mn

High Fund ProjectsInvestment > 2.0 Lac

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 23

14 Projects

5 Programs

6.82 Rs. Mn

16.0 Months

0.10 kWh Mn

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 24

Innovation in ENCON Projects

Page 7: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

7

Fixture modification for heat treatment process

Net weight loading - 78%Net weight loading - 40%

Energy Saving

• 166650 kWh

Cost Saving

• 14.53 Rs. Lac

Investment

• 0.20 Rs. Lac

Payback

• Immediate

Productivity ImprovedCarbon Emission Reduction 137 MT / Annum

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 25

Innovation In ENCON

Job loading in 2 layer Capacity utilization

improved Energy consumption

reduced up to 0.85 kWh / kg

3Ton furnace capacityEnergy loss due to low capacity utilizationComplex fixtureEnergy Consumption 1.4 kWh/kg

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 26

Carbon Foot Print Reduction Projects

50 % Energy Conservation AchievedCarbon Emission Reduction 24 MT / Annum

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 27

Energy Efficient Lighting Energy Efficient LED Lighting For • Office – 72 Watt Replaced By 36 Watt• Conference Hall – 36 Watt Replaced By 15 Watt.

Energy Efficient LED Lighting For• Shop Lighting• 250 Watt MH Lamp Replaced By 150 watt

Energy Efficient LED Lighting For• Street Lighting• 125 Watt MV Replaced By 40 Watt

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 28

Utilization of Waste

Page 8: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

8

Utilization Of Waste

Aluminum Burr Recycling

7 MT / year aluminum recycled

AfterBefore

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 29

Oil recovery from metal chips generated during gear cutting

73 % oil recovered from metal chips generated during gear cuttingNatural resources conservation

34 kL

9 kL

25 kL

Purchased

Recycled

Requirement

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 30

Utilization Of Waste

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 31

Reduction Of Energy Wastage By Improving Machine Availability (Maintenance Performance)

Air Compressor Division – Critical Machine Performance

Transmission Division – Critical Machine Performance

0

500

14-15 15-16 16-17 17-18

MTBF

Actual Target

0

10

14-15 15-16 16-17 17-18

MTTR

Actual Target

0

500

14-15 15-16 16-17 17-18

MTBF

Actual Target

0

10

14-15 15-16 16-17 17-18

MTTR

Actual Target

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 32

Environment Projects

Page 9: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

9

Environment ProjectWater Conservation By using dry type paint booth

BeforeBefore AfterAfter

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 33

Wet paint boothEnvironment concerns i.e. water pollutionEnergy consumption – 91823 kWh/yearWater Consumption – 142 Kl / Year

Dry type paint boothNo Water pollutionEnergy consumption – 60262 kWh / year

30-Aug-17 34

Dry type Paint Booth

Kirloskar Pneumatic Co. Ltd., Pune

30-Aug-17 35

Dry type Paint Booth

Kirloskar Pneumatic Co. Ltd., Pune 30-Aug-17 Kirloskar Pneumatic Co. Ltd. 36

Renewable Energy Initiatives

Page 10: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

10

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 37

Solar Power Plant

Connected load : Fan, lights, refrigerator of OHC and Society office

Energy Saving 1057 kWh/year

91 9077

6186 75

11079

21

114130 122

0 0

38

8860 69

44 32

116

15 1538

0

50

100

150

Solar MSEDCL

Cost Saving Rs. 9216/year

GHG Emission 0.87 Tons of CO2/Year

Renewable – Solar Energy

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 38

20kWp SPP

(On Grid Type)

Projection of 18 MWh

/ year

HR & Canteen building will get benefit

Target completion

in 2017

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 39

Green Initiative

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 40

Green belt @ KPCL Hadapsar plant

Page 11: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

11

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 41

Energy Management

ENCON Management Structure

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 42

Apex Team

Managing Director

VP – ACD

VP TRM

VP - ACR

Core Team

Energy Manager

All Dept. Heads

Working Team

Team Members• Prod.• PE• ME• HR• Finance• Assly.• Purchase• QA

Small Team

Cross Functional Team• Prod. • PE• ME• HR• Finance• Assly.• Purch.• QA

ENCON Team – 78 Nos.

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 43

Energy Management – Team Members

Employee Name Certificate holds

U V Marathe Energy Auditor

A M Bhide Energy Auditor

S P Bhargave Energy Auditor

R A Parmar Energy Manager

S D Jere Energy Manager

Mahesh M. Shinde Energy Manager

ENCON Methodology

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 44

• Assignment to Team• Energy Budget• Monitoring• Kaizen• Creative Ideas• Special Team for Project

• Monthly Review• Holding Gains• Fine Tuning & Plan for

further Improvement

• Brain Storming• Sub Project• Area of Concern• New Technology• Renewable Energy• Internal / External Energy

Audit

• Analysis of Energy Consumption

• Target Setting for Goal Achievement

Result Approach

DeploymentAnalysis & Review

Page 12: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

12

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 45

Energy Monitoring & Reporting

Monitoring & Reporting

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 46

DG Set Running Monitoring -Monthly monitoring - Record Book

kWh /kVAr Power Factor Main Plant Recording Monitoring-Daily - Data Register in Computer- SCADA system for H.T. furnaces only

Cell wise kWh Energy Recording & Review- Monthly

Compressor Energy Monitoring -Daily -Monthly -Data Register & in Computer

Foundry Energy Monitoring -Daily-Monthly-Recording in Computer

Monitoring Energy

Consumption

Monitoring & Reporting

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 47

Monitoring & Reporting

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 48

Page 13: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

13

Monitoring & Reporting

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 49

Energy Monitoring System @ Test beds

30-Aug-17 50Kirloskar Pneumatic Co. Ltd., Pune

SCADA System - Heat Treatment

SCADA System for Heat Treatment Process Control

Programming For Individual Furnaces Real Trend Charts for Temp. & Cp

30-Aug-17 51Kirloskar Pneumatic Co. Ltd., Pune

Monitoring & Measuring Instruments

30-Aug-17 52Kirloskar Pneumatic Co. Ltd., Pune

Energy Management

System is planned in

year 2017-18

Page 14: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

14

Sustainability Report (Internally Published)

Sustainability Reporting

Gap Analysis

Process Improvements

Integration Into Existing

Processes

Responsible Business

ProcessesSUSTAINABILITY

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 53

GHG Emission – Tons of CO2e

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 54

0

5000

10000

14-15 15-16 16-17

7220 7409 7045

KPCL

% Reduction

• 2.40% over FY15 (KPCL)• 1.60% over FY15

(Hadapsar)

0

5000

10000

14-15 15-16 16-17

6105 6414 6005

Hadapsar

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 55

Employee Engagement In ENCON & CSR

Global Warming

GHG Emission

E-Waste Recycling

Compressed Air leakage

GreenCo Certification

En MS ISO 50001

Training @ Office & shop floor area

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 56

Employee Engagement In ENCON

Training On

Page 15: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

15

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 57

Training to EmployeesS. N. Programme Title Nos.

Level of TrainingDurationin Hours

DateEngineers /

WorkersSupervisor /

Managers1 Plastic recycling awareness 43 11 32 1.0 Jun.-16

2 Why Energy Conservation Required? 355 162 193 4.0 Sep-16

Total 398 173 225

S. N. Programme Title Nos.Level of Training

Durationin Days

DateEngineers / Workers

Supervisor / Managers

1Workshop on Solar Photo-voltaic and Hybrid Wind Energy Systems 2 -- 2 1 Day Sep-16

2Challenges in implementation of open access in Maharashtra 1 - 1 1 Day Oct-16

3 Workshop on enhanced energy efficiency in industrial lubricants 3 1 2 1 Day Nov-16

4 CII Green Conclave 2016 1 - 1 1 Day Nov-16

Total 7 1 6

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 58

Employee Engagement In ENCON

ENCON Quiz

Swachhata Abhiyan

ENCON Week Celebration

World Environment Day

KVIFF

SR Report

Vendor Engagement

Performance Appraisal

ENCON Painting Competition

Susamwad In-house Magazine

ENCON Week Celebration Glimpses

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 59

Desktop Wallpaper ENCON Oath

Opening Ceremony ENCON Quiz awardSolar Lantern

Banner

World Environment Day

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 60

Bike Pooling/ Cycling

Walking

CAR PoolingAwareness on Plastic

recycling

LED bulb / Sapling distribution

Page 16: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

16

61Kirloskar Pneumatic Co. Ltd., Pune30-Aug-17

ENCON Awareness in Community

30-Aug-17 Kirloskar Pneumatic Co. Ltd. 62

Recognition For ENCON Efforts

Appreciation @ CII

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 63

2007-08Energy Efficient Unit

2008-09Best

ENCON projects & Energy Efficient Unit

2009-10 Energy Efficient Unit

2010-11 Energy Efficient Unit

2014-15 Energy Efficient Unit

Appreciation @ Kirloskar Group ENCON Committee

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 64

2008-09 3rd Prize

2009-10Best Innovative project

2011-12 2nd Prize

2012-13 Best Innovative Project

2014-15 3rd Prize

Page 17: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

17

BEE’s National Energy Conservation Award 2015

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 65

CII’s National Energy Management Award 2015

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 66

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 67

MEDA Energy Management Award 2015 Kirloskar Group ENCON Award 2015-16

68

3rd Best managed energy efficient unit – Large plant category

Page 18: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

18

Kirloskar Group ENCON Award 2015-16

69

Best ENCON Project – Induction furnace utilization at Foundry

Kirloskar Group ENCON Award 2016-17

70

3rd Best managed energy efficient unit – Large plant category

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 71

Recognition For ENCON Efforts

Accolades Gallery

Future ENCON Projects

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 72

Sr. No.

Project Driver

1 Use of LED lights for office/Shop floor / Street lights Energy Efficiency

2 Off Grid Solar Power plant installation for Security Office, HR, Canteen Green Energy

3 Replacement of refractory & brick lining of Heat Treatment furnace for energy performance improvement

ENCON

4 Use of solar energy for KPCL operation under open Access mechanism GreenEnergy

5 Replacement of old 500 kVA transformers - 2 Nos. with energy efficient transformer

ENCON

6 Active harmonic filter to control the harmonic level in electrical distribution system of air compressor test bed

ENCON

Page 19: 05 Kirlosker Pneumatic - greenbusinesscentre.comgreenbusinesscentre.com/energyaward2017presentations/Auto Engg/05... ·  D ] ] } v U s ] ] } v s o µ ï ì r µ P r í ó

8/30/2017

19

30-Aug-17 Kirloskar Pneumatic Co. Ltd., Pune 73

Sr. No.

Project Driver

7 Introduction of SCADA based energy monitoring system at Hadapsar & Saswad plant

ENCON

8 Use of VRF based air conditioning system for the building air conditioning requirement

ENCON

9 Energy generation by using compressed air generated during testing ENCON

10 Inverter based air conditioners for new requirement ENCON

Future ENCON Projects

www.kirloskarkpcl.com

KIRLOSKAR PNEUMATIC CO. LIMITEDA Kirloskar Group Company