42
1 © Nokia Siemens Networks Flexi EDGE BTS Commissioning & Integration / FAs / 24.09.2007 For internal use Flexi EDGE BTS Commissioning & Integration

05 Flexi EDGE BTS Commissioning & Integration

Embed Size (px)

Citation preview

Page 1: 05 Flexi EDGE BTS Commissioning & Integration

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 2

4.09

.200

7Fo

r int

erna

l use

Flex

i ED

GE

BTS

Com

mis

sion

ing

& In

tegr

atio

n

Page 2: 05 Flexi EDGE BTS Commissioning & Integration

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Lega

l not

ice

Inte

llect

ual P

rope

rty

Rig

hts

All

copy

right

s an

d in

telle

ctua

l pro

perty

righ

ts fo

r Nok

ia tr

aini

ng d

ocum

enta

tion,

pr

oduc

t doc

umen

tatio

n an

d sl

ide

pres

enta

tion

mat

eria

l, al

l of w

hich

are

fo

rthw

ith k

now

n as

Nok

ia tr

aini

ng m

ater

ial,

are

the

excl

usiv

e pr

oper

ty o

f Nok

ia.

Nok

ia o

wns

the

right

s to

cop

ying

, mod

ifica

tion,

tran

slat

ion,

ada

ptat

ion

or

deriv

ativ

es in

clud

ing

any

impr

ovem

ents

or d

evel

opm

ents

. Nok

ia h

as th

e so

le

right

to c

opy,

dis

tribu

te, a

men

d, m

odify

, dev

elop

, lic

ense

, sub

licen

se, s

ell,

trans

fer a

nd a

ssig

n th

e N

okia

trai

ning

mat

eria

l. In

divi

dual

s ca

nus

e th

e N

okia

tra

inin

g m

ater

ial f

or th

eir o

wn

pers

onal

sel

f-dev

elop

men

t onl

y, th

ose

sam

e in

divi

dual

s ca

nnot

sub

sequ

ently

pas

s on

that

sam

e In

telle

ctua

l Pro

perty

to

othe

rs w

ithou

t the

prio

r writ

ten

agre

emen

t of N

okia

. The

Nok

ia tr

aini

ng m

ater

ial

cann

ot b

e us

ed o

utsi

de o

f an

agre

ed N

okia

trai

ning

ses

sion

for d

evel

opm

ent o

f gr

oups

with

out t

he p

rior w

ritte

n ag

reem

ent o

f Nok

ia.

Page 3: 05 Flexi EDGE BTS Commissioning & Integration

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Obj

ectiv

es

At t

he e

nd o

f thi

s m

odul

e th

e pa

rtici

pant

will

be

able

to:

•S

ucce

ssfu

lly c

omm

issi

on &

inte

grat

e th

e Fl

exi E

DG

E B

TS

Page 4: 05 Flexi EDGE BTS Commissioning & Integration

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Com

mis

sion

ing

Prer

equi

site

s 1/

2

•B

efor

e co

mm

issi

onin

g, th

e ph

ysic

al in

stal

latio

n of

the

BTS

(m

odul

es, c

ablin

g, a

nten

nas

and

radi

os) m

ust b

e co

mpl

ete.

•M

ake

sure

you

hav

e a

PC

with

Nok

ia F

lexi

ED

GE

BTS

Man

ager

in

stal

led.

•M

ake

sure

you

hav

e a

10/1

00 M

bit/s

Eth

erne

t cab

le a

vaila

ble

for

the

conn

ectio

n be

twee

n th

e B

TS a

nd y

our P

C.

•Y

ou n

eed

to h

ave

the

para

met

er v

alue

s av

aila

ble

that

nee

d to

be

ente

red

durin

g co

mm

issi

onin

g. T

he p

aram

eter

val

ues

are

prov

ided

by

the

netw

ork

plan

ning

pro

cess

.•

BS

C s

ettin

gs: t

he B

TS s

ite m

ust a

lread

y be

cre

ated

at t

he B

SC

for

com

mis

sion

ing

to b

e su

cces

sful

ly c

ompl

eted

.

Page 5: 05 Flexi EDGE BTS Commissioning & Integration

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Com

mis

sion

ing

Prer

equi

site

s 2/

2

•Tr

ansm

issi

on n

etw

ork

setu

p: th

e tra

nsm

issi

on li

nk(s

) bet

wee

n th

e B

SC

and

the

BTS

mus

t alre

ady

be s

et u

p so

that

ther

e is

a

trans

mis

sion

pat

h fro

m th

e B

SC

to th

e B

TS fo

r all

the

Abi

s ch

anne

ls.

•If

ther

e ar

e an

y in

term

edia

te tr

ansm

issi

on h

ubs

betw

een

the

BS

C

and

the

BTS

, the

cro

ss c

onne

ctio

ns in

the

hubs

sho

uld

eith

er b

e se

t up

at th

e E

1/T1

link

leve

l, or

at t

he n

x 6

4 kb

it/s

leve

l for

all

the

chan

nels

to th

e B

TS in

an

E1/

T1 li

nk.

•W

ith th

e Fl

exi t

rans

mis

sion

inte

rface

Fle

xbus

sub

-mod

ule

(FIF

A),

the

trans

mis

sion

link

will

be

esta

blis

hed

durin

g co

mm

issi

onin

g.

Page 6: 05 Flexi EDGE BTS Commissioning & Integration

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

IP s

etup

of t

he lo

cal C

omm

issi

onin

g PC

If th

e Tr

ansm

issi

on u

nit t

ype

is F

IFA

, th

e IP

set

tings

of t

he P

C s

houl

d be

as

follo

ws:

IP a

ddre

ss:

192.

168.

255.

130

Sub

net M

ask:

255.

255.

255.

128

Def

ault

Gat

eway

: non

e

In a

ll ot

her c

ases

(IP s

etup

is li

ke fo

r WC

DM

A B

TS /

AX

C a

cces

s)

Page 7: 05 Flexi EDGE BTS Commissioning & Integration

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Loca

l Con

nect

ion

Page 8: 05 Flexi EDGE BTS Commissioning & Integration

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Und

o C

omm

issi

onin

g 1/

3

Page 9: 05 Flexi EDGE BTS Commissioning & Integration

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Und

o C

omm

issi

onin

g 2/

3

Page 10: 05 Flexi EDGE BTS Commissioning & Integration

10©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Und

o C

omm

issi

onin

g 3/

3

Page 11: 05 Flexi EDGE BTS Commissioning & Integration

11©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Com

mis

sion

ing

optio

ns

Page 12: 05 Flexi EDGE BTS Commissioning & Integration

12©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Site

Spe

cific

Info

rmat

ion

Page 13: 05 Flexi EDGE BTS Commissioning & Integration

13©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Har

dwar

e C

onfig

urat

ion

Page 14: 05 Flexi EDGE BTS Commissioning & Integration

14©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Cab

ling

Con

figur

atio

n 1/

4

Page 15: 05 Flexi EDGE BTS Commissioning & Integration

15©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Cab

ling

Con

figur

atio

n 2/

4

Num

ber

of T

RXs

TX Com

bini

ngR

Xdi

vers

ityN

umbe

r of D

ual

TRX

Mod

ules

(EXx

A)

Num

ber o

f Dua

l D

uple

xer

Mod

ules

(ER

xA)

Num

ber o

f W

ideb

and

Com

bine

r Sub

-M

odul

es(E

WxB

)

Num

ber

of Ant

enna

s

1 to

2By

-pas

s2U

D1

10

23

By-p

ass

2UD

22

03

4By

-pas

s2U

D2

20

41

to 2

2-w

ay1U

D (n

odi

vers

ity)

11

11

3 to

42-

way

2UD

21

22

3 to

44-

way

1UD

(no

dive

rsity

)2

13

1

5 to

84-

way

2UD

41

62

The

follo

win

g TR

X /

Sec

tor c

onfig

urat

ions

sup

port

RF-

CA

D (C

able

Aut

o D

etec

tion)

Page 16: 05 Flexi EDGE BTS Commissioning & Integration

16©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Cab

ling

Con

figur

atio

n 3/

4

HW

Con

fig.

TX Com

bini

ngR

Xdi

vers

ityN

umbe

r of

Dua

l TR

XM

odul

es(E

XxA

)

Num

ber o

fD

DU

Mod

ules

(ER

xA)

Num

ber o

fW

ideb

and

Com

bine

rSu

b-M

odul

es(E

WxB

)

Num

ber

of S

yste

m

Mod

ules

(E

SMA

)

Num

ber

of Ant

enna

s pe

r sec

tor

Num

ber

of

Ant

enna

s

1+1

By-

pass

1UD

(no

dive

rsity

)1

10

11

2

The

follo

win

g TR

X /

Sec

tor c

onfig

urat

ions

sup

port

RF-

CA

D (C

able

Aut

o D

etec

tion)

Page 17: 05 Flexi EDGE BTS Commissioning & Integration

17©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Cab

ling

Con

figur

atio

n 4/

4

Page 18: 05 Flexi EDGE BTS Commissioning & Integration

18©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Ant

enna

Set

tings

1/3

Page 19: 05 Flexi EDGE BTS Commissioning & Integration

19©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Ant

enna

Set

tings

2/3

Page 20: 05 Flexi EDGE BTS Commissioning & Integration

20©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Ant

enna

Set

tings

3/3

Page 21: 05 Flexi EDGE BTS Commissioning & Integration

21©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Bat

tery

Bac

kup

Uni

t

Page 22: 05 Flexi EDGE BTS Commissioning & Integration

22©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Oth

er P

assi

ve U

nits

Page 23: 05 Flexi EDGE BTS Commissioning & Integration

23©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Tran

smis

sion

Par

amet

ers

Page 24: 05 Flexi EDGE BTS Commissioning & Integration

24©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Line

inte

rfac

e se

tting

s

Page 25: 05 Flexi EDGE BTS Commissioning & Integration

25©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Sync

hron

izat

ion

Page 26: 05 Flexi EDGE BTS Commissioning & Integration

26©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Abi

s A

lloca

tion

1/2

Page 27: 05 Flexi EDGE BTS Commissioning & Integration

27©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Abi

s A

lloca

tion

2/2

Page 28: 05 Flexi EDGE BTS Commissioning & Integration

28©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Abi

s Pr

otec

tion

Page 29: 05 Flexi EDGE BTS Commissioning & Integration

29©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Cro

ss C

onne

ctio

ns 1/

2

Page 30: 05 Flexi EDGE BTS Commissioning & Integration

30©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Cro

ss C

onne

ctio

ns 2/

2

Page 31: 05 Flexi EDGE BTS Commissioning & Integration

31©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Q1

Man

agem

ent

Page 32: 05 Flexi EDGE BTS Commissioning & Integration

32©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Flex

iHub

Man

ager

Page 33: 05 Flexi EDGE BTS Commissioning & Integration

33©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Site

Com

mis

sion

ing

File

Page 34: 05 Flexi EDGE BTS Commissioning & Integration

34©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

SCF

Save

Dia

log

Page 35: 05 Flexi EDGE BTS Commissioning & Integration

35©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Com

mis

sion

ing

Prog

ress

Page 36: 05 Flexi EDGE BTS Commissioning & Integration

36©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

BTS

has

bee

n su

cces

sful

ly c

omm

issi

oned

Page 37: 05 Flexi EDGE BTS Commissioning & Integration

37©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Ope

ratio

nal F

unct

iona

lity

The

Flex

i ED

GE

BTS

can

be

seen

as

oper

atio

nal,

if:•

Abi

s in

terfa

ce is

con

nect

ed•

Ope

ratio

nal s

tate

is W

orki

ng (s

een

from

the

BS

C a

s W

O)

•Lo

cal (

BTS

Man

ager

) ind

icat

ions

are

:–

O&

M L

ink

Esta

blis

hed

–B

CF

oper

atio

nal s

tate

: Sup

ervi

sory

–al

l TR

Xs

oper

atio

nal s

tate

s: S

uper

viso

ry•

Abi

s Lo

op T

ests

hav

e ru

n su

cces

sful

ly•

TRX

Test

sha

ve ru

n su

cces

sful

ly•

Test

cal

ls a

re s

ucce

ssfu

l•

The

BTS

is fr

ee o

f une

xpec

ted

alar

ms

•R

emot

e M

anag

emen

t (B

SC

/ N

etA

ct) i

s w

orki

ng.

Page 38: 05 Flexi EDGE BTS Commissioning & Integration

38©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Che

ck o

pera

tiona

l sta

te: B

CF

Page 39: 05 Flexi EDGE BTS Commissioning & Integration

39©

Nok

ia S

iem

ens

Net

wor

ksFl

exi E

DG

E B

TS C

omm

issi

onin

g &

Inte

grat

ion

/ FA

s / 0

8.10

.200

7

Che

ck o

pera

tiona

l sta

te: T

RX

Page 40: 05 Flexi EDGE BTS Commissioning & Integration
Page 41: 05 Flexi EDGE BTS Commissioning & Integration
Page 42: 05 Flexi EDGE BTS Commissioning & Integration