    SAWS Job. No.: 04-3501Hart Avenue Sanitary Sewer Structure Reconstruction

    BID PROPOSAL

    PROPOSAL OF , corporation a

    partnership consisting of

    an individual doing business as

    TO THE SAN ANTONIO WATER SYSTEM:

    Pursuant to Instructions and Invitation to Bidders, the undersigned proposes to furnish all labor and materials as specifiedand perform the work required for the construction of pipelines and appurtenances, San Antonio Water System Job No.04-3501, in accordance with the Plans and Specifications for the following prices to wit:

    Item Description & Estimated Quantities Unit Price Total PriceNo. (Unit Price to be Written in Words) (Figures) (Figures)

    100 1 LS - Mobilization (1) Lump Sum

    Dollars

    Cents $ XXXXXXXX $

    101 1 LS - Preparing Right-of-Way (1) Lump Sum

    Dollars

    Cents $ XXXXXXXX $

    (1)MOBILIZATION LUMP SUM BID SHALL BE LIMITED TO A MAXIMUM 10% OF THE TOTAL BASE BID AMOUNT.PREPARING RIGHT-OF-WAY LUMP SUM BID SHALL BE LIMITED TO A MAXIMUM OF 4% OF THE TOTAL BASE BID

    AMOUNT. THE COMBINED TOTAL BIDS FOR ITEM 100, MOBILIZATION AND ITEM 101, PREPARING RIGHT-OF-WAY SHALL NOT EXCEED FOURTEEN PERCENT (14%) OF THE TOTAL BASE BID AMOUNT. A BASE BID SHALLBE DEFINED AS ALL BID ITEMS EXCLUDING ITEM 100, MOBILIZATION AND ITEM 101, PREPARING RIGHT-OF-WAY. A BID CONTAINING A COMBINED TOTAL FOR THE ABOVE MENTIONED PAY ITEMS IN EXCESS OFFOURTEEN PERCENT (14%) SHALL BE CONSIDERED UNBALANCED AND SHALL BE REJECTED.

    P-1a

  • 7/29/2019 04_3501_proposal

    2/12

    SAWS Job. No.: 04-3501Hart Avenue Sanitary Sewer Structure Reconstruction

    Item Description & Estimated Quantities Unit Price Total Price

    No. (Unit Price to be Written in Words) (Figures) (Figures)

    103.1 92 LF - Remove Concrete Curbper Linear Foot

    Dollars

    Cents $ $

    103.2 1128 SF -Remove Concrete Sidewalks & Drivewaysper Square Foot

    Dollars

    Cents $ $

    107(COSA) 226 CY - Embankment

    per Cubic Yard

    Dollars

    Cents $ $

    203 66 GAL Tack Coatper Gallon

    Dollars

    Cents $ $

    205.3 657 SY Hot Mix Asphalt Pavement(1 Compacted Depth) per Square Yard

    Dollars

    Cents $ $

    206 657 SY Asphalt Treated Base(6 Compacted Depth) per Square Yard

    Dollars

    Cents $ $P-2a

  • 7/29/2019 04_3501_proposal

    3/12

    SAWS Job. No.: 04-3501Hart Avenue Sanitary Sewer Structure Reconstruction

    Item Description & Estimated Quantities Unit Price Total PriceNo. (Unit Price to be Written in Words) (Figures) (Figures)

    496(TxDOT) 4 LS Remove Existing Structures

    Lump Sum

    Dollars

    Cents $ $

    501 114 LF Machine Laid Curbper Linear Foot

    Dollars

    Cents $ $

    502.1 67 SY Concrete Sidewalksper Square Yard

    Dollars

    Cents $ $

    502.2 18 SY Concrete Drivewaysper Square Yard

    Dollars

    Cents $ $

    502.3 20 SY Commercial Drivewaysper Square Yard

    Dollars

    Cents $ $

    505 37 SY Concrete Riprap (5 Thick)per Square Yard

    Dollars

    Cents $ XXXXXXXX $

    P-3a

  • 7/29/2019 04_3501_proposal

    4/12

    SAWS Job. No.: 04-3501Hart Avenue Sanitary Sewer Structure Reconstruction

    Item Unit Price Total PriceNo. (Unit Price to be Written in Words) (Figures)

    507.2 80 LF Chain Link Wire Fence with 3 Strands of BarbWire (6 High) per Linear Foot

    Dollars

    Cents $ $

    507.5 1 Chain Link Wire Vehicular Gate with 3 Strands of BarbWire (6 High) OPENING

    Dollars

    Cents $ $

    508(TxDOT) 1 EA Temporary Ramp

    per Each

    Dollars

    Cents $ $

    511.3 22 SY Cutting and Replacing Pavements(1 HMAC D, 6 ATB) per Square Foot

    Dollars

    Cents $ $

    515 4 CY - Topsoilper Cubic Yard

    Dollars

    Cents $ $

    516.1 177 SY Bermuda Soddingper Square Yard

    Dollars

    Cents $ $

    Description & Estimated Quantities(Figures)

    P-4a

  • 7/29/2019 04_3501_proposal

    5/12

    SAWS Job. No.: 04-3501Hart Avenue Sanitary Sewer Structure Reconstruction

    Item Description & Estimated Quantities Unit Price Total PriceNo. (Unit Price to be Written in Words) (Figures) (Figures)

    516.2 177 SY St. Augustine Soddingper Square Yard

    Dollars

    Cents $ $

    530 1 LS Barricades, Signs & Traffic HandlingLump Sum

    Dollars

    Cents $ $

    540 1 LS Storm Water Pollution PreventionPlan (SW3P) Lump Sum

    Dollars

    Cents $ $

    550 237 LF Trench Excavation SafetyProtection per Linear Foot

    Dollars

    Cents $ $

    814 45 LF 6 PVC Pipe, Restrained Jointper Linear Foot

    Dollars

    Cents $ $

    824 1 EA - Relay 2" Long Serviceper Each

    Dollars

    Cents $ $

    P-5a

  • 7/29/2019 04_3501_proposal

    6/12

    SAWS Job. No.: 04-3501Hart Avenue Sanitary Sewer Structure Reconstruction

    Item Description & Estimated Quantities Unit Price Total PriceNo. (Unit Price to be Written in Words) (Figures) (Figures)

    824 3 EA New Long Serviceper Each

    Dollars

    Cents $ $

    833 1 EA Existing Meter and Meter Box Relocationper Each

    Dollars

    Cents $ $

    836 1 TON Pipe Fittings, all sizes and typesper TON

    Dollars

    Cents $ $

    840 4 EA 6 Water tie-insper Each

    Dollars

    Cents $ $

    841 2 EA Hydrostatic Testingper Each

    Dollars

    Cents $ $

    844 4 EA 2 Blowoff, Temporaryper Each

    Dollars

    Cents $ $

    P-6a

  • 7/29/2019 04_3501_proposal

    7/12

    SAWS Job. No.: 04-3501Hart Avenue Sanitary Sewer Structure Reconstruction

    Item Description & Estimated Quantities Unit Price Total PriceNo. (Unit Price to be Written in Words) (Figures) (Figures)

    848 59 LF 8 PVC Gravity Sanitary Sewer Line (All Depths)per Linear Foot

    Dollars

    Cents $ $

    848 25 LF 42 FRP (All Depths)per Linear Foot

    Dollars

    Cents $ $

    848 153 LF 66 FRP (All Depths)per Linear Foot

    Dollars

    Cents $ $

    850 1 EA Sanitary Sewer Structures (Structure No. 1)per Each

    Dollars

    Cents $ $

    850 1 EA Sanitary Sewer Structures (Structure No. 2A)per Each

    Dollars

    Cents $ $

    850 1 EA Sanitary Sewer Structures (Structure No. 2AExisting) per Each

    Dollars

    Cents $ $

    P-7a

  • 7/29/2019 04_3501_proposal

    8/12

    SAWS Job. No.: 04-3501Hart Avenue Sanitary Sewer Structure Reconstruction

    Item Description & Estimated Quantities Unit Price Total PriceNo. (Unit Price to be Written in Words) (Figures) (Figures)

    850 1 EA Sanitary Sewer Structures (Structure No. 2B)per Each

    Dollars

    Cents $ $

    850 1 EA Sanitary Sewer Structures (Structure No. 2C)per Each

    Dollars

    Cents $ $

    850 1 EA Sanitary Sewer Structures (Structure No. 3)per Each

    Dollars

    Cents $ $

    852.1 1 EA Sanitary Sewer Manhole (0 6)per Each

    Dollars

    Cents $ $

    854 163 LF Sanitary Sewer Lateralsper Linear Foot

    Dollars

    Cents $ $

    854A 6 EA One Way Sanitary Sewer Cleanoutper Each

    Dollars

    Cents $ $

    P-8a

  • 7/29/2019 04_3501_proposal

    9/12

    SAWS Job. No.: 04-3501Hart Avenue Sanitary Sewer Structure Reconstruction

    Item Description & Estimated Quantities Unit Price Total PriceNo. (Unit Price to be Written in Words) (Figures) (Figures)

    858 4 CY Concrete Encasement, Cradles, Saddles andCollars per Cubic Yard

    Dollars

    Cents $ $

    862 15 LF Abandonment of Sanitary Sewer Line (66)per Linear Foot

    Dollars

    Cents $ $

    862 32 LF Abandonment of Sanitary Sewer Line (42)per Linear Foot

    Dollars

    Cents $ $

    864 1 LS Bypass PumpingLump Sum

    Dollars

    Cents $ $

    910 4053 SF Protective Coatingper Square Foot

    Dollars

    Cents $ $

    1020 2 EA 6 Main Break/Leak Repairsper Each

    Dollars

    Cents $ $

    P-9a

  • 7/29/2019 04_3501_proposal

    10/12

    SAWS Job. No.: 04-3501Hart Avenue Sanitary Sewer Structure Reconstruction

    Item Description & Estimated Quantities Unit Price Total PriceNo. (Unit Price to be Written in Words) (Figures) (Figures)

    SP-1.1 22 EA Stop Plates (6 x 7)per Each

    Dollars

    Cents $ $

    SP-1.2 1 EA Stop Plates (8 x 7)per Each

    Dollars

    Cents $ $

    SP-2 1 LS Chemical Injection SystemLump Sum

    Dollars

    Cents $ $

    TOTAL BID AMOUNT $

    P-10a

  • 7/29/2019 04_3501_proposal

    11/12

    SAWS Job. No.: 04-3501Hart Avenue Sanitary Sewer Structure Reconstruction

    P-11a

    Bidder's Signature & Title

    Firm's Name (Type or Print)

    Firm's Address

    Firm's Phone No./Fax No.

    Date

    The Contractor herein acknowledges Addendum Nos.

    OWNER RESERVES THE RIGHT TO ACCEPT THE OVERALL MOST RESPONSIBLE BID.

    The bidder offers to construct the project in accordance with the Project Documents for the contract price, and to completethe Project within 240 calendar days after the start date, as set forth in the Authorization to Proceed. The Bidder understands and accepts the provisions of the contract Document relating to liquidation damages of the Project if notcompleted on time.

    Complete the additional requirements of the Proposal, which are included on the following pages.