Life cycle approach III: process optimization at existing facilities, increasing recovery while reducing opex - Carmen Copper Brownfield
Upgrade Project By Stuart Sneyd
Capital Markets Day 2014 December 2014
Outotec All rights reserved
Contents
Carmen Copper project Outotec scope of work Outotec strategy in action Example value creation: Copper recovery Example value creation: Power consumption Example value creation: Project delivery Technology partnership benefits
Dec 4 Outotec CMD 2014: Case Carmen Copper 2
Outotec All rights reserved
The challenge
Carmen Copper Corporation wished to upgrade capacity at their existing copper/gold concentrator originally built in the 1970s.
The upgrade had to be integrated into the existing operations and provide complete end to end technology solution for providing additional production capacity.
Project requirements: Experienced technology partner involved throughout all stages of a brownfield
upgrade project from conceptual flow sheet development, through to detailed engineering, construction and commissioning.
Project partner must have an integrated proprietary technology, process know-how, project delivery and plant operations capability.
Alibility to have a flexible partnership approach combining Carmen Coppers
intimate knowledge of their ore characteristics with a trusted, knowledgeable technology provider able to deliver a fast-tracked project execution timeline.
Dec 4 Outotec CMD 2014: Case Carmen Copper 3
Outotec All rights reserved
Project spotlight - Carmen Copper, Philippines Significant South East Asian project Brownfield upgrade EPS project Direct contract with client; no EPCM Successfully brought into operation Ongoing services Commenced discussions for next expansion
Dec 4 Outotec CMD 2014: Case Carmen Copper 4
Outotec All rights reserved
http://www.atlasmining.com.ph/projects/carmen-copper-corporation
Carmen Copper Brownfield Upgrade
Carmen Copper Corporation (CCC) is a wholly-owned subsidiary of Atlas Consolidated Mining and Development Corporation (Atlas).
CCC has an operating agreement with Atlas and it has exclusive operating rights over the in situ mineral resources and ore reserves of Carmen, Lutopan and Biga mineral deposits.
Dec 4 Outotec CMD 2014: Case Carmen Copper 5
Outotec All rights reserved
What was Outotec's scope
Stage 1: Ore throughput upgrade from 40,000 t/d to 60,000 t/d with new plant and equipment
Stage 2: Modernisation of the existing plant to achieve lower production costs improved health, safety and
environmental standards operational excellence thereby helping to maintain good
relationships with their local communities
Dec 4 Outotec CMD 2014: Case Carmen Copper 6
Outotec All rights reserved
Technology supplied all based on Outotec's proprietary equipment
Dec 4 Outotec CMD 2014: Case Carmen Copper 7
2 x 6MW Ball Mills c/w Trommels Flotation Circuit, incl. 4xTC300, 10xOK16
Blowers 39m Tailings Thickener c/w free standing tank
2 x 24m Concentrate Thickener retrofits Courier Analyzer, PSI, Sampling System and DCS
Proprietary equipment offering across all Minerals
Processing business lines
including Comminution,
De-watering and Flotation
Outotec All rights reserved
Technology supply
Flowsheet design
Preliminary engineering
study
Detailed engineering
Full detail drafting
Installation advisory services
Plant commissioning & optimisation
Life Cycle Services order
Scope of work for project extended beyond equipment delivery into life cycle services
Dec 4 Outotec CMD 2014: Case Carmen Copper 8
Value of post equipment delivery services approximately 2M and on growing
Outotec All rights reserved
Visual of scope of work
Dec 4 Outotec CMD 2014: Case Carmen Copper 9
Outotec All rights reserved
Visual of scope of work
Dec 4 Outotec CMD 2014: Case Carmen Copper 10
Outotec All rights reserved
A good example of Outotec strategy in action - leveraging technology leadership & geographical presence
Dec 4 Outotec CMD 2014: Case Carmen Copper 11
EMEA Americas APAC
Current minerals and metals
IWT Energy
Delivery
Systems integration
Service
Proprietary equipment
Technology
Larger share of customer capex and opex
Strengthening geographic presence
CORE: Process
technology leadership
Service
Proprietary equipment
Delivery
Systems integration
Technology
A life cycle solution partner for our
customers
More Opex
Larg
er s
cope
s
Outotec All rights reserved
Key steps in securing contract
Dec 4 Outotec CMD 2014: Case Carmen Copper 12
Initiated by Site Account Management identifying a significant upside opportunity to services business
Close cooperation between Solutions, Technology and Services staff to develop a customised solution offering Local partners In country partners Incorporation of customer supplied steel and labour
Supported by Outotecs Filipino agent
Outotec All rights reserved
How Outotec generates value for its clients - HG Cleaner Circuit example
Initially only Rougher (flotation)
circuit to be upgraded Early consultation with Client
identified a cleaner capacity constraint
Three options were investigated by Outotec
Preferred flowsheet investigated under laboratory conditions
Dec 4 Outotec CMD 2014: Case Carmen Copper 13
Outotec All rights reserved
0.00
5.00
10.0
15.0
20.0
25.0
50.0 55.0 60.0 65.0 70.0 75.0 80.0 85.0 90.0 95.0
Cu G
rade
(%)
Cu Recovery (%)
HG Cleaner Circuit
Early laboratory testwork indicated low Cu concentrate grades
Optical mineralogy conducted indicated presence of pyrite
Flotation conditions were therefore modified with finer P80 regrind with lime addition
Improved plant operating
results, new circuit configuration validated > fit for purpose circuit design
Dec 4 Outotec CMD 2014: Case Carmen Copper 14
Lab Results Product Recovery >80% Concentrate grade 24.5% Cu Plant Targets Product recovery > 80% Concentrate grade > 26.5% Cu
py
bn
cpy
CuS
cpy
cpy
cpy
pypy
Outotec All rights reserved
Primary benefits
The HG cleaner circuit design took production requirements into consideration. The technology partnership promoted a collaborative approach and ensured that during the project design and execution phases, maximum plant production was achieved. This has led to a cleaner circuit design that has been integrated into the float circuit with
minimal disruptions to plant production and plant availability.
The HG cleaner circuit design accommodates for both Lutopan and Carmen ore reserves. The technology partnership allowed for the project team to be involved in the upfront laboratory test work. The results were used to refine the equipment selection and circuit design. This will ensure
less circuit instability when the feed transitions completely from Lutopan to Carmen ore.
The HG cleaner circuit upgrade project was completed on schedule even though the project had a challenging timeline. This technology partnership allowed for Carmen Copper and Outotec to have a working
agreement which enabled the design and construction phases to be overlapped and shortened the transition through the various stages of project implementation.
Dec 4 Outotec CMD 2014: Case Carmen Copper 15
Outotec All rights reserved
Plant performance recovery increase
Dec 4 Outotec CMD 2014: Case Carmen Copper 16
Before TC300 + HG Cleaner circuit @ 40,000 t/d Cu recovery 83% (2%); Cu final grade 27% (1%) Initial TC300 + HG Cleaner circuit @ 60,000 t/d Cu recovery 85% (2%); Cu final grade 28% (1%) Current TC300 + HG Cleaner circuit @ 60,000 t/d Cu recovery 87% (2%); Cu final grade 27% (1%)
Plant results confirm flotation upgrade achieves production targets
Increase Cu recovery of 4% represents an increased value of recovered copper of approximately AUD 26 million p.a.
Outotec All rights reserved
Improved energy consumption example
Flotation Cells power consumption: Old Wemco cells = 1.4 kW / m3 flotation volume New Outotec Tank Cells = 0.7 kW / m3 flotation volume
Specific power reduction approximately 0.7 kW/m3 or -50%
compared to current installed base or cost saving between the two circuits is approximately AUD 1.5 million per year
Further opportunity to upgrade existing installed base to secure
further operational costs savings
Helping the clients to move production costs down the cost curve is one way Outotec delivers value
Dec 4 Outotec CMD 2014: Case Carmen Copper 17
Outotec All rights reserved
Partnerships benefits
Improvement in operational efficiency through access to the latest technologies
and experienced people
Reduction in costs offer competitive engineering rates, and
flexibility in the procurement process
Improvement in plant availability provide services contracts for spare parts
& shutdown services
Improvement in site competencies on site training and operational support
Improved project delivery fast track delivery with direct contracting
and single one stop shop capability
Dec 4 Outotec CMD 2014: Case Carmen Copper 18
Client has objective
Established project team understand the
site conditions
Provide an engineering solution
to meet current & future needs
Fast tracked Detailed
Engineering & Design
Fast tracked & Project
Execution (EPC)
Site Support & Services (Ongoing
Relationship)
Outotec All rights reserved
Photos
Dec 4 Outotec CMD 2014: Case Carmen Copper 19
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 20
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 21
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 22
March 2013
Outotec All rights reserved
April 2013
Dec 4 Outotec CMD 2014: Case Carmen Copper 23
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 24
May 2013
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 25
June 2013
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 26
July 2013
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 27
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 28
September 2013
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 29
October 2013
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 30
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 31
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 32
Outotec All rights reserved
Dec 4 Outotec CMD 2014: Case Carmen Copper 33
Life cycle approach III: process optimization at existing facilities, increasing recovery while reducing opex - Carmen Copper Brownfield Upgrade ProjectContentsThe challengeProject spotlight - Carmen Copper, PhilippinesCarmen Copper Brownfield UpgradeWhat was Outotec's scopeTechnology supplied all based on Outotec's proprietary equipmentScope of work for project extended beyond equipment delivery into life cycle services Visual of scope of workVisual of scope of workA good example of Outotec strategy in action - leveraging technology leadership & geographical presenceKey steps in securing contractHow Outotec generates value for its clients - HG Cleaner Circuit exampleHG Cleaner CircuitPrimary benefitsPlant performance recovery increaseImproved energy consumption examplePartnerships benefitsPhotosSlide Number 20Slide Number 21Slide Number 22April 2013Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28Slide Number 29Slide Number 30Slide Number 31Slide Number 32Slide Number 33Slide Number 34