Life cycle approach III: process optimization at existing facilities, increasing recovery while reducing opex - Carmen Copper Brownfield Upgrade Project By Stuart Sneyd Capital Markets Day 2014 December 2014

03_Carmen Copper Case Study - Brownfield Upgrade CMD 2014_FINAL

  • Upload
    ryanyu

  • View
    225

  • Download
    0

Embed Size (px)

DESCRIPTION

case study non Carmen Copper

Citation preview

  • Life cycle approach III: process optimization at existing facilities, increasing recovery while reducing opex - Carmen Copper Brownfield

    Upgrade Project By Stuart Sneyd

    Capital Markets Day 2014 December 2014

  • Outotec All rights reserved

    Contents

    Carmen Copper project Outotec scope of work Outotec strategy in action Example value creation: Copper recovery Example value creation: Power consumption Example value creation: Project delivery Technology partnership benefits

    Dec 4 Outotec CMD 2014: Case Carmen Copper 2

  • Outotec All rights reserved

    The challenge

    Carmen Copper Corporation wished to upgrade capacity at their existing copper/gold concentrator originally built in the 1970s.

    The upgrade had to be integrated into the existing operations and provide complete end to end technology solution for providing additional production capacity.

    Project requirements: Experienced technology partner involved throughout all stages of a brownfield

    upgrade project from conceptual flow sheet development, through to detailed engineering, construction and commissioning.

    Project partner must have an integrated proprietary technology, process know-how, project delivery and plant operations capability.

    Alibility to have a flexible partnership approach combining Carmen Coppers

    intimate knowledge of their ore characteristics with a trusted, knowledgeable technology provider able to deliver a fast-tracked project execution timeline.

    Dec 4 Outotec CMD 2014: Case Carmen Copper 3

  • Outotec All rights reserved

    Project spotlight - Carmen Copper, Philippines Significant South East Asian project Brownfield upgrade EPS project Direct contract with client; no EPCM Successfully brought into operation Ongoing services Commenced discussions for next expansion

    Dec 4 Outotec CMD 2014: Case Carmen Copper 4

  • Outotec All rights reserved

    http://www.atlasmining.com.ph/projects/carmen-copper-corporation

    Carmen Copper Brownfield Upgrade

    Carmen Copper Corporation (CCC) is a wholly-owned subsidiary of Atlas Consolidated Mining and Development Corporation (Atlas).

    CCC has an operating agreement with Atlas and it has exclusive operating rights over the in situ mineral resources and ore reserves of Carmen, Lutopan and Biga mineral deposits.

    Dec 4 Outotec CMD 2014: Case Carmen Copper 5

  • Outotec All rights reserved

    What was Outotec's scope

    Stage 1: Ore throughput upgrade from 40,000 t/d to 60,000 t/d with new plant and equipment

    Stage 2: Modernisation of the existing plant to achieve lower production costs improved health, safety and

    environmental standards operational excellence thereby helping to maintain good

    relationships with their local communities

    Dec 4 Outotec CMD 2014: Case Carmen Copper 6

  • Outotec All rights reserved

    Technology supplied all based on Outotec's proprietary equipment

    Dec 4 Outotec CMD 2014: Case Carmen Copper 7

    2 x 6MW Ball Mills c/w Trommels Flotation Circuit, incl. 4xTC300, 10xOK16

    Blowers 39m Tailings Thickener c/w free standing tank

    2 x 24m Concentrate Thickener retrofits Courier Analyzer, PSI, Sampling System and DCS

    Proprietary equipment offering across all Minerals

    Processing business lines

    including Comminution,

    De-watering and Flotation

  • Outotec All rights reserved

    Technology supply

    Flowsheet design

    Preliminary engineering

    study

    Detailed engineering

    Full detail drafting

    Installation advisory services

    Plant commissioning & optimisation

    Life Cycle Services order

    Scope of work for project extended beyond equipment delivery into life cycle services

    Dec 4 Outotec CMD 2014: Case Carmen Copper 8

    Value of post equipment delivery services approximately 2M and on growing

  • Outotec All rights reserved

    Visual of scope of work

    Dec 4 Outotec CMD 2014: Case Carmen Copper 9

  • Outotec All rights reserved

    Visual of scope of work

    Dec 4 Outotec CMD 2014: Case Carmen Copper 10

  • Outotec All rights reserved

    A good example of Outotec strategy in action - leveraging technology leadership & geographical presence

    Dec 4 Outotec CMD 2014: Case Carmen Copper 11

    EMEA Americas APAC

    Current minerals and metals

    IWT Energy

    Delivery

    Systems integration

    Service

    Proprietary equipment

    Technology

    Larger share of customer capex and opex

    Strengthening geographic presence

    CORE: Process

    technology leadership

    Service

    Proprietary equipment

    Delivery

    Systems integration

    Technology

    A life cycle solution partner for our

    customers

    More Opex

    Larg

    er s

    cope

    s

  • Outotec All rights reserved

    Key steps in securing contract

    Dec 4 Outotec CMD 2014: Case Carmen Copper 12

    Initiated by Site Account Management identifying a significant upside opportunity to services business

    Close cooperation between Solutions, Technology and Services staff to develop a customised solution offering Local partners In country partners Incorporation of customer supplied steel and labour

    Supported by Outotecs Filipino agent

  • Outotec All rights reserved

    How Outotec generates value for its clients - HG Cleaner Circuit example

    Initially only Rougher (flotation)

    circuit to be upgraded Early consultation with Client

    identified a cleaner capacity constraint

    Three options were investigated by Outotec

    Preferred flowsheet investigated under laboratory conditions

    Dec 4 Outotec CMD 2014: Case Carmen Copper 13

  • Outotec All rights reserved

    0.00

    5.00

    10.0

    15.0

    20.0

    25.0

    50.0 55.0 60.0 65.0 70.0 75.0 80.0 85.0 90.0 95.0

    Cu G

    rade

    (%)

    Cu Recovery (%)

    HG Cleaner Circuit

    Early laboratory testwork indicated low Cu concentrate grades

    Optical mineralogy conducted indicated presence of pyrite

    Flotation conditions were therefore modified with finer P80 regrind with lime addition

    Improved plant operating

    results, new circuit configuration validated > fit for purpose circuit design

    Dec 4 Outotec CMD 2014: Case Carmen Copper 14

    Lab Results Product Recovery >80% Concentrate grade 24.5% Cu Plant Targets Product recovery > 80% Concentrate grade > 26.5% Cu

    py

    bn

    cpy

    CuS

    cpy

    cpy

    cpy

    pypy

  • Outotec All rights reserved

    Primary benefits

    The HG cleaner circuit design took production requirements into consideration. The technology partnership promoted a collaborative approach and ensured that during the project design and execution phases, maximum plant production was achieved. This has led to a cleaner circuit design that has been integrated into the float circuit with

    minimal disruptions to plant production and plant availability.

    The HG cleaner circuit design accommodates for both Lutopan and Carmen ore reserves. The technology partnership allowed for the project team to be involved in the upfront laboratory test work. The results were used to refine the equipment selection and circuit design. This will ensure

    less circuit instability when the feed transitions completely from Lutopan to Carmen ore.

    The HG cleaner circuit upgrade project was completed on schedule even though the project had a challenging timeline. This technology partnership allowed for Carmen Copper and Outotec to have a working

    agreement which enabled the design and construction phases to be overlapped and shortened the transition through the various stages of project implementation.

    Dec 4 Outotec CMD 2014: Case Carmen Copper 15

  • Outotec All rights reserved

    Plant performance recovery increase

    Dec 4 Outotec CMD 2014: Case Carmen Copper 16

    Before TC300 + HG Cleaner circuit @ 40,000 t/d Cu recovery 83% (2%); Cu final grade 27% (1%) Initial TC300 + HG Cleaner circuit @ 60,000 t/d Cu recovery 85% (2%); Cu final grade 28% (1%) Current TC300 + HG Cleaner circuit @ 60,000 t/d Cu recovery 87% (2%); Cu final grade 27% (1%)

    Plant results confirm flotation upgrade achieves production targets

    Increase Cu recovery of 4% represents an increased value of recovered copper of approximately AUD 26 million p.a.

  • Outotec All rights reserved

    Improved energy consumption example

    Flotation Cells power consumption: Old Wemco cells = 1.4 kW / m3 flotation volume New Outotec Tank Cells = 0.7 kW / m3 flotation volume

    Specific power reduction approximately 0.7 kW/m3 or -50%

    compared to current installed base or cost saving between the two circuits is approximately AUD 1.5 million per year

    Further opportunity to upgrade existing installed base to secure

    further operational costs savings

    Helping the clients to move production costs down the cost curve is one way Outotec delivers value

    Dec 4 Outotec CMD 2014: Case Carmen Copper 17

  • Outotec All rights reserved

    Partnerships benefits

    Improvement in operational efficiency through access to the latest technologies

    and experienced people

    Reduction in costs offer competitive engineering rates, and

    flexibility in the procurement process

    Improvement in plant availability provide services contracts for spare parts

    & shutdown services

    Improvement in site competencies on site training and operational support

    Improved project delivery fast track delivery with direct contracting

    and single one stop shop capability

    Dec 4 Outotec CMD 2014: Case Carmen Copper 18

    Client has objective

    Established project team understand the

    site conditions

    Provide an engineering solution

    to meet current & future needs

    Fast tracked Detailed

    Engineering & Design

    Fast tracked & Project

    Execution (EPC)

    Site Support & Services (Ongoing

    Relationship)

  • Outotec All rights reserved

    Photos

    Dec 4 Outotec CMD 2014: Case Carmen Copper 19

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 20

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 21

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 22

    March 2013

  • Outotec All rights reserved

    April 2013

    Dec 4 Outotec CMD 2014: Case Carmen Copper 23

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 24

    May 2013

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 25

    June 2013

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 26

    July 2013

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 27

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 28

    September 2013

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 29

    October 2013

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 30

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 31

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 32

  • Outotec All rights reserved

    Dec 4 Outotec CMD 2014: Case Carmen Copper 33

  • Life cycle approach III: process optimization at existing facilities, increasing recovery while reducing opex - Carmen Copper Brownfield Upgrade ProjectContentsThe challengeProject spotlight - Carmen Copper, PhilippinesCarmen Copper Brownfield UpgradeWhat was Outotec's scopeTechnology supplied all based on Outotec's proprietary equipmentScope of work for project extended beyond equipment delivery into life cycle services Visual of scope of workVisual of scope of workA good example of Outotec strategy in action - leveraging technology leadership & geographical presenceKey steps in securing contractHow Outotec generates value for its clients - HG Cleaner Circuit exampleHG Cleaner CircuitPrimary benefitsPlant performance recovery increaseImproved energy consumption examplePartnerships benefitsPhotosSlide Number 20Slide Number 21Slide Number 22April 2013Slide Number 24Slide Number 25Slide Number 26Slide Number 27Slide Number 28Slide Number 29Slide Number 30Slide Number 31Slide Number 32Slide Number 33Slide Number 34