7

029-ITP PAVING AND ROADS.pdf

Embed Size (px)

Citation preview

  • Pearl GTL Project

    LINDE ENGINEERING

    Contractor Project No: 5887 Shell Project No: HP-3000-QAT

    Project Document Number: T- 4.234.580 Project Rev.: B Page 2 of 6

    Purchase Order Number:

    2MH127

    N/A Tag/Item Number(s):

    ASU Unit(s):

    Z PCWBS:

  • QATAR SHELL GTL PROJECT (PEARL) C2 AIR SEPARATION UNITS CONSTRUCTION

    D B 16.03.2008 Ready For Construction SB UA ZG RFC

    C A 26.01.2008 Ready For Construction SB UA MC/ZG RFC

    B O 27.11.2007 Issued for Review IU UA/IO MC/ZG IFR

    A 25.11.2007 Issued for Internal Review IU UA/IO MC/ZG IIR

    GAMA Rev.

    Project Rev Date Description

    Prepared By

    Checked By

    Approved By Status

    No. No. ORIGINATOR

    LINDE ENGINEERING AG

    Document Title:

    ITP FOR PAVING AND ROAD WORKS

    Document No.

    GAM ITP QAC GTL 029 D LOC470

    Contractor

    Gama Qatar Co. W. L. L. Org.

    Code Doc. Type

    Disc. Code

    Geogr. Area

    Seq. No

    Rev. No Vendor Code

    Project Document Number: T-4.234.580 Rev No: B

  • QSGTL PEARL PROJECT C2 ASU Construction Works ITP NO:

    GAM-ITP-QAC-GTL-029

    INSPECTION AND TEST PLAN

    ROADS & PAVING WORKS(FSI) Date / REV. 16.03.2008 Rev- D S. GAMA QATAR E. Not used X. CONTRACTOR QC C. COMPANY A. FUGRO (TPI)

    I: INSPECTION / TEST R: DOCUMENT REVIEW S: SURVEILANCE H: HOLD POINT. W: WITNESS

    Item Activity Characteristic to be Verified Control Procedure Reference Responsible

    Party Acceptance Criteria Verifying

    Documents S X C A

    T-4.234.580 Rev. B Page 4 of 6

    1

    Fill Material a) Classification of Soil b) Particle Size Distribution c) Optimum Moisture Content

    Every 1000 m3 /MT T-13.376.490

    As per ASTM: D422 and BS 1377 As per ASTM: D 1557

    Lab Reports I

    R S I

    2

    Water a) Chlorides b) Sulphates

    c) Ph d)Total Solids

    Once a day/any source change T-13.376.490

    Laboratory

    BS 6068 and BS3148 Source Approval R R R I

    3 Excavation (FSI) a) Soil condition of excavated bottom b) Excavation completed and approved for next activity

    T-13.376.490;T.13.377.360 Site Engineer Latest Project drawings for required bottom levels and condition

    Lab Reports Surveyor Report GAM-QCR-QAC-

    GTL-001/006/008

    I S S I

    4 Fill (In situ) (FSI)

    a) Visual inspection prior backfilling and scarifying the top 150 mm of sub grade b) Area free of deleterious material prior to backfilling c) Adjacent below ground structure correctly coated and protected in accordance with project specification

    T-13.376.490;T.13.377.360

    Site Engineer Area Free from Deleterious Material & as Specification

    Checklist No GAM-QCR-QAC-

    GTL-007 I S S

    5 Soil density (compaction)

    and layer thickness

    Type (A): Every 300 m2 Type (B): Every750 m2

    Type (c): Every400 m3 T-13.376.490 LAB

    As per Project Specification and ASTM D2922, D3017, D556 and D216

    Lab report GAM-QCR-QAC-

    GTL-003

    I S S I

    6 CBR (optional) CBR to be performed when

    compaction/in situ Density not Carried.

    DEP 34.13.20.31 Class 2.42 LAB BS 1377 Chapter -7 Lab Report R S S I

    7 Final Elevation Checks Level of Final Grade Elevation T-13.376.490 Site Engineer Latest Project RFC Drawings for final grade levels

    GAM-QCR-QAC-GTL-006 I

    S/R

    S

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    ITP NO:

    GAM-ITP-QAC-GTL-029

    INSPECTION AND TEST PLAN

    ROADS & PAVING WORKS (FSI) Date / REV. 16.03.2008 Rev-D

    S. GAMA QATAR E. Not used X. CONTRACTOR QC C. COMPANY A. FUGRO (TPI)

    I: INSPECTION / TEST R: DOCUMENT REVIEW S: SURVEILANCE H: HOLD POINT. W: WITNESS Item Activity Characteristic to be Verified Control Procedure Reference

    Responsible Party Acceptance Criteria

    Verifying Documents S X C A

    T.4.234.580 Rev-B Page 5 of 6

    Road width & alignment As per drawing and

    standard specification 34.19.20.31

    As per drawings As per drawings I I R

    Level As per drawings Survey Report GAM-QCR-QAC-GTL-006 I I W

    Form work and Rebar (FSI)

    As per drawings;T.13.377.360 As per drawing As per drawing I I R

    Cleaning (FSI) specification34.19.20.31; T.13.377.360 Free from debris Visual S H R

    Concrete Laying As per drawings

    Site Engineer / QCI

    As per Pour card GAM-QCR-QAC-GTL-009

    GAM-QCR-QAC-GTL-009 I H W

    Flow Test Frequency 1 Test for 1 mix

    T-13.376.358 DEP-34.19.20.31; ASTM C 1611

    Laboratory/ Supplier

    Testing Fresh Concrete. Flow = 650 Max

    Lab Report GAM-QCR-QAC-GTL-017

    I S/R

    S/R

    I

    Compressive strength @7 & 28 days (cube sample as per BS 1881)Testing Frequency as per T-13.376.358 Section 3.33

    T-13.376.358 DEP-34.19.20.31 Laboratory

    BS EN 12390-3 Testing of Hardened concrete-strength of test specimens

    Laboratory Report/Supplier GAM-QCR-QAC-GTL-020

    I S/R

    R I

    Contraction & Expansion joints (FSI)

    34.13.20.31&34.19.20.31; T.13.377.360

    As per Drawing & Company Specifications

    Drawing & Company

    Specification I I R

    Surface Brushed Finishing 34.13.20.31&34.19.20.31 Visual Company Specification S I R

    8 Concrete Paving

    Curing (FSI) Standard specification 34.19.20.31;T.13.377.360

    As per Specification As per Specification S I R

  • QSGTL PEARL PROJECT C2 ASU Construction Works

    ITP NO:

    GAM-ITP-QAC-GTL-029

    INSPECTION AND TEST PLAN

    ROADS & PAVING WORKS (FSI) Date / REV. 16.03.2008 Rev-D

    S. GAMA QATAR E. Not used X. CONTRACTOR QC C. COMPANY A. FUGRO (TPI)

    I: INSPECTION / TEST R: DOCUMENT REVIEW S: SURVEILANCE H: HOLD POINT. W: WITNESS Item Activity Characteristic to be Verified Control Procedure Reference

    Responsible Party Acceptance Criteria

    Verifying Documents S X C A

    T.4.234.580 Rev-B Page 6 of 6

    9

    For Shoulder a)Curb Stone Fixing b)Coating

    a) Level & Alignments

    b)Prime Coat & Tack Coat

    As per drawing and standard specification

    34.19.20.31 Site Engineer As per Drawing & Company Specifications

    Visual & GAM-QCR-QAC-GTL-

    006 I W R

    10 Asphalting to Shoulders Level , Alignments & finishing As per drawing and

    standard specification 34.19.20.31

    Site Engineer As per Drawing & Company Specifications GAM-QCR-QAC-GTL-051 & 052 I W R

    11 Final Inspection Finished Elevation Levels & Documentations 34.13.20.31 &

    34.19.20.31 Site Engr /

    QCI As per drawing As per Spec. &

    Drawings I H W

    ITP for cover road-KAPAK.docITP- Roads & Pavings- 15.03.08.doc Fill Material Water