2
SAP Note Header Data Symptom Only one connection to PBS necessary Other Terms PBS connection, SM59 Reason and Prerequisites The server programs at PBS have been streamlined. Therefore now only one connection is actually needed in SM59 (not as previously where there had to be three entries in SM59 for the connection of SAP HR to PBS MultiLoen Maxi. Solution Import the LCP. The needed changes can also be done manually. In this case do the corrections as outlined below. Furthermore in the GUI-Status HAUPT of report RPPWF1M0 the entries for testing send- and receive connection should be removed. Finally: l Releases 3.1H - 4.0B: Remove the 'Test send connection' and 'Test receive connection' entries from the GUI-Status M09 of report SAPMP50C. l Release 4.5B: Using transaction SE43 remove the 'Test send connection' and 'Test receive connection' from the menu 'PBS-Interface' of the area menu PC00_M09. l Releases 4.6A - 4.6C: Using transaction SE43 remove the 'Test send connection' and 'Test receive connection' from the menu 'PBS-Interface' of the area menu PC09. Validity Correction Instructions Support Packages & Patches 312191 - Only one connection to PBS necessary Version 1 Validity: 21.06.2000 - active Language English Released On 21.06.2000 22:00:00 Release Status Released for Customer Component PY-DK Denmark Priority Correction with low priority Category Advance development Software Component From Rel. To Rel. And Subsequent SAP_APPL 31H 31I 40A 40B 45A 45B 46A 46B 46C 46C Correction Instructions Software Component Valid from Valid to Number SAP_HR 31H 46C 173010 Support Packages Software Component Release Support Package SAP_HR 31H SAPKE31H82 31I SAPKE31I54

0000312191

Embed Size (px)

DESCRIPTION

SAP Note PBS

Citation preview

  • SAP Note

    Header Data

    Symptom

    Only one connection to PBS necessary

    Other Terms

    PBS connection, SM59

    Reason and Prerequisites

    The server programs at PBS have been streamlined. Therefore now only one connection is actually needed in SM59 (not as previously where there had to be three entries in SM59 for the connection of SAP HR to PBS MultiLoen Maxi.

    Solution

    Import the LCP. The needed changes can also be done manually. In this case do the corrections as outlined below. Furthermore in the GUI-Status HAUPT of report RPPWF1M0 the entries for testing send- and receive connection should be removed. Finally:

    l Releases 3.1H - 4.0B: Remove the 'Test send connection' and 'Test receive connection' entries from the GUI-Status M09 of report SAPMP50C.

    l Release 4.5B: Using transaction SE43 remove the 'Test send connection' and 'Test receive connection' from the menu 'PBS-Interface' of the area menu PC00_M09.

    l Releases 4.6A - 4.6C: Using transaction SE43 remove the 'Test send connection' and 'Test receive connection' from the menu 'PBS-Interface' of the area menu PC09.

    Validity

    Correction Instructions

    Support Packages & Patches

    312191 - Only one connection to PBS necessary

    Version 1 Validity: 21.06.2000 - active Language English

    Released On 21.06.2000 22:00:00 Release Status Released for Customer Component PY-DK Denmark Priority Correction with low priority Category Advance development

    Software Component From Rel. To Rel. And Subsequent

    SAP_APPL 31H 31I

    40A 40B

    45A 45B

    46A 46B

    46C 46C

    Correction Instructions

    Software Component Valid from Valid to Number

    SAP_HR 31H 46C 173010

    Support Packages

    Software Component Release Support Package

    SAP_HR 31H SAPKE31H82

    31I SAPKE31I54

  • 40B SAPKE40B45

    45B SAPKE45B30

    46B SAPKE46B12

    46C SAPKE46C04