NOTEThe full presentation covers high voltage systems,
switchboards, 600, 440, 115 volt systems, services andEssential Services, the P&D system.
This was used to develop and teach techniciansAnd the electrical damage control teams who
would also have to attend my electrical workshopsFor CPD.
All system content has been removed.
Aims To develop our understanding of the Type 23 Electrical Power
System and develop the P&D model:
Covering: The basic components of Generators.
How 450/600v Switchboards and ACBs operate.
440v services through EDC’s and MCCB’s.
Distribution via Fuse Panels and Transformers.
Freestanding ROCOS.
Main Rotor & 3Ø Output Stator
PMG – AVR SupplyPilot Exciter Rotor
Main Bearing
Main Exciter Rotor Armature& Stator
AVR Control
Generator
Main Rotor & 3Ø Output Stator
PMG – AVR SupplyPilot Exciter Rotor
Main Bearing
Main Exciter Rotor Armature& Stator
AC to DCRotating Rectifier
AVR Control
Generator
3Ø Output
Main Rotor & 3Ø Output Stator
PMG – AVR SupplyPilot Exciter Rotor
Main Bearing
Main Exciter Rotor Armature& Stator
AC to DCRotating Rectifier
AVR Control
AVR Feedback
Generator
77v29A
160HzAC
49.5v197A
DCOutput
AVR
PMG Stator
Pilot Exciter Main Exciter Rotating Rectifier
Generator
Stator (99 Slots)
AC Full Wave rectified to DC
Main Generator
3Ø 61.2Hz 600v
Feedback Signal
24 poles 8perØ16 poles
Novamax ACB’s Content Removed
Spring Charging (Motor)
Manual Ratchet & Pawl
Solid State Trip Unit
Shock Protection
0.8 Power Factor lag
Novamax ACB’s
Spring Charged(White Discharged)
Close ACBOpen ACB
Charging Handle(Moves Crank)
Breaker Status(Logic Indicator)
OXO Cube(Indicates I1/I2 Trip)
Novamax ACB’s
A 1.9s
B 4s
C 9s
D 16s
E 24s
BatteryCheck &Charge(red LEDilluminates)
BatteryModule
I1,I2Reset
I1 – Long Time Over Current
I2 – Short Time Over Current
2x 6x
2.5x 8x
3x 10x
4x 12x
5x
0.5x 0.9x
0.6x 0.95x
0.75x 1.00x
0.8x
0.1 0.6s
0.2 0.7s
0.3 0.8s
0.4 0.9s
0.5 1s
Trip Indication
(Switches Orange when
tripped)
I3 – Instantaneous Over Current
Summary Developed our understanding of the Type 23 Electrical Power
System and developed the P&D model:
Covering: The basic components of Generators.
How 450/600v Switchboards and ACBs operate.
440v services through EDC’s and MCCB’s.
Distribution via Fuse Panels and Transformers.
Freestanding ROCOS.