PENNDOT DESIGN MANUAL, PART 4 (DM-4)
c-dofegan
Text Box
- SEE PUBLICATION 408, SECTION 1107
c-dofegan
Text Box
SAWTOOTH
c-dofegan
Text Box
& 5.
c-dofegan
Line
c-dofegan
Polygon
c-dofegan
Polygonal Line
c-dofegan
Text Box
CORRECTIONS MADE BY BRIDGE QUALITY ASSURANCE DIVISION ON 12-10-2010
gagordon
Chief Bridge Engineer Approval
gagordon
TPM Signature
gagordon
Text Box
DEC. 21 2010
c-dofegan
Text Box
APPROVED METHOD IS TO DESIGN IN ACCORDANCE WITH DM4 5.14.1.2.7eP WHICH STATES: - A SIMPLE SPAN ANALYSIS FOR NON-COMPOSITE DEAD LOAD AND - THE MORE CRITICAL OF EITHER A CONTINUOUS SPAN ANALYSIS ASSUMING FULL CONTINUITY, OR A SIMPLE SPAN ANALYSIS ASSUMING COMPLETE LOSS OF CONTINUITY FOR COMPOSITE DEAD LOAD AND LIVE LOAD (WITHOUT CREEP AND SHRINKAGE EFFECTS) USE OF FULL CONTINUITY DESIGN PER DM4 5.14.1.2.7dP AND DM4 5.14.1.2.7eP MUST BE APPROVED BY THE CHIEF BRIDGE ENGINEER AT THE T.S.&L. STAGE.
c-dofegan
Polygon
c-dofegan
Line
c-dofegan
Line
c-dofegan
Line
c-dofegan
Polygonal Line
Page 2: )- SEE PUBLICATION 408, SECTION 1107 & 5.CORRECTIONS …€¦ · dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010, type a, corrections made by bridge quality assurance
gagordon
Text Box
DEC. 21 2010
Page 3: )- SEE PUBLICATION 408, SECTION 1107 & 5.CORRECTIONS …€¦ · dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010, type a, corrections made by bridge quality assurance
gagordon
Text Box
DEC. 21 2010
gagordon
Text Box
Page 4: )- SEE PUBLICATION 408, SECTION 1107 & 5.CORRECTIONS …€¦ · dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010, type a, corrections made by bridge quality assurance
gagordon
Text Box
DEC. 21 2010
Page 5: )- SEE PUBLICATION 408, SECTION 1107 & 5.CORRECTIONS …€¦ · dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010, type a, corrections made by bridge quality assurance
c-dofegan
Text Box
CORRECTIONS MADE BY BRIDGE QUALITY ASSURANCE DIVISION ON 12-10-2010
c-dofegan
Text Box
USE A CAULK LISTED IN BULLETIN 15, SECTION 705.8(b).
c-dofegan
Text Box
(DEBONDING SLEEVE)
c-dofegan
Text Box
(ASTM A709, GRADE 50)
c-dofegan
Text Box
(ASTM A108, SEE PUBLICATION 408, SECTION 1105.02(c)3)
c-dofegan
Text Box
HOLE DIAMETER AS REQUIRED BASED ON DIAMETER OF PLASTIC DUCT AND STRAND ANCHOR HEAD. SEAL PLASTIC DUCT TO ANCHOR PLATE AND COUNTER SINK HOLE AS REQUIRED FOR ANCHOR HEAD.
c-dofegan
Polygonal Line
gagordon
Text Box
DEC. 21 2010
Page 6: )- SEE PUBLICATION 408, SECTION 1107 & 5.CORRECTIONS …€¦ · dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010, type a, corrections made by bridge quality assurance
gagordon
Text Box
DEC. 21 2010
Page 7: )- SEE PUBLICATION 408, SECTION 1107 & 5.CORRECTIONS …€¦ · dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010, type a, corrections made by bridge quality assurance
gagordon
Text Box
DEC. 21 2010
Page 8: )- SEE PUBLICATION 408, SECTION 1107 & 5.CORRECTIONS …€¦ · dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010, type a, corrections made by bridge quality assurance
gagordon
Text Box
DEC. 21 2010
gagordon
Text Box
Page 9: )- SEE PUBLICATION 408, SECTION 1107 & 5.CORRECTIONS …€¦ · dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010, type a, corrections made by bridge quality assurance
gagordon
Text Box
DEC. 21 2010
Page 10: )- SEE PUBLICATION 408, SECTION 1107 & 5.CORRECTIONS …€¦ · dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010, type a, corrections made by bridge quality assurance
c-dofegan
Polygon
c-dofegan
Line
c-dofegan
Polygonal Line
c-dofegan
Text Box
, TYPE A,
c-dofegan
Text Box
CORRECTIONS MADE BY BRIDGE QUALITY ASSURANCE DIVISION ON 12-10-2010
c-dofegan
Text Box
FROM A SOURCE LISTED IN BULLETIN 14 OR APPROVED BY MTD.
gagordon
Text Box
DEC. 21 2010
guli
Text Box
11. INCLINED TUBE BLEED TEST - GROUT BLEEDING SHALL NOT EXCEED 0.3% OF THE INITIAL VOLUNE OF THE GROUT AFTER THREE HOURS KEPT AT REST. THE INLINED TUBETEST SHALL BE PERFORED WITH EN 445.
guli
Line
guli
Line
guli
Line
guli
Line
guli
Line
guli
Text Box
INCLINED TUBE BLEED TEST
guli
Text Box
MAX 0.3% OF INITIAL VOLUME OF GROUT AFTER 3 HOURS
guli
Text Box
EN 445
guli
Text Box
(F) FILLERS ARE NOT PERMITTED IN GROUT.
guli
Text Box
TESTING AND ACCEPTANCE (A) TESTING FACILITIES AND EQUIPMENT
guli
Text Box
CORRECTIONS MADE BY BRIDGE DESIGN AND TECHNOLOGY DIVISION ON 10-31-13 ON THE GROUT REQUIREMENTS TO MEET STATE OF PRACTICE
Page 11: )- SEE PUBLICATION 408, SECTION 1107 & 5.CORRECTIONS …€¦ · dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010, type a, corrections made by bridge quality assurance
c-dofegan
Text Box
CORRECTIONS MADE BY BRIDGE QUALITY ASSURANCE DIVISION ON 12-10-2010
c-dofegan
Text Box
DO NOT ALLOW ICE IN THE GROUT MIXTURE.
gagordon
Text Box
DEC. 21 2010
Page 12: )- SEE PUBLICATION 408, SECTION 1107 & 5.CORRECTIONS …€¦ · dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010. dec. 21 2010, type a, corrections made by bridge quality assurance
gagordon
Text Box
DEC. 21 2010
guli
Text Box
(L) INSPECTION CRITERIA REQUIRED BY FHWA
guli
Text Box
NO EARLIER THAN 24 HOURS AFTER GROUTING, PROBE AND PICK THE GROUT WITHIN ANCHORAGE OUTLETS AND ALL HIGH POINT OUTLETS TO IDENTIFY THE PRESENCE OF SOFT GROUT. SOFT GROUT IS CONSIDERED ANY GROUT THAT IS UNHARDENED. IF SOFT GROUT IS FOUND CEASE ALL GROUTING OPERATIONS AND NOTIFY THE DEPARTMENT REPRESENTATIVE.
gagordon
Text Box
guli
Text Box
CORRECTIONS MADE BY BRIDGE DESIGN AND TECHNOLOGY DIVISION ON 10-31-13 ON THE GROUT REQUIREMENTS TO MEET STATE OF PRACTICE