❖ Site Parameters❖ Survey Results❖ Outreach Summary❖ April 16 Design
Workshop❖ Ideas for Discussion
Agenda
Site Parameters❖Zoning & National Scenic
Area
❖Lighting & Noise
❖Wetland
❖Drainage
❖Transportation & Access
❖Unconstrained land
Article 75General Management Area - Rural Residential - 10 380. Review Uses with Additional Approval Criteria – Residential Land
➢ Community parks and playgrounds, consistent with the guidelines of the National Park and Recreation Society regarding the need for such facilities.
Zoning & NSA
Article 75Developed Setting - Rural Res. 520. General Management Area Scenic Review Criteria – Residential Land
➢ New development in this setting shall be compatible with the setting, but not necessarily visually subordinate.
➢ West of Hood River Urban Area, east of Country Club Road (Rural Residential)
Zoning & NSA
Lighting & NoiseUnshielded Lighting
Shielded (Dark Sky) Lighting
520. General Management Area Scenic Review Criteria
➢ Exterior lighting shall be directed downward and sited, hooded, and shielded such that it is not highly visible from key viewing areas. Shielding and hooding materials shall be composed of non-reflective, opaque materials.
➢ HOWEVER - This site is not in a visually subordinate area of the NSA
Lighting & NoiseUnshielded Lighting
Shielded (Dark Sky) Lighting
390. Approval Criteria for Specified Review Uses on Lands Designated Rural Residential
➢ The proposed use will be compatible with the surrounding area. Review of compatibility shall include impacts associated with the visual character of the area, traffic generation, and noise, dust and odors.
Lighting & NoiseUnshielded Lighting
Shielded (Dark Sky) Lighting
Depends on uses & management
➢ What kind of lighting?➢ When will it turn off?➢ Will there be a PA system?➢ Whistles at night?➢ How will neighbors and
other community members be involved?
Wetland - 0.92-acre palustrine freshwater emergent (PEM)560. General Management Area Wetland Review Criteria
➢ Buffer zones shall be measured outward from a wetlands boundary on a horizontal scale that is perpendicular to the wetlands boundary
➢ Herbaceous communities buffer:
150 feet
Wetland - 5.75-acres with 150’ buffer560. General Management Area Wetland Review Criteria
The following uses may be allowed in wetlands and wetlands buffer zones:
➢ The construction of minor water-related recreation structures that are available for public use...boardwalks; trails and paths...; observation decks; and interpretative aids, such as kiosks and signs.
Source: Greenworks
Site Drainage
Drainage Tiles➢ Installed by previous
owners during agricultural use
➢ Excavator told current owners tiles are blocked/damaged
➢ Repair is underway
City TSP identifies 2 possible road extensions with 70’ ROW
35’ buffer requested
= 1.57-acres
Transportation & Access
70’ ROW = 35’ onsite buffer
Rocky Road Access➢ Northern neighbors
strongly oppose access off of Rocky Road
➢ Narrow entry point at Rocky Road & May St
➢ Increased use of Rocky Rd as bike/foot/dog path
Rocky Road access point Transportation & Access
City and County TSP identifies traffic issue area at Fairview & Belmont intersection
Fairview & Belmont traffic issue area
Transportation & Access
WETLAND BUFFER - 5.75 acres
Buffer contained within site = 5.75 acres (250,397.9273 sq ft)
ROW BUFFERs - 1.57 acres
N-side = 23,100 sqftE-side = 45,500 sqft
TOTAL = 68,600 sqft = 1.57 acres
TOTAL UNCONSTRAINED LAND 20.06 acres - (5.75 acres + 1.57 acres) =
12.74 acres
Unconstrained Land
Where we are in the process
This is the text
Community Outreach
Gathering “chill zones” Park amenity and facility
fragmentation Fire pits, water features,
food carts, slack lines- interesting features
Youth - HRV High School
Honored Citizens 65+Active aging (adult
playground)Covered pavilion or
dedicated natural space for light exercise or meditation
Wetland enhancement, water features, other aesthetics
Signage and accessibility
Latino Outreach
Radio Tierra!Next Door Inc. St. Mary’s ChurchTranslated surveys - 23% of
total surveys¼ of design workshop
attendees
Latino Outreach
Major themes:Community
gatheringSocial spaces
(kioskos)Place for kids SCORP: Hood
River is “high priority” for equitable park access
Neighbors Focus groupsIndividual surveyDoor to doorMajor themes:Parking /AccessLightsDrainageThankful for
involvement
This is the title
This is the text
Open House Event
A Community’s Vision...
...with different VALUESNatural Mixed / Mixto Active / Activo
A Shift in Approach
April 16 - Community Design Workshop
PresentationBackground of project
Summary of work completed thus far
Outline of engagement data
Voting ExerciseWhen would you use the
park?5am - 12pm: ⅓ of room
12pm - 4pm: ⅓ of room
4pm - 7pm: ⅙ of room
7pm - close: ⅙ of room
Lighting support?Mixed - more no and I
don’t know then yes
How late?8 pm - about 15 folks
9 pm - about 9
10 pm - zero
11 pm - zero
Voting ExerciseWould you support a parks issued- levy or bond for park
development, operations and maintenance? For example, If you would have to pay $.10/$1,000 of your assessed property value to develop the park, would you still want this park? e.g. $250K home =$25/year (This would generate a $2 million fund)
YES!
Voting ExerciseDo you think city-collected SDCs
should be used to fund the development of this park?
Mostly yes
Should there be a fee for user groups used to support park maintenance?(user groups= sports teams, gardeners, fees for renting facilities)
Mostly yes and I don’t know
Should people have to pay for parking?
Largely no
Translate your Dreams, Ideas & Values
INTO
Physical Forms and Models
TO
Affect the Planning Process
James Rojas - PLACE IT!
Key Findings
Picnic on the Site
What does it all mean?
Mission“The Mission of the Hood River Valley Parks and Recreation District is to provide recreational opportunities to the citizens of the Park District, with focus on the youth of our community. Facilities and programs will be developed and maintained to provide safe and economical recreational environments for all users.”
Guiding Principles:The Park District will develop new parks and recreation facilities to
serve a diverse range of residents within the Park District, and will implement such projects in a fiscally responsible manner.
The Park District will capitalize on new opportunities as they arise even if not specifically identified in the Master Plan.
Diversity and Connection
Can it happen?
YES!Engage the communityWelcome a unique vision
Value the siteBe creative
Questions?