Capacity Expansions of LOSSAN
Corridor in San Diego
APTA Rail Conference - June 2011
Bill Prey, P.E., San Diego Association of Governments
Brett Rekola, P.E., North County Transit District
LOSSAN Corridor in So. California
• Los Angeles – San Diego – San Luis Obispo (LOSSAN) corridor
• 2nd busiest passenger rail corridor in U.S.
• 351 miles in length
• 8.5 million annual trips
• 100+ daily trains - COASTER
- Amtrak
- Metrolink
- BNSF Freight2
LOSSAN Corridor in San Diego
• 60 miles in SD County
• 50 percent single track
• Six coastal lagoons
• Two right-of-way owners: NCTD and MTS
• NCTD Maintains and Operates
• Service by: Coaster, Amtrak, Metrolink, and BNSF Railway
3
San Diego’s North Coast Corridor
• Oceanside to downtown San Diego
• LOSSAN and I-5 working together to move goods and people efficiently
• Provides transportation options; relieves pressure from I-5
• Critical to San Diego region’s economic future
4
SAN DIEGO CAPITAL
PROGRAM
LOSSAN Corridor
5
Program Goals
• Double track corridor from Orange Co. to downtown San Diego
• Service Improvements
6
COASTER Service Goals
7
Peak
Headways
(minutes)
Off-Peak
Headways
(minutes)
Trains per Day
Home-Office
Trip Time
(minutes)
Today 36 120 22 93
2030 20 60 54 78
Current Projects
• 20 projects in development
• 10 funded through
construction
• $432 million in funding
• $820 million estimate to
complete
• Schedule currently funded
through 2016
8
San Diego
Carlsbad
Oceanside
Encinitas
Solana BeachDel Mar
Camp PendletonMarine Corps
Base
78
S13
5
8
5
Current Projects
San Diego
Carlsbad
Oceanside
Encinitas
Solana BeachDel Mar
Camp PendletonMarine Corps
Base
78
S13
5
8
5
San Mateo Creek Bridge
Green Beach Bridge
San Onofre to Pulgas Double Track
Red Beach Bridge
Eastbrook to Shell Double Track
Oceanside Stub Track
Carlsbad Village Double Track
Carlsbad Double Track
Poinsettia Station Improvements
Santa Margarita Bridge
Encinitas Pedestrian Crossings
9
San Elijo Lagoon Double Track
San Dieguito Double Track
Del Mar Bluffs Stabilization 3
Los Peñasquitos Lagoon Bridges
Sorrento Valley Double Track
Sorrento to Miramar Phase 1
Sorrento to Miramar Phase 2
Elvira to Morena Double Track
Tecolote/Washington St Crossovers
Project Status – In Construction
San Mateo Creek
Bridge/Trestles
(SD/OC Line)
Santa Margarita
Bridge/Double Track
(Camp Pendleton)
Del Mar Bluffs Stabilization
Phase 3 10
Project Status – Near Construction
Tecolote/Washington Crossovers
Sorrento to Miramar Double Track, Phase 1
Encinitas Pedestrian Crossings - Santa Fe
11
Project Status – In Design/Environ.
• San Onofre to Pulgas Double Track
• Eastbrook to Shell Double Track
• Oceanside Transit Center Stub Track
• Carlsbad Village Double Track
• Poinsettia Station Improvement
• San Elijo Lagoon Double Track
• Sorrento Valley Double Track
• Elvira to Morena Double Track
• San Dieguito Double Track - Environmental
• Sorrento to Miramar Double Track, Phase 2 -
Environmental12
Project Status – Partner Agencies
Project Partner
• Green Beach Bridge Navy
• Red Beach Bridge Navy
• Carlsbad Double Track Amtrak
• Peñasquitos Lagoon Bridges (Design) NCTD
• Centralized Train Control NCTD
• Positive Train Control NCTD
13
PROGRAM SCHEDULE AND
BUDGET
LOSSAN Corridor
14
Corridor Schedule
Jan-09 Jan-10 Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17
COASTER Preliminary Engineering
San Elijo Lagoon Double Track
San Dieguito Double Track and …
Eastbrook to Shell Double Track
Carlsbad Village Double Track
Elvira to Morena Double Track
Sorrento to Miramar Phase 2
Red Beach Bridge
Green Beach Bridge
Poinsettia Station Improvements
Sorrento Valley Double Track
San Onofre to Pulgas Double Track
Oceanside Stub Track
Sorrento to Miramar Phase 1
Los Penasquitos Lagoon Bridges
Tecolote/Washington St. Crossovers
Encinitas Pedestrian Crossings
Del Mar Bluffs Stabilization 3
Carlsbad Double Track
San Mateo Creek Bridge
Santa Margarita River Bridge
P/E and Environmental Design Design By Other Agency Construction
LOSSAN Corridor in San Diego
LOSSAN – TransNet Early Action
FY 10 FY 11 Funded Through
Oceanside Stub Tracks $3.1 $18.0 CON
Carlsbad Double Track $1.6 $1.9 CON
Poinsettia Run Through Track $1.7 $15.5 CON
San Elijo Lagoon Double Track $4.6 $93.2 CON
Sorrento Valley Double Track $3.7 $33.7 CON
Sorrento to Miramar Phase 1 $23.7 $23.7 CON
Elvira to Morena Double Track $0 $80.0 CON
Tecolote/Washington $9.4 $10.2 CON
Eastbrook to Shell Double Track $0 $7.0 ADV
Carlsbad Village Double Track $0 $6.0 ADV
San Dieguito Double Track $0 $5.0 ENV
Sorrento to Miramar Phase 2 $0 $5.0 ENV
COASTER Prelim. Eng. (PE) $0 $1.0 PE
Total (in millions) $47.8 $300.2
16
LOSSAN Corridor in San Diego
LOSSAN – Non-TransNet Projects
Total
San Mateo Creek Bridge $8.0
San Onofre to Pulgas Double Track $30.0
Santa Margarita River Bridge $40.6
Carlsbad Double Track (Amtrak) $18.9
Encinitas Pedestrian Crossings $6.5
Green Beach Bridge (Navy) $7.0
Red Beach Bridge (Navy) $16.0
Del Mar Bluffs 3 $4.7
Non - Early Action Project Total
Early Action Project Total
$131.7
+ $300.2
Total Program Budget (in millions) $431.9
17
18
PROGRAM HIGHLIGHTS
LOSSAN Corridor
19
Program Highlights
Sorrento to Miramar, Phase Two
• Slowest track segment south of LA
• 1.9-mile double tracking
• 2.2% Grade
• Curve realignment
20
San Elijo Lagoon Double Track
• 1.5-mile double track
• Bridge replacement
• Sensitive wetland environment
• Collaborating with Lagoon Committee
21
Program Highlights
Elvira to Morena Double Track
• 2.6-mile double track
• Coordination with Mid-Coast Trolley corridor
• Sensitive wetland environment
22
Program Highlights
Oceanside Transit Center Stub
Track • Modified location of stub track to remain within existing right-of-way
• Avoided $4M to $5M in potential cost
23
Program Highlights
Poinsettia Station Improvements
• Value engineering solution eliminated third run-through track
• Savings of $1.5M to $2.5M
24
Program Highlights
25
26
27
28
QUESTIONS & ANSWERS
More Information: www.keepsandiegomoving.com
LOSSAN Corridor
29