Production Diary – Day 1
Date – 18/11/16
Location – Art Room, Manshead School, Dunstable
Scene(s) filmed – Title sequence
Today we filmed approximately half of the title sequence, using the artwork from one of our illustrators. In order to do
this, we used the following equipment – a tripod, camera, and camera slider. Within this, we worked collaboratively in terms of creativity and technique, Chris took the role of camera operator which allowed us to film. I took the role of Producer meaning I could help evaluate what shots were appropriate for which part of the title sequence. I also helped by featuring in the production by painting in the background of shots etc.
Evaluation –
Overall, the quality of the footage was very high. We managed to gain many successful shots that would be featured within our opening sequence. The use of Chris’ equipment really helped to contribute to the high standards of shots
and the Mise en scene suited the title shots particularly well. I feel we could perhaps re film a few shots just to make everything 100% certain however majority where fine.