Upload
mohitagarwal687
View
295
Download
0
Tags:
Embed Size (px)
Citation preview
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
C & C System Over View Harness
General TerminologyManufacturing StepsC & C SystemSub System Overview
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
General Terminology
What is Harness ?
Harness is a composite electric circuit of automobile. It works as nervous system of a vehicle
Harness Operations Cut & Crimp
Cut
Crimp
Splice
Part Fitting
Sub Assembly
Assembly
Inspection
Packing & Dispatch
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
APPLICATION OVER VIEW
This system computerizes Wire Harness manufacturing and integrates the manufacturing process such as C&C production schedule, Optimization process, lead wire C&C instruction and C&C production output.
PURPOSE OF THE SYSTEM DEVELOPMENT Improvement of control accuracy
Reduction of the office work load
Reduction of manual operation time
Stable manufacturing
The best operation instruction
Introduction of C&C
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
International
VAN Terminal
C&C Server
C&C ClientsLaser Printer
C&C System
System Composition
Komax Networked Machine
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
C&C SYSTEM (Network Overview)
C&C Server(SQL Server 2K)
LeadStores
HP LaserJet 8150
C&C ClientPDT
BarcodeScanner
C&CPlanner
C&C Client & WPCS Format
Generator
HP LaserJet 8150 TEC PRINTER
(For EFU Tkt)
C&C Client
LAN
WPCS Enabled Wire processing
machines
DHS Server(SQL Server 2K)
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
Sub System Over View
1. Send & Receive Data Sub System2. BOM Maintenance Sub System3. C & C Daily Production Schedule (CPS) Sub System 4. Optimization Sub System5. Production Output Report Sub System6. Master Files Maintenance Sub System7. CUP Sub System 8. Stock Taking Sub System9. GBG Sub System
This system consist of following modules
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
Send & Receive Data Sub System provide the functions to get BOM data and to import to the C&C system.
Send & Receive Data Sub System
BOM -: Bill Of Material for C&C System is the data prepared by SWS for design of new products.
B O M D ata H e ig h t D a ta
B O M fo r C & C S ys tem
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
BOM List Of Not Set Height
C&C Clients
List of not set MachineNo.
Wire Type Change List
New Wire List
New Terminal List
New Material List
BOM Upload List
BOM Upload Error List
ProductBOM
SpliceBOM
MaterialDetail BOM
MHBOM
MaterialBOM
CircuitBOM
CircuitGrp Detail
Terminal
Material
SetMachine No
Height
BOM
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
O DENGRP.TXT NCPS
Height Upload List
Height
WONCPS
CircuitBOM
LocalHeight
CKYOZKN.TXT
TANZKN.TXT
HGTKAN.TXT
Height Upload
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
BOM Maintenance Sub System
BOM Maintenance is to add some production condition (Ex Machine Condition)
BOM data can be displayed, modified, added, deleted and copied.
BOM related Lists are displayed. (Circuit BOM List, Terminal Usage List and so on.
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
Output Report for BOM sub system
Report Name Report Explanation
Product BOM List When you want to confirm the Product BOM, use this list.
Circuit BOM List When you want to confirm the Circuit BOM, use this list.
Wire Requirement List When you want to check the ‘Wire Requirement’ per all product No / specific product No / CPS , use this list.
Terminal Requirement List
When you want to check the ‘Terminal Requirement’ per all product No / specific product No / CPS , use this list.
Terminal Usage List When you want to check the ‘Terminal Combination Pattern’ per all product No / specific product No / CPS , use this list.
Wire & Teminal Usage List
When you want to check the ‘Wire & Terminal Combination Pattern’ per all product No / specific product No / CPS , use this list.
Material Requirement List
When you want to check the ‘Material Requirement’ per all product No / specific product No / CPS , use this list.
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
C & C Daily Production Schedule (CPS) Sub System
Production Schedule
C&C Schedule
ProductionSchedule List List
1
4
7
2
5
8
3
6
(1)
(2)
(3)Output CPS ReportCPS Arrangement
The Registration of C&C schedule is necessary to keep the C&C System based on the production schedule.
CPS Sub System includes the function to register the C&C schedule for scheduling staff according to customer purchase order.
C&C start date and issue date
You should input issue date every “Lot No” or “Work Order No” when you register the C&C schedule.
Each C&C start date and short code is set by C&C system automatically.
Decision of C&C start date
You can specify the L/T in every process pattern.* L/T abbreviation for “Lead Time”.
Single Wire L/T
Splice processing L/T
Non Single Wire processing L/T (Pre Insert, Manual Crimping)
Special Wire L/T
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
How to get a start date in each process(1). Single Wire L/T = Single Wire L/T(2). Splice Wire L/T = Single Wire L/T + Splice processing L/T(3). Non Single Wire L/T = Single Wire L/T + Non Single processing L/T(4). Special Wire L/T = Special Wire L/T(Ex.) 1. Single Wire L/T 1 day 2. Splice processing L/T 1 day 3. Non Single Wire processing L/T 2 days 4. Special Wire L/T 4 days
Issue Date Nov 15
Nov 11th Nov 12th Nov 13th Nov 14th Issue Date
Single Wire 1Splice Wire 1 2 Non Single Wire 1 2 3Special Wire 4
CPS Sub System
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
Optimization Sub System
BOM
EFU ExtractionCheck List
12
3
(1) EFU Extraction
(2) Optimization
(3) Machine working loadArrangement
CPS Data
4
EFU
(4) Report Output
The brief of Optimization Sub System is as the follows.
Daily working data is extracted from CPS data and after optimization EFU data is prepared.
EFU data is ordered in consideration of change time or EFU No or Process Pattern.
Optimization related reports are available. (Daily Working Report, Work Load List and so on
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
Manual OptimizationYou can arrange the auto optimization result manually.Moving inside the same machineThe order change on the specific machineMoving between the machinesEFU data moving between the specific machines
Optimization Sub System
Work Load List
Work Load Detail List
C&C Instruction Sheet
Lead Set-up report
Daily Working Report
Wire Requirement List
Wire Preparation List
Terminal Requirement List
Terminal Preparation List
Material Requirement List
EFU Sheet (Normal)
EFU Sheet (Emergency)
This list is to confirm the man-hour and set-up time and production quantity per shift and machine.
(This list is used for machine working load arrangement.)
This list is to confirm the circuit information and man-hour and set-up time and production quantity per shift and machine.
(This list is used for machine working load arrangement.)
EFU
This is a daily report to fill the EFU order and defect information and actual height information.
This list is used for wire preparation.
Wire type, wire size, wire flex, production quantity is outputted.
This list is used for wire preparation.
Wire type, wire size, wire flex and production quantity is outputted per machine..
This list is used for terminal preparation.
Directions sheet for C&C operator.
This is EFU for emergency.
Specify the product no and circuit, and output the EFU one by one.
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
Production Output Report Sub System
Daily WorkingReport
(1) Input Actual Result
EFU HalfTicket
(1) Refer to the Actual Result
Progress Status Screen
You Input actual C&C result of operator by the Daily Working Report.You register actual C&C result of EFU by using barcode reader.
Refer to the C&C completion status on the C&C status screen if necessary.
Output Reports are as follows.
1.SKT List
2.Efficiency List(per M/C or per Operator)
3.Defect List
Status Enquiry is obtained along with the information details regarding the
A. Circuit giving Terminal as well as Material Description
B . Defect giving the defect quantities corresponding to the defect
codes
4.Machine Maintenance List
5. Daily Working Report
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
Master Files Maintenance Sub System
We must adjust some manufacture conditions again in this sub system when produces the new product or introduce a new auto C&C machine and so on
Standards of the factory can be decided.
Standards of machine can be decided.
Access limit of user can be decided.
(Standard Data) Capacity of factor C&C Machine OperatorTerminal Wire
Standard Tables
(1) Input the standard data
Machine Cutting (Type/Size)Manual Cutting (Wire Length)TerminalMaterialApplicatorPre-Ins MaterialWire Bunch ClassWire Bunch ConditionProcessMachine NoMachine SettingMachine ConditionCircuit ConditionWire Bunch SizeUnnecessary BOM dataChange Wire TypeWireCalendarLead TimeSerial NoOperatorDefect CodeSpoilage CodeM/C Std Run TimeHeight Check ScreenO/H TerminalTerminal RetentionLocal HeightUser IDPGM FunctionPGM Function RelationFunction CTL
BOM
Others
Process Decision
Machine Decision
Others
Working DayLead Time Operator Name
User ID/NamePGM ID/NameUser and PGM RelationSystem Function Control
Send & Receive data Sub System
CPS Sub System
POR Sub System
Height Relation
System
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
CUP Sub System
Purpose of the CUP subsystem is to introduce an imaginary product using multiple Products which have similar circuit Information common at different level.Common Product is a combination of products which share some common circuit information.Products which share some common circuit information and combine together form a common product, are called component product.
Advantages of CUP SystemNumber of EFU’s can be reduced and production quantity for each lot can be increased.The setup time (Changeover Time) will be reduced.C&C production efficiency will be better.
Product #A Product #B
Product #C
Common Circuits in Product #B & #C
Common Circuits in Product #B & #A
Common Circuits in Product #A & #C
Common Circuits in Product #A, B & #C
Common Product
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
Stock Taking Sub System
This subsystem can support the stocktaking job for C&C area.Prints the stocktaking check sheet.Staffs for stocktaking fill this check sheet with circuit or material quantity in C&C area.There are 4 method for filling the check sheet. Circuit Group and quantity Circuit and quantity EFU Serial No and quantity Circuit and material quantity
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
GBG Subsystem
Unnecessary data that it passed through the specified term is exported to text file and compress. After this, these data is deleted from C&C database.
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
To meet the requirements of SEWS-E (Sumitomo Electric Wiring System Europe) following 2 modules has been added in the Standard C&C System.
Module: 1• STOCK CONTROL SYSTEM
( SEWS-E system )
Module: 2• MRP SUBSYSTEM
( SEWS-E system )
SEWS-E C&C (System Overview)
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
SWS/UK HEIGHT DATA
I.H.S CADDATA
LESZNO DEVA TOPOLCANYRAWICZ
CUTTINGMACHINE
ORASTIE
ENGDEPT
ENGDEPT
ENGDEPT
ENGDEPT
ENGDEPT
MACHINENETWORK
MACHINENETWORK
MACHINENETWORK
MACHINENETWORK
MACHINENETWORK
CUTTINGMACHINE
CUTTINGMACHINE
CUTTINGMACHINE
CUTTINGMACHINE
LOCALMRP
&LEADS STOCK
SYSTEM
ASSEMBLY
C&CSYSTEM
C&CSYSTEM
C&CSYSTEM
C&CSYSTEM
C&CSYSTEM
SEWS-E C&C (System Overview)
ALBA
ENGDEPT
MACHINENETWORK
CUTTINGMACHINE
C&CSYSTEM
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
ASSEMBLYPLANNING
ENGINEERING
I.H.SC.A.D
HEIGHT DATA
CST PROCESSES
StandardC&C
System
MPSDATA
PRODUCTB.O.M.s
HEIGHTDATA
MACHINENETWORK
D.H.S MPS
MACHINE TYPE DATACIRCUIT BOM DATA
STOCK DATAMRP RESULT
MACHINE OPTIMISATION DATATICKET DATA
MACHINE NETWORK DATABUILD SCHEDULES
C&C SYSTEM
LEAD STORESTOCK
SYSTEM
ASSEMBLY
ALSO NONNETWORKMACHINES
SEWS-E C&C (Data Flow)
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
C&C Assembly CPS
MRPCut Lead Stock Build Schedule(Planned qty )
Safety Stock
DecreaseIncrease
DHS Assembly MPS
CC masterfile CC optimisation
Order PolicyModifiers ( LT / Calendar etc )
Availability Reports
Decrease
Daily working report & Tickets
MRP CheckReport
LEAD STORES
C&C PROCESS
Suggested CuttingSchedules After MRP
BOOK IN
BOOK OUT
KITTING
BUILD SCHEDULES
SEWS-E C&C (Stock/MRP Logic)
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
SEWS-E C&C (MRP Suggestion)MRP Suggestions As on >> 10/02/03 <<
Common Product or Product Number : TOYDRLH ( example )
Bundle Qty MRP Suggestions
A Side B Side BECC CCVC 10/02/2003 17/02/2003 24/02/2003 Safety Stock Arrears Current Future 1 Week 1 Week 17/02/2003
#PO P79 0 60 240 240 240 60 0 0 240 0 240 60 240#R1 JAV 0 60 240 240 240 60 0 0 240 0 240 60 240$NE JAT 0 60 240 240 240 60 0 0 240 0 240 60 240$NL JAU 0 60 240 240 240 60 0 0 240 0 240 60 240$QE Q43 0 60 240 240 240 60 0 0 240 0 240 60 240$QT Q17 0 60 480 480 480 60 0 0 480 0 480 60 480$QU Q18 0 60 480 480 480 60 0 0 480 0 480 60 480%Z3 #ZE 0 60 240 240 240 60 0 0 240 0 240 60 240%Z3 &EA 0 60 360 360 360 60 0 0 360 0 360 60 360%Z3 JAW 0 60 240 240 240 60 0 0 240 0 240 60 240%Z3 Z62 0 60 240 240 240 60 0 0 240 0 240 60 240%Z3 ZHU 0 60 240 240 240 60 0 0 240 0 240 60 240*1 *2 0 60 480 480 480 60 0 0 480 0 480 60 480JJJ PM1 0 60 240 240 240 60 0 0 240 0 240 60 240JJJ PM4 0 60 240 240 240 60 0 0 240 0 240 60 240JJJ PMZ 0 60 240 240 240 60 0 0 240 0 240 60 240P64 P80 0 60 240 240 240 60 0 0 240 0 240 60 240P65 P81 0 60 240 240 240 60 0 0 240 0 240 60 240PNK PNM 0 60 240 240 240 60 0 0 240 0 240 60 240PP4 PMW 0 60 240 240 240 60 0 0 240 0 240 60 240R47 R86 0 60 480 480 480 60 0 0 480 0 480 60 480R48 R52 0 60 480 480 480 60 0 0 480 0 480 60 480
0 0 6600 0 6600 1100 66000 0 2400 0 2400 400 24000 0 1440 0 1440 300 14400 0 2760 0 2760 400 27600 0 6600 0 6600 1100 6600
868
22Total Sub Circuits Total Circuits
Sub Circuits QuantityGrand Total
Total Single CircuitsTotal Splice Circuits
Past Due Suggestions
Total QuantitySingle Circuits QuantitySplice Circuits Quantity
Circuit Details MPS Schedule Stock Profile Build Schedule
Both Ends Common Crimp
Common CircuitVersionCode
MPS Scheduled Line Issue dates from DHS
MRP Suggested Cutting Quantity and Date
MRP Suggested Cutting Quantity outside of 5 Day Lead Time
Cut Date03/02/2003
Cut Date10/02/2003
Cut Date17/02/2003
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
SEWS-E C&C (MRP Status)MRP Status As on >> 10/02/03 <<
Common Product or Product Number : TOYDRLH ( example )
Bundle Qty MRP Suggestions
A Side B Side BECC CCVC 10/02/2003 17/02/2003 24/02/2003 Safety Stock Arrears Current Future 1 Week 1 Week 17/02/2003
#PO P79 0 60 240 240 240 60 0 0 480 300 0 0 0#R1 JAV 0 60 240 240 240 60 0 0 480 300 0 0 0$NE JAT 0 60 240 240 240 60 0 0 480 300 0 0 0$NL JAU 0 60 240 240 240 60 0 0 480 300 0 0 0$QE Q43 0 60 240 240 240 60 0 0 480 300 0 0 0$QT Q17 0 60 480 480 480 60 0 0 960 540 0 0 0$QU Q18 0 60 480 480 480 60 0 0 960 540 0 0 0%Z3 #ZE 0 60 240 240 240 60 0 0 480 300 0 0 0%Z3 &EA 0 60 360 360 360 60 0 0 720 420 0 0 0%Z3 JAW 0 60 240 240 240 60 0 0 480 300 0 0 0%Z3 Z62 0 60 240 240 240 60 0 0 480 300 0 0 0%Z3 ZHU 0 60 240 240 240 60 0 0 480 300 0 0 0*1 *2 0 60 480 480 480 60 0 0 960 540 0 0 0JJJ PM1 0 60 240 240 240 60 0 0 480 300 0 0 0JJJ PM4 0 60 240 240 240 60 0 0 480 300 0 0 0JJJ PMZ 0 60 240 240 240 60 0 0 480 300 0 0 0P64 P80 0 60 240 240 240 60 0 0 480 300 0 0 0P65 P81 0 60 240 240 240 60 0 0 480 300 0 0 0PNK PNM 0 60 240 240 240 60 0 0 480 300 0 0 0PP4 PMW 0 60 240 240 240 60 0 0 480 300 0 0 0R47 R86 0 60 480 480 480 60 0 0 960 540 0 0 0R48 R52 0 60 480 480 480 60 0 0 960 540 0 0 0
0 0 13200 7700 0 0 00 0 4800 2800 0 0 00 0 2880 1740 0 0 00 0 5520 3160 0 0 00 0 13200 7700 0 0 0
868
22
Past Due Suggestions
Total QuantitySingle Circuits QuantitySplice Circuits Quantity
Circuit Details MPS Schedule Stock Profile Build Schedule
Total Sub Circuits Total Circuits
Sub Circuits QuantityGrand Total
Total Single CircuitsTotal Splice Circuits
Both Ends Common Crimp
Common CircuitVersionCode
MPS Scheduled Line Issue dates from DHS
MRP Suggested Cutting Quantity and Date + Emergency 2 qty
MRP Suggested Emergency 1 Quantity added to Current ad-hoc tkts made
Cut Date03/02/2003
Cut Date10/02/2003
Cut Date17/02/2003
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
SEWS-E C&C (Stock System Leads Flow)
CCBUILD
SCHEDULES
KOMAX
LEADSTORES
SPLICESETS
&SINGLE
SETS
SUB ASSEMBLY
HARNESSASSEMBLY
NETWORK&
NON NETWORK
SINGLESETS
SPLICING&
SPLICE SETS
98% MINIMUM
ACCURRACY
98% MINIMUM
ACCURRACY
MRPCALCULATION
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
SEWS-E C&C (Data Maintenance)
• SAFETY STOCK MAINTENANCE AT FAMILY LEVEL ( CST PLANNER )
• SLOW MOVING STOCK MONITOR MAINTENANCE ( CST PLANNER )
• CST BUILD SCHEDULE MAINTENANCE 98% ( CST PLANNER )
• STOCK ACCURACY 98% ( LEAD STORES )
• MRP CHECK AND ANALYSIS ( CST PLANNER )
• MEASURES OF PERFORMANCE ( CST PLANNER )
• MACHINE CONSTRAINTS DATA (CST PLANNER )
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
SEWS-E C&C (Stock Processing)
• BAR CODE TRANSACTIONS
• BOOK IN FROM KOMAX , SINGLE / SPLICE LEADS
• SUB ASSY LEADS DIRECT TO SUB ASSY AREA
• MANUALLY BOOK IN LEADS FROM OTHER FACTORY
• BOOK IN SUB ASSEMBLY LEADS AFTER PROCESSING
• SCANNER DOWNLOAD CONVERTS BUILD SCHEDULES INTO STOCK QTY
• CIRCUIT AVAILABILITY TO CHECK STOCK
• CYCLE COUNTING TO MAINTAIN STOCK ACCURACY ( MIN 98% )
• BOOK OUT PRODUCTS OR CIRCUITS / SINGLE OR SPLICE
• CIRCUIT COMPARISON FUNCTION TO FIND ALTERNATIVE CIRCUITS
• BOOK IN FROM ASSEMBLY AREAS
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
SEWS-E C&C (Stock Processing)
• PROGRAM THAT CREATES CUTTING SEQUENCE
• PROCESSES “SETS” OF HARNESSES
• DESIGNED FOR DAILY / WEEKLY CUTTING
• SEQUENCE LOGIC BASED ON MINIMUM CHANGEOVERS
• ALLOWS MANUAL OPTIMIZATION TO M/C SEQUENCE
• “ SETS “ TRACKING BY LINE ISSUE DATE
• AUTO CPS FROM DHS SYSTEM
• CREATES COMMON CIRCUIT OPTIONS
• MRP GENERATED CUTTING SCHEDULE• LEAD STOCK VISION
• SAFETY STOCK FUNCTIONALITY
• LEAD AVAILABILITY REPORTS
• SLOW MOVING STOCK MONITOR• LEAD MATCHING FUNCTIONALITY
• BAR CODE SCANNING TRANSACTIONS
• STOCK COST INTERFACE WITH DHS
© MothersonSumi INfotech and Designs Ltd. A CMM Level 5 Company
End Of Slide
Thank You