RQS—Asset Integrity Services Limited. Is an Asset Integrity Inspection Organization serving Trinidad & Tobago and the Caribbean Region. We offers Specialized NDE Integrity Inspection services of Advance Ultrasonic "UT" Testing and Remote Field Eddy Current "RFEC" Testing, supported with Conventional NDE Inspection & Testing methods back by Highly Trained NDE / NDT Professionals - Level II and III Inspectors applicable to "API, CWI, ASNT & NACE".
Citation preview
vv
COMPANY PROFILE
2
COMPANY PROFILE
Company Profile : RQS- Asset Integrity Services Limited. Date of Incorporation : 15th January 2010. Business Address : 503 Southern Main Road,
La-Romain. Trinidad, W.I. Mobile (Office) : +868-480-9650 / 685-2161. Tel/Fax : +868-652-5369 Email Address : [email protected] Company Website : www.rqs-aisl.com STOW Certified Company: 28th May 2014 – 27th May 2016
Your Solution To Asset Integrity
3
COMPANY PROFILE
RQS—Asset Integrity Services Limited. Is an Asset Integrity Inspection Organization serving Trinidad & Tobago and the Caribbean
Region. We offers Specialized NDE Integrity Inspection services of Advance Ultrasonic "UT" Testing and Remote Field Eddy Current "RFEC" Testing, supported with Conventional NDE Inspection & Testing methods back by Highly Trained NDE / NDT Professionals - Level II and III Inspectors applicable to "API, CWI, ASNT & NACE". General Plant Services:- that covers the examination and testing of plant and equipment including Pressure Vessels, Columns, Tankage (floor, shell and roof), Boiler Tubes, Heat-Exchangers " Straight and U bend" Tubes, Compressor Fin Tubes, Platforms (inclusive of Clusters & Risers), Piping / Process Piping, Derricks. etc., in accordance with applicable codes and standards to establish and / or verify fitness for service including identification of any requirements to maintain integrity. NDT / NDE Services:- that covers the use of Non-Destructive Testing and Non-Destructive Examination methods to identify, detect, measure, etc., surface and internal discontinuities and other physical characteristics in materials and welds on Pressure Vessels, Columns, Tankage (floor, shell and roof), Boilers Tubes and Pressure Vessels Inspection, Heat-Exchangers "Straight and U bend" Tubes, Compressor Fin Tubes, Platforms (inclusive of Clusters & Risers), Piping / Process Piping, Derricks, Mechanical parts and components. Proficiency required in NDT / NDE methods / techniques applicable to our Clients via. Surface Methods (Visual, Liquid Dye Penetrant, Magnetic Particle Inspection, etc.) or any one or more specialty methods that include, but is not limited to, Ultrasonic Inspection - Welding Inspection, Remote Field Eddy Current Inspection etc.,
4
COMPANY PROFILE
To “provide our customers with the highest level of Reliability, Quality & Safety in Asset Integrity Inspection
and Engineering Consultancy Services” In
Trinidad & Tobago and the Caribbean Region.
5
COMPANY PROFILE
To “Achieve Sustainable Growth” we have established five (5) P’s to support our vision with clear goals: -
Profitability —Maximizing our returns to investor(s) while
being mindful of our responsibilities. People – Developing a great place to work, where people
are inspired to be the best they can be.
Portfolio – Bringing the Country, the Caribbean Region and the World a portfolio of Reliability, Quality and Safety that anticipates and satisfy peoples; desires and needs.
Partners – Nurturing a winning network of partners and
building mutual, loyal & beneficial relationships with other appropriate partners and customers that will enable us to achieve our goal to become a world class service provider.
Plant – Being a responsible global citizen that makes a
difference in our environment.
6
COMPANY PROFILE
RQS-Asset Integrity Services Limited (RQS-AISL) recognizes that leadership in “process reliability” supports our strategy for excellence and growth. We are committed to protecting our assets and our clients physical assets by achieving the highest level of cost effective and reliability inspection processes for the best plant and equipment performance, via knowing the three (3) “T’s”.
“When things fail, how things fail and conversions of failures into time and money”
It is the policy of RQS-Asset Integrity Services Limited (RQS-AISL) to:
Establish equipment & process reliability objective for all levels of
management & staff;
Commit appropriate and sufficient resources to protect & preserve both our
equipment , facilities and that of the clients;
Provide management leadership and encourage all staff members to take
responsibility for and ownership of both our equipment , facilities and that of
the clients;
Assure compliance with all companies operations, maintenance &
reliability policies / practices and to train all staff members to comply with
those policies;
Regularly review and evaluate process reliability programs and practices to
assure that they are effective, up to date and where applicable, implement
corrective actions aimed at minimizing recurrence;
Hold all staff members accountable for the consistent execution of their
work; and
Assure timely and accurate inspection / investigation reports of all planned
and unplanned downtime and inefficiencies of our client’s plant and / or
equipment(s).
7
COMPANY PROFILE
We, as RQS-Asset Integrity Services Limited (RQS-AISL) are totally committed to establishing and implementing a climate where resources and quality processes are continuously controlled by our Quality Management System (QMS) in order to meet our clients’ expectations and needs. We have aligned our QMS with the management system to that of ISO 9001 : 2008 to achieve and satisfy our customer needs and quest for service excellence, via our NDE Philosophy; Reliability, Quality & Safety. The Management Team and I (Head of HSSE & Q) are totally committed to creating the correct environment in which all RQS-AISL personnel are empowered by providing training on an ongoing basis. This will enable RQS-AISL to provide careers to all personnel. Our Management Team, with their diverse experience assures a comprehensive and effective service tailored to meet our clients’ needs. We are extremely dedicated to ensure continuous improvement of RQS-AISL internal / external policies and quality management systems. To achieve this, audits of our QMS will be done on a regular basis. Corrective and Preventative measures will be put in place and monitored regularly at Management Review Sessions. We will form mutually beneficial relationships with other appropriate partners and customers that will enable us to achieve our goal to become a world class service provider. With above measures in place and maintained, “RQS-Asset Integrity Services Limited will deliver a high class service to our customers”.
8
COMPANY PROFILE
It is an important duty of RQS-Asset Integrity Services Limited (RQS-AISL), to ensure the safe operations that protect people, the environment, communities and assets. The company accepts the fact that this implies a corresponding duty of ensuring that necessary resource, equipment, and training is provided to fulfill this obligation that supports sustainable development and compliance with legislation. We at RQS-AISL believe that all accidents can be prevented; supported by an effective Health, Safety, Security and Environmental Policy. This would require the full collaboration and co-operation of all employees; The Management Team and I (Head of HSSE & Q) are totally committed to
Integrating HSSE in how we do business,
Improving HSSE performance in all our activities,
Identifying hazards, controlling risk and preventing HSSE
incidents,
Contributing to the development of sustainable HSSE Management
Systems, through technological innovation and process
efficiencies, to minimize the impact of our operations on the
environment and to provide safe and healthful working conditions,
Demonstrating the importance of HSSE through hands-on
leadership and behavior,
Openness in all HSSE issues with Client Leadership Teams and
active engagement with stake holders and
Ensure that HSSE shall not be sacrificed and / or compromised for
profit and production.
Empower our employee(s) of their rights to stop unsafe working
operation(s).
9
COMPANY PROFILE
10
COMPANY PROFILE
Asset Integrity Inspection & Testing Reliability Specialized NDE Services
Advance Ultrasonic “UT” Technology.
Flaw Finding, Profiling, Imaging, Verifying & Qualifying Characterization.
Remote Field Eddy Current “RFEC” Inspection Technique for Ferrous, Non-Ferrous & a Combination of both Materials.
Risk Based Integrity & Reliability Inspection
Welding, Platforms (inclusive of Clusters & Risers), Storage Tanks, Piping / Process Piping,
Pressure Vessel, Heat-Exchangers “Straight and U Bend” & Compressor Fin Tubes, Turbines, Casing & Tubing – Crossovers, Plates (inclusive of Aerospace and Shipbuilding / Repairs), Structural
Engineering, Gas Cylinders, Pumps and Cranes.
Conventional NDE Inspection & Testing
Magnetic Particle Testing, Liquid Penetrant Testing, Vacuum Box Testing, Load Testing & Statutory Inspections.
Procedures Development & Implementation
Welding Procedures Qualification & Certification,
Reliability, Quality & Safety Consultancy Services
Technical support / advisement On & Off Shore.
Mechanical Integrity matters. Corrosion Management & Cathodic Protection. Advisory Management on Repair Techniques,
Materials Selection, Weld Procedures Specification - (WQS), Procedures Qualification Records (PQR).
Inspection & Testing Requirements. Asset Integrity Management & Risk Based Inspection (RBI) to enhance Plant Integrity and
Reliability. Health, Safety, Security, Environment
& Quality Management Systems.
Third Party Audit & QA / QC Inspection (Labour Supply - NDT / CWI / API / Crane Inspectors).
11
COMPANY PROFILE
LESTER IFILL
Founder / Director – Operations and Head of HSSE & Q
BACKGROUND
Mr. Lester Ifill vision and passion for inspection services over the past fourteen (14) years, resulted in the
organization known as RQS-Asset Integrity Services Limited. He brings to this vision, a wealth of sixteen
(16) years experience in the NDT Industry and HSSE & Q Management Systems documentation and
implementation. Also Mr. Ifill holds the position of Director, Operations and HSSE&Q.
RESPONSIBILITIES
Mr. Ifill is / and would be responsible for the planning, implementing, and execution of any assigned
contract and is the designate Company Representative for the purpose of observing and inspecting
the services being carried out for our Clients. He would also be responsible for adhering to and
carrying out all safety advices as instructed by Clients in connection with the scope of works of ANY
contract and provide the adequate and suitable protective clothing & devices of an approved
standard and instruction in its used, as well as information on instruction, training and supervision. Also, all employees (directors; contractors and sub-contractors) shall be required to used,
maintained and inspect the PPE provide to them by management.
He would specifically oversee and ensure:
1) Overall responsibility for the planning and operation of performing Integrity Inspection, as stated
within the required scope.
2) Delegate responsibilities to NDT Team through the channel of the NDT Supervisor.
3) Coordinate with supervisor and client.
4) Establish or adjust work procedures to meet schedules
5) The provision for collecting, evaluating and circulating HSSE & Q information necessary, visual
aids and other appropriate materials.
6) The facilitation of continuous communication concerning HSSE & Q problems with all relevant
personnel and client.
7) Conduct floor & site inspections of HSSE & Q conformance in collaboration with supervisory
field personnel.
12
COMPANY PROFILE
CONT’D - LESTER IFILL 8) Develop and maintain systems to establish standards relating to activities and products.
9) Develop and maintain systems to measure performance against established standards.
10) Execute the overall responsibilities of the company’s policies (such as Health, Safety, and
Environmental & Quality) & the Quality Management System (QMS).
11) Monitor KPIs according to agreed standards and take necessary action to
communicate/advise/assist according to performance levels.
QUALIFICATIONS
- RAB/ASQ Certified Reliability Engineer # 63819207
- RAB/QSA OSHAS 18001 Certified Lead Auditor Cert. # 0000197528
- Qualified to ASNT Level II – AUT, RFT, MT, PT, & VT.
- Occupational Safety and Health Management Certificate.
- Quality Assurance/Quality Control Management Certificate.
- Paint and Coating Inspection Certificate.
- Supervisory Management Certificate.
- General Management Certificate.
- Business Management Certificate.
- Certified Welding Certificate and Diploma.
- OSHA General Industry Cert. # 900044886
- Member of International Standard for Mechanical Engineering Technicians Cert. # MT-017-
T&T.
EXPERIENCE
Sixteen (16) years experience in various aspects of General, Construction and Petroleum Oil and Gas
Industry Inspection, such as NDT, QA/QC, HSE, Paint & Coating and Welding at Damus Ltd, Trin-Weld
Ltd, Kennicon Engineering Ltd, Atlantic LNG Train 1 & 4, Halliburton, Caribbean Nitrogen Ltd, Atlas
Methanex Limited and In-Corr-Tech Ltd etc.
13
COMPANY PROFILE
PHILIP BERKELEY
Director - Administration & International Business Development Director
BACKGROUND
Mr. Berkeley holds the position of Administration & International Business Development Director at RQS-
Asset Integrity Services Limited (RQS-AISL). He brings a wealth of experience and knowledge in his area
of expertise and has been involved in engineering, quality, operations and project management in the Oil,
Gas, Petrochemical & Power Plant industry since 1979. Since the incorporation of the company in January
2010, and its subsequent activity on the 4th of October 2010, Mr. Berkeley has been involved in all major
project and marketing development as we position the company for growth.
RESPONSIBILITIES: - Administration
Assign and monitor clerical, administrative and secretarial responsibilities and tasks among staff.
Allocation of resources to enable tack performance.
Coordinated office staff activities to ensure maximum efficiency.
Evaluate and manage staff performance.
Recruit and select office staff.
Ensure security and confidentiality of data.
Monitor and maintain office supplies acquisition.
Maintain a safe and secure working environment and
Handle customer inquiries and complaints.
RESPONSIBILITIES: - Business Development
Manage and coordinate all marketing, advertising and promotional staff and activities.
Conduct market research to determine market requirements for existing and future products.
Analysis of customer research, current market conditions and competitor information.
14
COMPANY PROFILE
CONT’D - PHILIP BERKELEY
Develop and implement marketing plans and projects.
Manage the productivity of the marketing plans and projects.
Determine and manage activity within agreed budget.
Direct functions and performance via the project team.
QUALIFICATION
MBA – General Management.
Bachelor of Science – Petroleum Engineering Technology.
Associate of Applied Arts – Oil and Gas Technology.
General Certificate of Education (GCE)’O
EXPERIENCE
Thirty two (32) years experience in various aspects of Projects and Project management in the Oil, Gas,
Petrochemical and Power Plant Industry.
15
COMPANY PROFILE
PHILIP BERKELEY Director of Administration & International Development
LESTER IFILL Director of Operations &
HSSE & Q
SPECIALIST MANPOWER & ESTIMATED WORKFORCE
Statutory Pressure Vessel Inspector (3)
Statutory Hoist and Lift Inspector (3)
ASME Boiler Inspector (3)
Certified Crane Inspector (3)
Plant / Inspection Engineer (6)
API 653 Certified Tank Inspector (6)
API 570 Certified Piping Inspector (8)
API 510 Certified Vessel Inspector (5)
API 580 Certified Risk Based Inspector (1)
Nace Level I; II; III - Certified Coating Inspector (7)
NDT Technician (UT, PT, MT) Level 1-2 (13)
AUT NDT Technician Level 1-2 (1)
Remote Field Eddy Current NDT Technician Level 1-2 (1)
QA/QC Inspector (20)
AWS Inspector (16)
Certified Pipeline Welding Inspector (1)
Auto CAD Technician (8)
Through our intense screening process for qualified, certified, trained inspectors and technicians,
RQS maintains a data base of out-sourced short term and long term inspection professionals for all
on-stream maintenance projects. These project specifications are based on a combination of
education, training, skills, examination, experience and that of local and international Heatlh,
Safety, Environmental and Quality requirements.
16
COMPANY PROFILE
17
COMPANY PROFILE
August 16th, 2011
Mr. Lester Ifill RQS-ASSET INTEGRITY SERVICES LIMITED 11-13 ALMOND BOULEVARD, COCONUT DRIVE, CROSS CROSSING, SAN-FERNANDO, TRINIDAD.
SUBJECT: LETTER OF RECOMMENDATION
Mr. Ifill,
I am writing this letter to thank RQS-Asset Integrity Services Limited (RQS-AISL), as a general contractor, for a job well done on supplying the highest level of Inspection Professionals – Level II &III for our June 7, 2011 – July 23, 2011 Turn-A-Round (TAR) Project.
Within the seven weeks of the project, the inspectors/inspections comprised of:- 1-off Piping Engineer. 2-off Piping Inspectors (570) 2-off Certified Welding Inspectors (CWI) 4-off Non-Destructive Testing Inspectors (NDT)
All provided technical services to support the piping works as requested. These included the preparation of a materials take off sheet and associated specifications for the piping and fittings for the proposed slurry line change out. Works, also carried out, included installation of slurry polymer PVC piping system and modification to the associated slurry piping system.
Works were also done on the design and supervision of the fabrication of the 2 belt press slurry tank platform extensions and installation of a man hole on one of the slurry tanks.
The inspectors provided technical services on the NDT of some of the welding activities on the plant as directed and were also associated with the compilation of the Quality Assurance / Quality Control documentation preparation associated with the NDT activities.
Even though there were several challenges during the course of the TAR project, the inspectors were able to maintain efficiency within the project. Their attention to the specifics of the project has been laudable, and general performance met our high standards.
Again, I would like to express sincerest thanks to all your teammates for the safe and efficient completion of work on our TAR project.
We would not hesitate to refer RQS-Asset Integrity Services Limited to other organizations that are also in need of Reliability; Quality and Safety services from a contractor.
Please feel free to use this letter as a professional reference.
Sincerely,
Daniel R J Peters II Nu-Iron Plant Mechanical Engineer Tel: 1-868-636-1944 ext 3055 Fax: 1-868-679-0561
18
COMPANY PROFILE
Fairy Valley, Christ Church, Barbados, W.I
Tel: (246) 228-4611 FAX: (246) 428-1056/420-4688
June 6th, 2012 TO WHOM IT MAY CONCERNED We are a national state-owned energy provider in the country of Barbados. Founded several decades ago, the company satisfies about 30% of the country's total consumption of oil and gas. In addition, to the many homes connected to the islands' natural gas infrastructure, BNTCL also supplies the Barbados Light and Power Company, the airport, and provides gas distribution for many of the islands' privately owned gas stations. The day to day Operations, Maintenance, Health and Safety of our Employees and Neighboring environs are our number one priority. Every effort is made to prevent any adverse impact on the environment and as such, the integrity of our assets is of utmost important. It is therefore critical for BTNCL to have condition assessments done on our Floor Plates as required by API Codes and Standards. Without any downtime of operations, RQS-Asset Integrity Services Limited (RQS-AISL), who first introduced BNTCL to this AUT-In-Service Technique, was able to assess 2 Crude Oil and 2 Gasoline Storage Tanks – (Annular to Floor Plates), while in-service using the AUT-Shear, Guided and Surface Wave (SGSW) Technique. This methodology has proven to be a very valuable tool as we continue to build on our Risk Based Inspection and Maintenance Program for our Tank Farm facility. It is without any hesitation, that I recommended RQS – Asset Integrity Services Limited and its principals, Mr. Lester Ifill and Mr. Philip Berkeley to your organization. I am confident that the technique being offered by RQS-AISL will undoubtedly add value to any operation that require in-service storage tank condition assessment of their annular and floor plates. Please feel free to contact us should you require any additional information.
19
COMPANY PROFILE
NU-IRON TRINIDAD & TOBAGO
June 7th – July 23rd, Turn-A-Round (TAR) Project
COUNTRY
Trinidad, W.I.
SCOPE OF WORK
Supplying of Inspection Professionals.
Within the seven weeks of the project, the inspectors / inspections comprised of:-
1 – Piping Engineer
2 - Piping Inspectors (API-570)
2 - Certified Welding Inspectors (CWI)
4 - Non-Destructive Testing Inspectors (NDT)
All provided technical services to support the piping works as requested. These included the preparation of a materials take off sheet and associated specifications for the piping and fittings for the proposed slurry line change out. Works, also carried out, included installation of slurry polymer PVC piping system and modification to the associated slurry piping system. Works were also done on the design and supervision of the fabrication of the 2 belt press slurry tank platform extensions and installation of a man hole on one of the slurry tanks. The inspectors provided technical services on the NDT of some of the welding activities on the plant as directed and were also associated with the compilation of the Quality Assurance / Quality Control documentation preparation associated with the NDT activities.
20
COMPANY PROFILE
NU-IRON TRINIDAD & TOBAGO
January 17th – February 12th, Turn-A-Round (TAR) Project
COUNTRY
Trinidad, W.I.
SCOPE OF WORK
Supplying of Inspection Professionals.
Within the four weeks of the project, the inspectors / inspections comprised of:-
1 - Project Coordinator.
3 - Certified Welding Inspectors (CWI).
4 - Non-Destructive Testing Inspectors (NDT).
All provided technical services to support all welding activities (SMAW & FCAW) on the plant Reformer
gas header dog leg bands, dog legs and roof sections tube supports.
BARBADOS NATIONAL TERMINAL COMPANY LIMITED
May 21th – 25th, In-Service Above Ground Storage Tanks Project
COUNTRY
Barbados, W.I.
SCOPE OF WORK
Conduct AUT – Short Range Guided Wave Inspection on 2-off 80’ O.D. Crude Oil and 2-off 85’
O.D. Gasolene Storage Tanks Annular Rings & Floor Plates.
Within the four days of the project, the inspectors / inspections comprised of:-
1 - Project Supervisor / Reliability Engineer.
1 – NDE / NDT Level II Tech.
1 – NDE / NDT Technical Assistance.
Storage Tanks bottom plates was inspected for any signs of minor, moderate and severe wall loss,with
interpretations in the form of Pits, Erosions and / or Stress Corrosions.
21
COMPANY PROFILE
BHP BILLITON TRINIDAD & TOBAGO
January 28th – March 25, Structural Platforms Project
COUNTRY
Trinidad, W.I.
SCOPE OF WORK
Conduct Level I Visual Inspection of all Critical 1 Structural Joints & Members on Central
Processing Platform; Gas Export Platform; Canteen 1 Platform; Kairi 1 & 2 Platforms and Aripo
Platform.
Within the eleven weeks of the project, the inspector / inspection comprised of:-
1 – Level III Nace Certified Corrosion Technician.
Technical support services were provided to identify any existing cracks; signs of excessive corrosion;
bent, missing or damaged members; missing or damaged bolts; and any indications of obvious overloading,
design deficiencies and any operational usage that is inconsistent with the original design intent of the
installation at Heli-Deck; Main-Deck; Mezzanine-Deck; Production-Deck; Cellar-Deck and Working
Point (Jackets), both topsides and undersides.
22
COMPANY PROFILE
BHP BILLITON TRINIDAD & TOBAGO
January 28th – March 25th, Passive Fire Protection Project
COUNTRY
Trinidad, W.I.
SCOPE OF WORK
Conduct Level III Passive Fire Protection (PFP) Visual Inspection on all Piping Supports; Blast
Walls; Buildings; and ESD Valves and Actuators on Central Processing Platform; Gas Export
Platform; Canteen 1 Platform; Kairi 1 & 2 Platforms and Aripo Platform.
Within the eleven weeks of the project, the inspector / inspection comprised of:-
1 – Level III Nace Certified Coating Inspector.
Technical support services were provided to ensure that proper PFP was install and intact to prevent a fire
risk from breaching critical areas on platforms should there be a need for an emergency evacuation of
personnel’s on platforms.
Such critical areas are:-
Exposed fire water ring main supports and supporting structure.
Ensure blast wall is protecting living quarters and items behind the blast wall from fire to
facilitate a platform evacuation if made necessary.
Ensure PFP is on Accommodation Building; Electrical Building; Generator Control Room and
Compressor Control Room.
Ensure PFP is on ESD Valves, located on the pig receivers to allow for a minimum time period
of 10 minutes to permit the ESD Valves to close in an emergency.
23
COMPANY PROFILE
METHANEX TRINIDAD LIMITED
February 15th – 21th, In-Service Above Ground Storage Tanks Project
COUNTRY
Trinidad, W.I.
SCOPE OF WORK
Conduct AUT – Short Range Guided Wave Inspection on 2-off 177’ O.D. Pure Methanol; 2-off 116’
O.D. Pure Methanol Intermediate and 1-off 116’ O.D. Raw Methanol Storage Tanks Annular Rings
& Floor Plates.
Within the five days of the project, the inspectors / inspection comprised of:-
1 - Project Supervisor / Reliability Engineer.
1 – NDE / NDT Technical Assistance.
Storage Tanks bottom plate was inspected for any signs of minor, moderate and severe wall loss,with
interpretations in the form of Pits, Erosions and / or Stress Corrosions.
BARBADOS LIGHT & POWER COMPANY LIMITED
March 18th – 19th, In-Service Above Ground Storage Tanks Project
COUNTRY
Barbados, W.I.
SCOPE OF WORK
Conduct AUT – Short Range Guided Wave Inspection on 1-off 72’ O.D. Steam Station HFO and 1-
off 13’ O.D. Sludge Storage Tanks Annular Rings & Floor Plates.
Within the two days of the project, the inspectors / inspection comprised of:-
1 - Project Supervisor / Reliability Engineer.
1 – NDE / NDT Technical Assistance.
Storage Tanks bottom plate was inspected for any signs of minor, moderate and severe wall loss,with
interpretations in the form of Pits, Erosions and / or Stress Corrosions.
24
COMPANY PROFILE
BARBADOS LIGHT & POWER COMPANY LIMITED
May 7th – 28th, In-Service Welding Inspection on Process Piping Project
COUNTRY
Barbados, W.I.
SCOPE OF WORK
Conduct AUT – Phased-Array Welding Inspection on 5” O.D. Butt Weld Joints on Outlet Pipe from
S1’s West Boiler Feed Pump.
Within the project, the inspectors / inspection comprised of:-
1 - Project Supervisor / Reliability Engineer.
1 – NDE / NDT Level II Tech.
Welding was inspected using AUT Phased-Array on process piping to eliminate zero loss of on site
production; reduce overall project cost, duration and increase welding productivity while increasing safety.
SOL CARIBBEAN LTD (BARBADOS)
June 14th – August 30th, 8,000 BBL Storage Tank Construction Project for SOL EC LTD.
COUNTRY
St. Vincent, W.I.
SCOPE OF WORK
Client Representative for Overseeing all Inspection Activities During Construction and
Commissioning
Within the project, the inspector / inspection comprised of:-
1 – API-653 NDE / NDT Project Manager.
1 – Certified Welding Inspector (CWI).
1 – Level III Nace Certified Coating Inspector.
The NDE / NDT Project Manager responsibilities entails verifying all Inspection activities applicable to the
Inspection and Test Plan, Procedures, Codes and Standards of all Contractors on site.
This Includes :- Welding Inspections; Vacuum Box Testing; Pad Plate Leak Testing; Diesel Oil or Unseed
Oil Testing; Painting & Coating Inspections etc.
25
COMPANY PROFILE
NU-IRON TRINIDAD & TOBAGO
September 16th – October 4th, Turn-A-Round (TAR) Project
COUNTRY
Trinidad, W.I.
SCOPE OF WORK
Supplying of Inspection Professionals.
Within the three weeks of the project, the inspectors / inspections comprised of:-
1 - Piping Inspectors (API-570).
4 - Certified Welding Inspectors (CWI).
All provided technical services to support all welding activities (SMAW & FCAW) on the plant Reduction
Furnace Area Package 1 & 4 Bustle Line and Cricital Items Package.
26
COMPANY PROFILE
BHP BILLITON TRINIDAD & TOBAGO
January 13th – February 1st, Platforms Crane Inspection Project
COUNTRY
Trinidad, W.I.
SCOPE OF WORK
Conduct Inspection of all Off-Shore Box Boom and Lattice Boom Cranes on Central Processing
Platform; Gas Export Platform; Canteen 1 Platform; Kairi 1 & 2 Platforms and Aripo Platform.
Within the four weeks of the project, the inspector / inspection comprised of:-
1 – Certified Mobile Crane Inspector.
Technical support services were provided to carry-out detailed visual checks on BOOM, PEDESTAL &
other key STRUCTURAL ELEMENTS.
Such as:-
Boom Tip; Boom Welds; Swing Circle Assembly; Luffing Cylinder Attachment Points; Crane
Hook and Safety Latch; Vertical Support & Foundation; Safety Devices; Overhaul Ball & Hook;
Operator’s Cab & Station and Load Charts just to name a few.
27
COMPANY PROFILE
BHP BILLITON TRINIDAD & TOBAGO
March 1st – April 25th , Structural Platforms Project
COUNTRY
Trinidad, W.I.
SCOPE OF WORK
Conduct Level I Visual Inspection of all Critical 1 Structural Joints & Members on Central
Processing Platform; Gas Export Platform; Canteen 1 Platform; Kairi 1 & 2 Platforms and Aripo
Platform.
Within the eight weeks of the project, the inspector / inspection comprised of:-
1 – Level III Nace Certified Corrosion Technician.
Technical support services were provided to identify any existing cracks; signs of excessive corrosion;
bent, missing or damaged members; missing or damaged bolts; and any indications of obvious overloading,
design deficiencies and any operational usage that is inconsistent with the original design intent of the
installation at Heli-Deck; Main-Deck; Mezzanine-Deck; Production-Deck; Cellar-Deck and Working
Point (Jackets), both topsides and undersides.
28
COMPANY PROFILE BHP BILLITON TRINIDAD & TOBAGO
March 1st – April 25th, Passive Fire Protection Project
COUNTRY
Trinidad, W.I.
SCOPE OF WORK
Conduct Level III Passive Fire Protection (PFP) Visual Inspection on all Piping Supports; Blast
Walls; Buildings; and ESD Valves and Actuators on Central Processing Platform; Gas Export
Platform; Canteen 1 Platform; Kairi 1 & 2 Platforms and Aripo Platform.
Within the eight weeks of the project, the inspector / inspection comprised of:-
1 – Level III Nace Certified Coating Inspector.
Technical support services were provided to ensure that proper PFP was install and intact to prevent a fire
risk from breaching critical areas on platforms should there be a need for an emergency evacuation of
personnel’s on platforms.
Such critical areas are:-
Exposed fire water ring main supports and supporting structure.
Ensure blast wall is protecting living quarters and items behind the blast wall from fire to
facilitate a platform evacuation if made necessary.
Ensure PFP is on Accommodation Building; Electrical Building; Generator Control Room and
Compressor Control Room.
Ensure PFP is on ESD Valves, located on the pig receivers to allow for a minimum time period
of 10 minutes to permit the ESD Valves to close in an emergency.