Purchasing Process Heat Equipment 8 Step Project Timeline
Stelter & Brinck
Since 1956
1. Order Placement
• Order is placed•Business terms are confirmed•Process data is finalized
Stelter & Brinck
Since 1956
2. Drawings Submitted •Drawings and plans are given to customer for
approval
3. Approval• AutoCad drawings are submitted to customer for
approval
Stelter & Brinck
Since 1956
4. Manufacturing
• Approved designs are then built to meet the customers standards
Stelter & Brinck
Since 1956
5. In-House Test Firing • S&B can fire up to 30MM BTU/hr, fuel oil/natural
gas/propane testing• Ability to mimic overseas power with in house
generator• Testing firing includes an 81 point inspection
Stelter & Brinck
Since 1956
6. Electronic Manuals Issued
•Manuals include start-up/shut down procedures and a troubleshooting guide
7. Shipment • Equipment is delivered on schedule
Stelter & Brinck
Since 1956
8. Installation and Start-Up•Stelter & Brinck’s service technicians are able to install, start-up, and train machine operators
Stelter & Brinck
Since 1956
Aftermarket
• Field Service- Technicians keep the equipment operating at peak performance.
• Parts- Stelter & Brinck keep a wide variety of spare parts in stock.
Stelter & Brinck
Since 1956
Thank you!
Website: www.stelterbrinck.comTwitter: @stelterbrinckPhone: 1-513-367-9300
Check out S&B’s Blog Post:http://www.stelterbrinck.com/blog/looking-for-a-process-heat-equipment-vendor/