STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

Distributed Generation Renewable Energy

With the JouleBox® Hybrid Generators

Confidential Proprietary Material Presented by ECO-GEN Energy, Inc. © 2012 All Rights Reserved

Green Is Good AffordableAvailable 24/7/365 Reliable

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 2: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Board of Advisors&

Inventors

Woodrow W. Clark II MA3, PhDQualitative Economist

Dr. Clark was one of the contributing scientists to the work of the United Nations Intergovernmental Panel on Climate Change (UNIPCC) which as an organization was awarded the Nobel Peace Prize in December 2007.

DR. WILLIAM A. BURKE AQMD Governing Board Chairman

Dr. Burke has served as Chairman of the California Air Quality Management District and during his tenure the quality of air in CA has improved over 600%.

Glen Roberts John WalkerDepartment of Commerce Co-Founder Energy StarSpecialist in Import/Export

InventorTeamThe JouleBox® Inventor Team is pleased to work with the Advisor Board

Page 3: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

ECO-GEN Energy, Inc. and our financial partners are prepared to enter into Long Term 20 year PPA’s to provide 100% clean, green energy.

We will provide ‘Firm Power’ 24/7/365 using a hybrid system of solar, wind and lithium ion batteries.

Renewable Energy is Needed Now!

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 4: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

Traditional EnergyExpensive, Pollution, Not Sustainable

Fossil Fuels Nuclear Power Plants Renewables

Coal, Natural Gas, San Onofre – Shut down produce 4-8 Hours per dayAll fossil fuels have Fukushima – problems solar, wind, hydrofuel costs and Environmental damage expensive Carbon footprint that transmission costsis not sustainable.

Now there is a Better Way

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 5: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

Traditional Renewable EnergyIntermittent Power 4-12 Hours per day – AT BEST

Solar panels Concentrated Solar Wind

Not enough room Large land footprint 8 Hours per daywhere the power Environmental damage Environmental damage

is needed. High Transmission costs High Transmission costs4-6 Hours per day

Now there is a Better Way

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 6: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

Produces Clean, Green Energy 24/7/365 using solar, wind and lithium ion batteries.

5 Proven Technologies have been combined in one box to generate electricity.

JouleBox™

Hybrid Generator

60 kW

Annual kWh produced 525,600

Annual kWh’s are estimated as unit size (60 kW) X 24 hours per day X 365 days in year. Actual production may vary slightly (+ 5%).

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 7: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

The JouleBox™Hybrid Generator

Understanding The Technology 5 Proven Technologies have been combined to generate electricity.

1. Solar Panels and DC Generators to constantly charge the batteries.2. Lithium Ion Battery Brick with patented Serial and Parallel wiring to Charge and Discharge. By

not using the 15,000 charge/discharge life cycles, the batteries will last 20 years plus. 3. Vortex Reduction Chamber (VRC). VRC turns the Power Turbine. The Power Turbine turns an AC

Generator.4. High Efficiency Speed Control DC Motors and DC Blower Motors and controllers for greater

durability and reliability. We use electronic controllers to maximize efficiency. Our motors use less than 1/3rd the energy of conventional motors. Recycle back EMF.

5. Power Q – controls the power quality output to sync with the grid and maintain proper harmonics. Clean sine waves, stable Hz and harmonics, no power surges.

We have protected the Intellectual Property (IP) with layers of use patents, copyrights and other IP. The software is burned into the chips which eliminates the risk of reverse engineering. All units are GPS equipped with licensing agreements for installation at a specified location. Location modification is allowed under the licensing agreement with notification.

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 8: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

Installations

By Installing next to the Substations you avoid Transmission Costs. We work with the Grid to stabilize existing energy generation or we can work off-Grid.

New facility

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 9: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

Distributed GenerationECO-GEN and our financial partners are prepared to invest and build

Micro Grid Distributed Generation Power Facilities

Next to the sub-stations, Where the energy is needed! Clusters of 60 kW units – from 3 MW to 50 MW plants or

more Makes the Grid Safer and more Secure

Why pay high transmission costs?Why suffer losses in transmission?

Scalable in sizeDependable “Firm Power”

We will lease/buy “Right-of-Way” land under transmission lines next to the sub-station where power is needed.

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 10: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

Installations Next to Substations

By determining the capacity of the Substation we can build multiple installations in varying sizes. This strengthens the overall Grid. The above shows 82.08 MW total.

New JouleBox

facility6.48 MW

New JouleBox

facility50.4 MW

New JouleBox

facility2.88 MW

New JouleBox

facility10.8 MW

New JouleBox

facility7.2 MW

New JouleBox

facility4.32 MW

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 11: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

Installations

All JouleBox ® Units are installed inside a safe and secure pre-fab building.

Can be sized from 2.88 MW building to multiple buildings with 50.4 MW EACH. Install next to Sub-station where energy is needed (must be in groups of 12 JouleBoxes®).

24/7/365 Satellite communications monitoring.

Feet 17 10.00 10.00 10.00 10.00 10.00 10.00 10.00 4 30.00

Unit 1/2 10' X 7.5'

Unit 3/4 10' X 7.5'

Unit 5/6 10' X 7.5'

Unit 7/8 10' X 7.5'

Units 9/10 10' X 7.5'

Unit 11/12

10' X 7.5'

Unit 13/14

10' X 7.5'

15 -16 17-18 19-20Switchgear 12

JouleBoxes Top/Bottom

21-22 23-24 25-26

Front Main Access Door

27-28 29-30 31-32 33-34 35-36 37-38 39-40

41-42 43-44 45-46Switchgear 12

JouleBoxes Top/Bottom

47-48 49-50

Satellite Pad 4'X4'

Mega Watts Units Building S.F. Solar Panels

Shop 23.5' X 32' 12' Door Storage

11.5' x 32' 12' Door

3 50 8,636 200 Office Note: Stair ways on each end nextTotal Land for Security 21,276 60 x 120

51,000 Watts

19'X 25' All sides must have emergency man doors

Height 22' IT 8'X30' NOTE: Air-lock front door

Posts Cat Walk100 2

3 MW Project

1 Over Head

Access Door &

Emergency Exit

4' Maintenance and Catwalk (Bus is run under Catwalk)

17' Access

20' Access for Installation and Safety Code

4' Maintenance and Catwalk (Bus is run under Catwalk)

20' Access for Installation and Safety Code

20' Access for Installation and Safety Code

Racking25

10,000lb. Capacity 78'

Height 8'"

Electrical Room

Break Room

Office &

Security19' X 21'

Air-lock

IT Room 10' X 17'

Storage Room9' X 21'

Shop 23.5' X 24' 12' Door

Bus to Switchgear

Toilet

Installations are Modular: Building, Racking, Sound & Solar Module Electrical Intertie & Protection Module Communications, IT & Security Module

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 12: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

Building, Racking,Sound & Solar

Module #1

Can be sized from 2.88 MW building to multiple buildings with 50.4 MW EACH. Install next to Sub-station where energy is needed (must be in groups of 12 JouleBoxes®).

Feet 17 10.00 10.00 10.00 10.00 10.00 10.00 10.00 4 30.00

Unit 1/2 10' X 7.5'

Unit 3/4 10' X 7.5'

Unit 5/6 10' X 7.5'

Unit 7/8 10' X 7.5'

Units 9/10 10' X 7.5'

Unit 11/12

10' X 7.5'

Unit 13/14

10' X 7.5'

15 -16 17-18 19-20Switchgear 12

JouleBoxes Top/Bottom

21-22 23-24 25-26

Front Main Access Door

27-28 29-30 31-32 33-34 35-36 37-38 39-40

41-42 43-44 45-46Switchgear 12

JouleBoxes Top/Bottom

47-48 49-50

Satellite Pad 4'X4'

Mega Watts Units Building S.F. Solar Panels

Shop 23.5' X 32' 12' Door Storage

11.5' x 32' 12' Door

3 50 8,636 200 Office Note: Stair ways on each end nextTotal Land for Security 21,276 60 x 120

51,000 Watts

19'X 25' All sides must have emergency man doors

Height 22' IT 8'X30' NOTE: Air-lock front door

Posts Cat Walk100 2

3 MW Project

1 Over Head

Access Door &

Emergency Exit

4' Maintenance and Catwalk (Bus is run under Catwalk)

17' Access

20' Access for Installation and Safety Code

4' Maintenance and Catwalk (Bus is run under Catwalk)

20' Access for Installation and Safety Code

20' Access for Installation and Safety Code

Racking25

10,000lb. Capacity 78'

Height 8'"

Electrical Room

Break Room

Office &

Security19' X 21'

Air-lock

IT Room 10' X 17'

Storage Room9' X 21'

Shop 23.5' X 24' 12' Door

Bus to Switchgear

Toilet

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 13: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

Electrical Intertie & Grid Protection Module #2

G GG G G G G G GG G G

LV Switchboard (UL891)Collector Bus and Master Breaker

Aggregated GeneratorMaster Breaker

12 Generators; 720kW; 480V

60kW480V

60kW480V

60kW480V

60kW480V

60kW480V

60kW480V

60kW480V

60kW480V

60kW480V

60kW480V

60kW480V

60kW480V

4 X 12 Generators; 2,880kW; 480V

LV Switchboard (UL891)Collector Bus and Master Breaker

To Other LVSBs with 12 GeneratorsTo Other LVSB with 12 Generators

To LV/MV Step-Up Transformer

DG Interconnection Relay

3Y

3Y

1

DG Interconnection Relay

3Y

3Y

1

12 Units are Combined

Power Q (Power Quality Box) regulates sine waves, harmonics, voltage spikes

Woodward EasYgenBeckwith Intertie Protection

Designed by a Senior Member, IEEE• IEEE Power Systems Relaying Committee (PSRC), Main Committee• IEEE PSRC Rotating Machinery Protection Subcommittee, Chair

Emeritus• IEEE PSRC Rotating Machinery Protection Subcommittee, Committee

Member

ABB Switchgear

We make the Grid stronger

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 14: Joule box   distributed generation 5 en

Power Plant Communications, IT & Security Module

#3

Generator Control & Monitoring of all units and component parts 24/7

IT & Satellite Hub

Facility Access Control

Uplink to Control Center

Site-wide Video SurveillanceNetwork

Provided By

Cinetcomm’s globalnetworks provide allback office support,systems monitoringand control via satellitecommunications forECO-GEN Energy’soperations.

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 15: Joule box   distributed generation 5 en

Generator Control & Monitoring of all units and component parts 24/7

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 16: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

PPAPower Purchase Agreements

Advantages No Capital Cost to install or maintain equipment. 100% turn key operation. Firm Power, 24/7/365 Satellite Monitoring for safety and guaranteed production at no additional cost. Maintenance Free – All PPAs include maintenance and repairs. High Quality Power, Clean electricity, stable Hz, synced sine waves, and harmonics, no power surges. No pollution – Clean, Green Electricity! No Fuel Costs. Lower per kWh costs than all other forms of energy generation . Fixed 20 yr. rate per kWh of electricity produced. Rates from US$0.12 - $0.32 per kWh depending on credit, sovereign guarantee and escalator clauses. Also Switchgear and transformer

requirements Scalable. 3 MW to multiple 50 MW Buildings. Energy is produced next to sub-stations - where the energy is needed! All PPAs are owned by a local Special Purpose Entity (SPE). ECO-GEN retains a 25% interest in all SPEs to compensate for IP.

Reliable Energy Produces Jobs Faster Than Anything Else. Factories Can Operate 24/7

The Power Q in the JouleBox™ controls harmonics, sine waves, Hz, voltage, power surges and auto cut-off for safety. Units

can be satellite monitored remotely.

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 17: Joule box   distributed generation 5 en

Pricing of PPAUS$0.12 – US$0.25

Many factors are considered to determine a PPA rate: Credit Risk – Sovereign Guarantee Property Insurance Political Risk Insurance Currency Risk Hedging (if applicable) Production Insurance Liability insurance Hurricane, flooding and earthquake insurance (where

applicable) Collateral provided Debt Coverage Ratio Taxes

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 18: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

Good For Country

Local Construction Jobs Local Sourcing of Building Material The Owner of the Facility is a local SPE Jobs in the Facility 24/7/365

Management Engineers Maintenance Security

Secure, Reliable, Green ENERGY CREATES JOBS More Anything Else!

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 19: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

Good For Country

NOTHING CREATES MORE JOBSthan

Secure, Reliable, Green ENERGY!

Factories Can Hire More People People Create New Businesses

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 20: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

ECO-GEN commits to give 10% of all profitsBack to the CommunitiesOf the Projects We Build

Thank You

ECO-GEN’s Charitable Commitment

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015

Page 21: Joule box   distributed generation 5 en

STRATEGICACTIONS PLAN

Concepts for the Future and for the Present

72,000 CFM

ContactM Paul Weis

[email protected]

Green Energy

© ECO-GEN Energy, Inc. 3-1-2012 under permission of the Bellagio Trust. All Rights Reserved 2015