ADVANCED HIGHLAND VALLEY COPPER PROJECT

Getty Copper Inc.1000 Austin Avenue

Coquitlam, British ColumbiaCanada V3K 3P1

Tel: (604) 931-3231Fax: (604) 931-2814

E-mail: [email protected] 12, 2012

Page 3: Getty Copper Powerpoint Presentation  September 12, 2012

This presentation includes certain statements that may be deemed "forward-looking statements". All statements in this presentation, other than statements of historical facts, especially those that address the need for definitive agreements to be negotiated and executed, and estimated resource quantities, grades are forward-looking statements because they are based on future events or made on the basis of estimation from limited information such as a fixed number of number of drill holes and metallurgical studies. The Company does not have reserves for US reporting standards and the estimate of reserves for Canadian reporting purposes is conjectural being based only on a pre-feasibility study which uses broadly defined cost and production estimates. The study is available at www.sedar.com. Although diamond drill hole core provides valuable information about the size, shape and geology of an exploration project, there will always remain a significant degree of uncertainty in connection with these valuation factors until a deposit has been extensively drilled on closely spaced centers which has occurred only in specific areas on the Getty Project. Although the Company believes the expectations expressed in its forward-looking statements are based on reasonable assumptions, such statements should not be in any way construed as guarantees of the ultimate size, quality or commercial feasibility of the Getty Project or of the Company's future performance. Subsequent results and developments may differ materially from those postulated in the estimates and forward-looking statements. Other factors that could cause the Company's actual results and performance to differ materially from those in forward-looking statements include adverse market prices for metals, the conclusions of detailed feasibility and technical analyses, lower than expected grades and quantities of resources, mining rates and metal recovery rates and the fact that necessary capital may not be available to the Company on terms acceptable to it or at all. The need for compliance with extensive environmental and socio-economic rules and practices and the requirement for the Company to obtain government permitting can cause a delay or even abandonment of a mineral project. The Company is subject to the specific risks inherent in the mining business as well as general economic and business conditions. For more information on the Company, Investors should review the Company's annual Form 20-F filing with the United States Securities Commission and its home jurisdiction filings that are available at www.sedar.com. The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this presentation.

Note to U.S. Investors concerning estimates of Measured and Indicated Resources. This section uses the terms “measured” and “indicated resources”. We caution U.S. investors that while those terms are recognized and required by Canadian Securities Administrators pursuant to National Instrument 43 101, the U.S. Securities and Exchange ‑Commission does not recognize them. U.S. investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be converted into reserves.

Note to U.S. Investors concerning estimates of Inferred Resources. This section uses the term “inferred resources”. We caution U.S. investors that while this term is recognized and required by Canadian Securities Administrators pursuant to National Instrument 43 101, the U.S. Securities and Exchange Commission does not recognize it. “Inferred ‑resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian Securities Administration rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or pre feasibility studies. U.S. investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally ‑minable.

LEGAL DISCLAIMER

Page 4: Getty Copper Powerpoint Presentation  September 12, 2012

LOOKING NORTHWEST OVER THE HIGHLAND VALLEY MINING AREA

Page 5: Getty Copper Powerpoint Presentation  September 12, 2012

COMPANY STRATEGY

• Formed in 1993, Getty Copper Inc. is a Canadian mineral exploration and development company committed to increasing shareholder value by continued exploration and development of it’s 104 square mile Highland Valley property.

• Getty Copper’s main objective is to place in production its Highland Valley open-pittable porphyry copper and molybdenum deposits.

• In addition to advancing the Highland Valley Project, Getty Copper Inc. is also continually evaluating other mineral exploration and development projects in Canada and worldwide.

Page 6: Getty Copper Powerpoint Presentation  September 12, 2012

Porphyry Copper ProjectHighland Valley, British Columbia, Canada

Filed with BCSC and SEDAR June 2010

NI 43-101 PRE FEASIBILITY STUDY

Dr. Corby Anderson, QP CEng FIMMM FIChemE A qualified person as determined by NI 43-101 and the President of Getty Copper Inc.

has reviewed and approved the scientific and technical information in the presentation.

Page 7: Getty Copper Powerpoint Presentation  September 12, 2012

• Positive Independent NI 43-101 Pre-Feasibility Study Completed• 420 Diamond Drill Holes Totaling 74,000 Meters (242,782 Feet) on Getty North and South

Deposits Combined• Large Property – 269 Square Kilometers (104 Square Miles)• Recent TITAN 24 QUANTEC Geophysical Survey Completed Confirming Deposits and Noting

High Priority Exploration Targets• $ 22 Million CDN in Financings to Date• 23 Square Kilometers of Geological Mapping• Prominent Geophysical Anomalies Found in Getty West Zone, Glossie Zone, North Valley

Zone and East Zone

ADVANCED HIGHLAND VALLEY PROJECT HIGHLIGHTS

Page 8: Getty Copper Powerpoint Presentation  September 12, 2012

• 8,761 Geochemical Samples Analyzed Over 296 Line

Kilometers (185 Miles) • 296 Line Kilometers Geophysical IP Surveys• 227 Line Kilometers (142 Miles) Geophysical Magnetometer Surveys• 1572 Meters (5158 Feet) of Surface Trenching on Getty South

Deposit• 45 Meter (150 Feet) Deep, 2 Compartment Development

Shaft Sunk in Getty South Deposit• 1768 Meters (5,800 Feet) of Underground Development in the Getty South Deposit

ADVANCED HIGHLAND VALLEY PROJECT HIGHLIGHTS

Page 9: Getty Copper Powerpoint Presentation  September 12, 2012

• Good Potential For Increased Gold, Silver and Molybdenum By Product Credits

• Metallurgical Studies Completed Utilizing Industrially Proven Concentrate Flotation and Hydrometallurgical Concentrate Treatment Technologies

• NI 43-101 PFS Engineering Design Incorporates Extra Capacity For Production of Copper Cathode and Molybdenum Trioxide From Treatment of Outside Custom Concentrates

• Initial Environmental Studies Completed

• Hydrometric Study Completed on Streams and Creeks

ADVANCED HIGHLAND VALLEY PROJECT HIGHLIGHTS

Page 10: Getty Copper Powerpoint Presentation  September 12, 2012

GOOD POTENTIAL FOR INCREASED GETTY COPPER EQUIVALENT ORE GRADE

Independent QP Mr. Todd Fayram Modeled the Potential Value of the Additional Gold, Silver, and Molybdenum By-products Over the Current Projected Getty PFS Mine Life of 17 Years.

For Example, Based On A Prior Study , The Concentrate Grade May Amount To The Potential Recovery Of Approximately 7,200 Ounces Per Annum Of Gold And 86,000 Ounces Of Silver Per Annum, But Further Work Needs To Be Carried Out To Confirm These Possible Figures.

In Addition, A Historical Diamond Drill Hole Program And Study By Canex / Placer Development Limited Determined That, “ The Overall Average MoS2 Percentage In The Rock Mass is 0.0338%. The Silver Content Averages Approximately 0.18 Oz/Ton.”

Page 11: Getty Copper Powerpoint Presentation  September 12, 2012

• Property Located in an Active Major Producing Mining District With Significant Well Defined Copper Resources

• Over 80% of the Combined Indicated Resources are Classified as Probable Reserves • Property is Large and has Many Clearly Delineated IP Anomalies and Exploration

Target Resource and Reserve Expansion Potentials.• Located in a Politically Stable Region With Extensive Infrastructure Energy and

Transportation Available• Utilizes Industrially Proven Metallurgical Technology With Additional Custom

Designed Concentrate Treatment Capacity.

AN ADVANCED HIGHLAND VALLEY COPPER PROJECT !

GETTY ADVANCED COPPER PROJECT SUMMARY

Page 12: Getty Copper Powerpoint Presentation  September 12, 2012

LOCATION & INFRASTRUCTURE • Proven Porphyry Copper & Molybdenum Project

• Located in the Highland Valley Approximately 330km (205 miles) Northeast of Vancouver, B.C., Canada

• Getty’s Property is Adjacent to Canada’s Largest Producing Base Metal Copper Mine. Teck’s Highland Valley Copper Project has 637 Million Tonnes of Reserves Grading 0.29% Copper and 0.008% Molybdenum, as Per Teck’s Website on December 31, 2011.

• Excellent Infrastructure And Politically Stable Location

• Water, Power, Gas, Modern Highways with Rail and Air in Kamloops

• Sea Port of Vancouver Close By; 5th Largest in North America

• Operating Mining District With Trained Workforce

Page 13: Getty Copper Powerpoint Presentation  September 12, 2012

GETTY HAS SUBSTANTIAL RESOURCE GROWTH POTENTIAL

• Located in the Heart of Canada’s Proven and Producing Copper District.

• Probable Reserves Confirmed Under Pre- Feasibility Study (PFS) With Immediate Upside Potential in Both the Getty North and Getty South Deposits.

• Substantial IP Anomalies Confirmed in North Valley Zone, Getty West Zone, Bose Hill East Zone and Glossie Zone.

Page 14: Getty Copper Powerpoint Presentation  September 12, 2012

LOCATION OF GETTY COPPER PROPERTY IN RELATION TO TECK’S OPERATING HIGHLAND VALLEY COPPER MINE

Page 15: Getty Copper Powerpoint Presentation  September 12, 2012

EXPLORATION DEVELOPMENT SUMMARY TO DATE

GETTY NORTH DEPOSIT

• 302 Diamond Drill Holes Totalling 55,007Meters (180,469 Feet) of drilling.

• Diamond Drill Holes to Depths of 462 Meters (1516 Feet) and 369 Meters (1211 Feet) Were Stopped in Mineralization.

• 23 km (14 miles) Induced Polarization Survey (I.P.) and 16 Km of Geochemical Survey.

• Titan 24 QUANTEC DCIP Survey Completed

• Preliminary Pit Design by Placer Developments and in NI 43-101 PFS.

GETTY SOUTH DEPOSIT

(50% Ownership With In Place Royalty Agreement)

• 45 Meter (150 Feet) Deep, 2 Compartment Development Shaft.

• 1768 Meters (5,800 feet) Underground Development.

• 118 Diamond Drill Holes Totalling 19,003 Meters (62,345 Feet) of Drilling.

• 114 Kilometers (71 Miles) of IP Surveys.

• 1572 Meters (5,158 Feet) of Surface Trenching Confirming Copper Mineralization.

• 20 Km (12 Miles) of Geochemical Soil Sampling

• Titan 24 QUANTEC DCIP Survey Completed

• Preliminary Pit Design in 43-101 PFS.

Page 16: Getty Copper Powerpoint Presentation  September 12, 2012

• Dr. Corby G. Anderson, QP CEng FIMMM FIChemE, COO & President• Donald R. Willoughby, FCA, CFO, Director• Bernhard Zinkhofer, CA, LL.B, Corporate Secretary• John B. Lepinski, Managing Director• Edward Leung, CGA, Director• Robert H. Peterson, MBA, BSc Engineering, Director• Dennis Milburn, CA, Geologist, Director

MANAGEMENT & DIRECTORS

Page 17: Getty Copper Powerpoint Presentation  September 12, 2012

GETTY CAPITAL STRUCTURE

• Symbol: TSX.V: GTC• Shares Issued: 98,292,537• Options: 3,575,000• Warrants: Nil• Fully Diluted Shares: 101,867,537

Page 18: Getty Copper Powerpoint Presentation  September 12, 2012

Porphyry Copper ProjectHighland Valley, British Columbia, Canada

CIM Probable Mineral Reserves (50% Getty South Ownership With In Place Royalty Agreement)

Probable Reserves Grade Deposit (Millions of Tonnes) Cu, % Mo, %

North 49.691 0.397 0.005 South 36.870 0.405 TBD

Total 86.561 0.400 ---

Approximately 760,000,000 Pounds of Copper Reserves!

GETTY COPPER’S RESERVES

Page 19: Getty Copper Powerpoint Presentation  September 12, 2012

Porphyry Copper ProjectHighland Valley, British Columbia, Canada

CIM Indicated Resource Estimate (50% Getty South Ownership With In Place Royalty Agreement)

Indicated Resources Grade Deposit (Millions of Tonnes) Cu, % Mo, %

North 69.258 0.370 0.005 South 45.148 0.377 TBD

Total 114.406 0.373 ---

Approximately 940,000,000 Pounds of Indicated Copper Resources !(Over 75% of Indicated Copper Resources are Probable Reserves)

INDICATED RESOURCES

Page 20: Getty Copper Powerpoint Presentation  September 12, 2012

Porphyry Copper ProjectHighland Valley, British Columbia, Canada

Inferred Resource Estimate (50% Getty South Ownership With In Place Royalty Agreement)

Inferred Resources Grade Deposit (Millions of Tonnes) Cu, % Mo, %

North 18.166 0.271 0.005 South 23.593 0.278 TBD

Total 41.759 0.275 ---

Approximately 250,000,000 Pounds of Inferred Copper Resources !

INFERRED RESOURCES

Page 21: Getty Copper Powerpoint Presentation  September 12, 2012

LOOKING NORTH FROM TECK’S HIGHLAND VALLEY COPPER MINE TOWARDS GETTY COPPER PROPERTY

Page 22: Getty Copper Powerpoint Presentation  September 12, 2012

• 49 Million Tonnes of Probable Reserves Averaging 0.40% Cu and 0.005% Mo • 69 Million Tonnes of Indicated Resources Averaging 0.37% Cu• 18 Million Tonnes of Inferred Resources Averaging 0.27% Cu• 23 Km (14 Miles) Induced Polarization Survey (I.P.) and 16 Km of Geochemical Survey • 302 Drill Holes Totaling 55,007 M (180,469 Ft) • Titan 24 Quantec DCIP and MT Survey• Detailed Geological Mapping of Deposit and Surrounding Areas• Computerized Resource Estimation and Projected Initial Pit Design

GETTY NORTH DEPOSIT

Page 23: Getty Copper Powerpoint Presentation  September 12, 2012

GETTY NORTH DEPOSIT MODEL

GETTY NORTH DEPOSIT MODEL WITH INITIAL OUTLINE VIEW LOOKING SOUTHWEST

GETTY NORTH DEPOSIT MODEL WITH INITIAL OUTLINE VIEW LOOKING SOUTH

GETTY NORTH DEPOSIT

Page 24: Getty Copper Powerpoint Presentation  September 12, 2012

GETTY NORTH DEPOSIT CROSS SECTION 1360 SOUTHEAST

Page 25: Getty Copper Powerpoint Presentation  September 12, 2012

GETTY NORTH DEPOSIT SECTION 1360 SOUTHEAST

Page 26: Getty Copper Powerpoint Presentation  September 12, 2012

GETTY NORTH DEPOSIT SECTION 1390 SOUTHEAST

Page 27: Getty Copper Powerpoint Presentation  September 12, 2012

GETTY NORTH DEPOSIT SECTION 1450 EAST

Page 28: Getty Copper Powerpoint Presentation  September 12, 2012

(50% Ownership With Royalty Agreement In Place)

• 36 Million Tonnes of Probable Reserves Averaging 0.40% Cu • 45 Million Tonnes of Indicated Resources Averaging 0.38% Cu • 23.5 Million Tonnes of Inferred Resources Averaging 0.28% Cu • 118 Drill Holes Totaling 19,003 M (62,345 Ft) • Titan 24 Quantec DCIP Survey • 19 Km (12 Miles ) of I.P. and 13 Km (8 Miles) of Magnetometer Surveys • 20 Km (12 Miles) of Geochemical Soil Sampling• 1572 M (5,158 Ft) of Surface Trenching, Outlined Extensive Copper Mineralization • 45 M (150 Ft) Deep, 2 Compartment Development Shaft Sunk• 1768 M (5,800 Ft) of Underground Development

GETTY SOUTH DEPOSIT

Page 29: Getty Copper Powerpoint Presentation  September 12, 2012

GETTY SOUTH DEPOSIT TRENCHES

AERIAL VIEW

GROUND VIEW

Page 30: Getty Copper Powerpoint Presentation  September 12, 2012

GETTY SOUTH DEPOSIT TRENCHES

Page 31: Getty Copper Powerpoint Presentation  September 12, 2012

Porphyry Copper ProjectHighland Valley, British Columbia, Canada

• 0.40 % Cu – 80 % Sulfide and 20 % Oxide Mineralogy

• Potential By-Products Mo, Au, Ag, and Sodium Sulfate

• 5 M Tonnes Ore Mined Per Annum For A 17 Year Project Life

• Open Pit Mine With 2.6 to 1 Stripping Ratio

• Bulk Cu/Mo Sulfide Flotation and Oxide Tailings Agitated Leach

• Getty Metallurgy is Analogous to and Based on the ASARCO Pima Mill, First Quantum Kansanshi Mill and BHP Billiton Olympic Dam Mill Industrial Operations

NI 43-101 PRE FEASIBILITY STUDY

Page 32: Getty Copper Powerpoint Presentation  September 12, 2012

Porphyry Copper ProjectHighland Valley, British Columbia, Canada

• Industrial Nitrogen Species Catalyzed Concentrate Pressure Oxidation Leach With Copper SX/EW Plant

• Industrial Copper Oxide Flotation Tailings Agitated Sulfuric Acid Leach

• 30,000 Tonnes Per Annum Copper Cathode Metal Design Production Capacity

• 1,125 Tonnes High Purity MoO3 Per Annum Design Production Capacity

• Potential By-Product Silver Via AgCl Precipitation

• Potential By-Product Gold Via Non Cyanide Alkaline Sulfide Hydrometallurgy

NI 43-101 PRE FEASIBILITY STUDY HYDROMETALLURGY

Page 33: Getty Copper Powerpoint Presentation  September 12, 2012

Porphyry Copper ProjectHighland Valley, British Columbia, Canada

• By Product Sodium Sulfate

• CYTEC ACORGA Solvent Extraction & EW

• Electrodialysis Bipolar Membrane Salt Splitting for Caustic and Sulfuric Acid Internal Plant Reagent Generation

• EcoTec APU Sulfuric Acid Recovery System

• Selective Molybdenum Recovery With Activated Carbon or Ion Exchange Analogous to the Climax Molybdenum Colorado Industrial Plant

NI 43-101 PRE FEASIBILITY STUDY HYDROMETALLURGY

Page 34: Getty Copper Powerpoint Presentation  September 12, 2012

PROVEN INDUSTRIAL COPPER CATHODE & MOLYBDENUM OXIDE PRODUCTION TECHNOLOGY

Page 35: Getty Copper Powerpoint Presentation  September 12, 2012

Porphyry Copper ProjectHighland Valley, British Columbia, Canada

• 43-101 PFS CAPEX Estimate $ 385.2 M CDN

• 43-101 PFS OPEX $ 13.90 CDN per Tonne of Ore Mined and Processed to Copper Metal and Molybdenum Trioxide

• 43 101 PFS Pre Tax NPV = $ 145 M CDN @ 5% Discount and$ 2.99 USD/lb Cu price: IRR of 10.85 % (Without Cu and Mo Custom Concentrates or Potential Precious Metals Credits Included)

NI 43-101 PRE FEASIBILITY STUDY ECONOMICS

Page 36: Getty Copper Powerpoint Presentation  September 12, 2012

-30% -20% -10% 0% 10% 20% 30%

Copper Price $(257,560,371) $(114,602,746) $16,957,524 $144,997,907 $272,070,211 $390,266,658 $520,903,086

Capital $244,808,840 $208,118,673 $178,493,556 $144,997,907 $112,257,473 $75,567,306 $42,396,640

Operating Cost $412,912,444 $320,240,945 $232,484,203 $144,997,907 $55,573,657 $(35,799,706) $(131,425,783)

Molybdenum Price $123,869,133 $130,912,058 $137,954,982 $144,997,907 $152,040,832 $159,083,757 $162,697,713

Copper Grade $(257,246,730) $(114,394,602) $17,057,621 $144,997,907 $271,973,802 $390,076,818 $520,618,326

$(300)

$(200)

$(100)

$-

$100

$200

$300

$400

$500

$600

NPV

(MIL

LIO

NS)

-CN

D$

NI 43-101 PFS ECONOMIC SENSITIVITY ANALYSIS

Grade, OPEX and Cu Price Dominate Project NPV (5% Discount Rate Before Tax)

Page 37: Getty Copper Powerpoint Presentation  September 12, 2012

% OPEX OPEX NI 43-101 PFS NI 43-101 PFS REDUCTION CDN/Tonne NPV NAV/Share

0.0 % $ 13.90 $ 144,997,907 CDN$ $ 1.42 CDN$ - 10.0 % $ 12.51 $ 232,484,203 CDN$ $ 2.28 CDN$ - 20.0 % $ 11.12 $ 320,240,945 CDN$ $ 3.14 CDN$ - 30.0 % $ 9.73 $ 412,912,444 CDN$ $ 4.05 CDN$

(43-101 PFS NPV at a 5% discount rate before tax)

(and without full Mo, Au and Ag credits)

NI 43-101 PFS ECONOMIC SENSITIVITY ANALYSIS

Project Financial Sensitivity With Operating Cost Can Be Readily Lowered With Increased Production Rates

Page 38: Getty Copper Powerpoint Presentation  September 12, 2012

O’Hara’s Published Illustrative Industrial Open Pit Mine Operating Cost Data Versus Mining Rate Curve Economy of Scale - OPEX Drops 20 to 50 % By Raising Production

From 15,000 Tonnes Per Day to 30,000 Tonnes Per Day. This Is An Example Only And Does Not Necessarily Apply To Any Particular Project.

INDUSTRIAL ECONOMY OF SCALE POSITIVE EFFECT ON OPEX

Page 39: Getty Copper Powerpoint Presentation  September 12, 2012

The Proposed NI 43-101 PFS Getty Engineering Design Has An Extra 9,000 Annual Tonnes Of Cathode Copper And 1,000 Annual Tonnes Of Molybdenum Trioxide Hydrometallurgical Plant Capacity Available.

Assuming A Conservative 15% Smelting Return On Custom Concentrate Treatment And Using $2.99USD/Lb. Cu And $15.00 USD/Lb. MoO3 Prices This Represents About An Additional $13.5 M CDN Of Potential Annual Getty Profit (And Not Including Any Of The Contained Au And Ag Custom Concentrate Credits).

This Possibly Lowers Opex Nearly 20% By About $2.70 CDN Per Tonne To About $11.20 CDN Per Tonne And Raises The NI 43-101 PFS NPV By Approximately $180M. $320 M CDN.

CUSTOM CONCENTRATE TREATMENT POSITIVE EFFECT ON OPEX

Page 40: Getty Copper Powerpoint Presentation  September 12, 2012

Design-Expert® SoftwareOriginal ScaleMo Recovery, %

84.25

10.24

X1 = A: Grind TimeX2 = D: Temp

Actual FactorsB: Solids = 10C: Initial Ac idity = 25.00E: Reaction Time = 90

0.00

2.50

5.00

7.50

10.00

130.00

135.00

140.00

145.00

150.00

12.0

32.0

52.0

72.0

92.0

M

o R

ecov

ery,

%

A: Grind T ime D: Temp

Design-Expert® SoftwareOriginal ScaleRe Recovery, %

87.92

0

X1 = E: Reaction TimeX2 = B: Solids

Actual FactorsA: Grind Time = 10.00C: Initial Acidity = 75.00D: Temp = 150.00

30.00

45.00

60.00

75.00

90.00

10.00

20.00

30.00

40.00

50.00

26.00

41.50

57.00

72.50

88.00

R

e R

ec

ove

ry,

%

E: Reaction Time B: Solids

Design-Expert® SoftwareOriginal ScaleCu Recovery, %

97.85

22.6

X1 = E: Reaction TimeX2 = D: Temp

Actual FactorsA: Grind Time = 10B: Solids = 10C: Initial Acidity = 25

30

45

60

75

90

130

135

140

145

150

32.0

49.5

67.0

84.5

102.0

C

u R

ec

ove

ry,

%

E: Reaction T ime D: Temp

Outside Custom Concentrate NSC POXHydrometallurgical Confirmatory Testing

Custom Concentrate Grade Mo, % Cu, % Re, % Fe, % TS, %34.2 4.3 0.181 3.78 24.3

Optimized Copper Recovery Optimized Rhenium Recovery Optimized Molybdenum Recovery

EXAMPLE OF CUSTOM CONCENTRATE TREATMENT POSITIVE EFFECT ON OPEX

Page 41: Getty Copper Powerpoint Presentation  September 12, 2012

GOOD POTENTIAL FOR INCREASED HIGHLAND VALLEY COPPER EQUIVALENT ORE GRADE

Bethlehem Mine 1963-1982 Production

96,324,510 Tonnes of ore mined producing; 398,112 Tonnes (877,687,923 lbs.) of Copper 99,827 Kgs (3,209,509 tr oz.) of Silver 1,280 Kgs (41,148 tr oz.) of Gold 851 Tonnes (1,876,239 lbs.) of Molybdenum

The adjacent Bethlehem Mine, in production from 1963 until 1982, annually produced about 5 million tonnes of ore (i.e. Getty’s NI 43-101 PFS mining rate) containing 1.04 g/T Ag, 0.013 g/T Au, 0.009% Mo and 0.41% Cu per tonne.

This is evidence of the known occurrence, quantity and recoverability of additional by-product revenue metals currently present in Highland Valley Copper’s ores.

Page 42: Getty Copper Powerpoint Presentation  September 12, 2012

DEPTH POTENTIAL FOR INCREASED GETTY COPPER EQUIVALENT GRADE AND RESOURCE TONNAGE

PLACER’S HISTORICAL DIAMOND DRILL PROGRAM DETERMINED THAT THE BY PRODUCT MOLYBDENUM AND SILVER WERE REPORTED AS FOLLOWS IN THE GETTY NORTH DEPOSIT

“THE OVERALL AVERAGE MoS2 PERCENTAGE IN THE ROCK MASS IS 0.0338%. THE SILVER CONTENT AVERAGES APPROXIMATELY 0.18 oz./TON.”

Page 43: Getty Copper Powerpoint Presentation  September 12, 2012

POTENTIAL FOR INCREASED GETTY COPPER EQUIVALENT GRADE AND RESOURCE TONNAGE

This is a historical estimate and while indicative of the presence of mineralization of potential value, a qualified person has not done sufficient work to classify the historical estimate as current mineral resources or mineral reserves; and the issuer is not treating the historical estimate as current mineral resources or mineral reserves

Historically, in 1965, CANEX (Placer Development Limited) diamond drilled the Getty North Deposit to a depth of 1516 feet. The Placer diamond drill program confirmed good copper mineralization and calculated an arithmetic average from all the composite assays of an additional 0.18 Troy oz/Ton Ag and 0.0338% MoS2 values. That led to their historical estimate of an 0.7% to 0.9 % Copper Equivalent grade of 20 to 60 million tons of estimated sulfide resource along with an equal or greater amount of heap leachable resources in what is now the Getty North Deposit.

Page 44: Getty Copper Powerpoint Presentation  September 12, 2012

Dr. Morris Beattie P. Eng concluded in his 1997 Independent Flotation Testing of a Composite of the Getty North Deposit Samples, produced a Very Good Recovery of Copper Bulk Concentrates that Assayed With Individual Grades as High as:

39.0 % Copper2.97 g/T Gold

57.80 g/T Silver 0.982 % Molybdenum

This is Evidence of the Occurrence, Possible Quantity and Recoverability of These Additional By-product Revenue Metals Currently Present in the Getty ores. None of This Potential Additional Revenue is Accounted for in the Current NI 43-101 Pre Feasibility Study.

GOOD POTENTIAL FOR INCREASED GETTY COPPER EQUIVALENT ORE GRADE

Page 45: Getty Copper Powerpoint Presentation  September 12, 2012

Project Financial Sensitivity With Copper PriceLME Price Is $ 3.72 USD/lb Cu On 1/17/12

NI 43-101 PFS NI 43-101 PFS Cu Price, USD/lb NPV NAV/Share

$ 2.99 $ 144,997,907 CDN$ $ 1.42 CDN$ $ 3.29 $ 272,070,211 CDN$ $ 2.67 CDN$ $ 3.59 $ 390,266,658 CDN$ $ 3.83 CDN$ $ 3.89 $ 520,903,086 CDN$ $ 5.11 CDN$ $ 4.19 $ 645,000,000 CDN$ $ 6.33 CDN$

(43-101 PFS NPV at a 5% discount rate before tax) (And without Mo, Au and Ag potential by-product credits.)

NI 43-101 PFS ECONOMIC SENSITIVITY ANALYSIS.

Page 46: Getty Copper Powerpoint Presentation  September 12, 2012

• Copper price is a key economic driver A copper price of $ 2.99 USD/lb used in NI 43-101 PFS economics.

• Grade of copper and molybdenum is a key economic driver and potential gold and silver by-product credits would have the effect of increasing a copper equivalent grade. Possible custom concentrate treatment may also assist in project optimization

• Operating cost per tonne is a key economic driver Potentially Raising mine production from 15 K tonnes ore per day along with custom concentrate treatment potentially lowers operating cost per O’Hara’s independently published copper cost curves.

PROJECT ECONOMIC OPTIMZATION SUMMARY

Page 47: Getty Copper Powerpoint Presentation  September 12, 2012

• Getty Highland Valley Advanced Copper Project superimposed satellite image by Peter Walcott & Associates.

• This geophysical and resource data update now denotes a large Eastern anomaly between the Getty North and Getty South deposits.

• The known Getty West anomaly is also depicted.

SUBSTANTIAL RESOURCE GROWTH POTENTIAL

Page 48: Getty Copper Powerpoint Presentation  September 12, 2012

GETTY GEOPHYSICAL SURVEYS

Page 49: Getty Copper Powerpoint Presentation  September 12, 2012

TITAN 24 QUANTEC GEOPHYSICAL SURVEY

Page 50: Getty Copper Powerpoint Presentation  September 12, 2012

TITAN 24 QUANTEC GEOPHYSICAL SURVEY

A Titan 24 DC/IP and MT survey was conducted over the Getty Highland Valley Copper ‐Project, British Columbia, Canada on Getty Copper Inc. between November 20th and December 13th of 2010.

In total 12 lines of data were collected (23.2 line km DC/IP and 19.2 km MT) with a station ‐spacing of 100 m.

The survey geometry for the DC/IP component was a pole dipole geometry. The line ‐spacing was 250 m and the lines were located in a staggered fashion over three known deposits: Getty North, Getty West and Getty South.

The objectives of this survey were to further delineate the geophysical signatures of the Getty North, Getty West and Getty South deposits and identify potential other features of interest.

Page 51: Getty Copper Powerpoint Presentation  September 12, 2012

TITAN 24 QUANTEC GEOPHYSICAL SURVEY RESULTS

The QUANTEC survey was successful in identifying the Getty North, and South Deposits as well as the Getty West Zone whereby the overall data quality was high.

Summarizing the results of this survey the following conclusions can be drawn:

• Resistivity distribution (DC & MT) show a succession of curved, sub horizontal ‐ conductive features and South Southwest North Northeast faulting trend.‐ ‐ ‐

• Chargeability signature is fairly weak except for the known deposits and appears to be related to the interpreted faulting.

• Getty North is likely composed of two centers, where the western center extends further northeast in a similar azimuth as the interpreted faults. Resistivity is moderate low.‐

Page 52: Getty Copper Powerpoint Presentation  September 12, 2012

TITAN 24 QUANTEC GEOPHYSICAL SURVEY RESULTS

• Getty West is a near surface (<300 m depth) feature of weak moderate chargeability & ‐moderate low resistivity.‐

• Getty South deposit anomaly is a low resistivity, weak moderate chargeability feature ‐extending to approx. 350 m below the surface.

• In total thirty nine (39) geophysical anomalies were identified, of which twelve (12) are ‐classified as high priority.

• Sixteen (16) anomalies fall in the medium priority classification and eleven (11) are labeled as low priority.

Page 53: Getty Copper Powerpoint Presentation  September 12, 2012

TITAN 24 QUANTEC GEOPHYSICAL SURVEY

HIGH PRIORITY TARGET SUMMARY

Page 54: Getty Copper Powerpoint Presentation  September 12, 2012

TITAN 24 QUANTEC GEOPHYSICAL SURVEY IMAGES

Page 55: Getty Copper Powerpoint Presentation  September 12, 2012

TITAN 24 QUANTEC GEOPHYSICAL SURVEY IMAGES

Page 56: Getty Copper Powerpoint Presentation  September 12, 2012

TITAN 24 QUANTEC GEOPHYSICAL SURVEY IMAGES

Page 57: Getty Copper Powerpoint Presentation  September 12, 2012

TITAN 24 QUANTEC GEOPHYSICAL SURVEY IMAGES

Page 58: Getty Copper Powerpoint Presentation  September 12, 2012

TITAN 24 QUANTEC GEOPHYSICAL SURVEY IMAGES

Page 59: Getty Copper Powerpoint Presentation  September 12, 2012

TITAN 24 QUANTEC GEOPHYSICAL SURVEY IMAGES

Page 60: Getty Copper Powerpoint Presentation  September 12, 2012

GETTY GEOPHYSICAL I.P. ANOMALIES

Page 61: Getty Copper Powerpoint Presentation  September 12, 2012

GETTY NORTH & GETTY SOUTHDEPOSITS AND I.P. ANOMALIES

Page 62: Getty Copper Powerpoint Presentation  September 12, 2012

The Getty West Zone is located 1.4 km to the southwest of the Getty North Deposit. As a result of 13.5 line kilometers (8.4 miles) of I.P. and magnetometer surveying, a large, 1 kilometer wide I.P. chargeability anomaly was outlined on the Getty West Zone, which appears to be striking toward the Getty North Deposit.

A Titan 24 Quantec Geophysical Survey was completed including the Getty West Zone in December 2010.

GETTY WEST ZONE ANOMALY

Page 63: Getty Copper Powerpoint Presentation  September 12, 2012

The next recommended phase of diamond drilling will follow up on the porphyry copper style mineralization intersected in discovery diamond drill hole GL96-08, which yielded 42 meters (138 ft.) grading 0.26% Cu with .02% Mo., including 16 meters (53 ft.) grading 0.42% Cu and 0.025% Mo.

This follow up diamond drilling may possibly indicate another Highland Valley type porphyry copper, molybdenum, gold and silver deposit in the Getty West Zone or that it is a possible extension of the Getty North Deposit.

GETTY WEST ZONE ANOMALY

Page 64: Getty Copper Powerpoint Presentation  September 12, 2012

NORTH VALLEY ZONE I.P.CHARGEABILITY ANOMALIES

Page 65: Getty Copper Powerpoint Presentation  September 12, 2012

• Consists of two large intense I.P. chargeability anomalies.

• The Southwest anomaly measures 1,200m (3,900 ft.) by 2,100 m (6,900 ft.) occurs in an area of favorable geology of Highland Valley phase , Guichon granodiorite intruded by Bethlehem phase porphyritic granodiorite.

• The large Northwest anomaly measures 2,600m (8,500 ft.) by 3,000m (9,800 ft.)

NORTH VALLEY ZONE I.P. ANOMALIES

Page 66: Getty Copper Powerpoint Presentation  September 12, 2012

The two large IP anomalies are shown as the Glossie Zone which historical reports state that in 1915, 19.8 tonnes (21.8 tons) of hand-selected ore from two shafts was shipped to the Tacoma smelter.

Assay returns on that ore were 0.94 grams per tonne (0.03 ounce per ton) gold; 86.25 grams per tonne (2.76 ounces per ton) silver; and 12.62 per cent copper.

GLOSSIE ZONE ANOMALIES

Page 67: Getty Copper Powerpoint Presentation  September 12, 2012

ENVIRONMENTAL ASSESSMENT AND PERMITTING

• Environmentally friendly floatation concentrator with an oxide tailings leach process

• NSC bulk flotation concentrate pressure leaching and agitated vat leaching of flotation tailings with SX-EW processing is utilized to produce 99.99% pure copper cathodes and molybdenum trioxide. These closed circuit hydrometallurgical processes are environmentally friendly.

• Consultation meetings held with the First Nations, the City of Kamloops, the communities of Ashcroft, Merritt and Logan Lake

• Large active mining area adjacent to Teck’s Highland Valley Copper Ltd.

• Active clear cut logging on the property

• No salmon rivers, streams or lakes

• Adjacent to both the Highland Valley Copper Mine infrastructure and Bethlehem Copper mine site

Page 68: Getty Copper Powerpoint Presentation  September 12, 2012

• Land use plan: mining and other resource based industries permitted. • Getty Property is in a large, existing active major mining area. • Extensive clear-cut logging on the property. • Hydrometric Studies completed on streams and creeks. • Environmental base line study, completed by Gartner Lee Ltd. • No salmon rivers or lakes on the property. • Adjacent to the Valley, Lornex and Bethlehem Copper tailings ponds and mine sites.

ENVIRONMENTAL CONSIDERATIONS

Page 69: Getty Copper Powerpoint Presentation  September 12, 2012

AN ADVANCED HIGHLAND VALLEY

COPPER PROJECT INGLOBAL MARKET CONTEXT

Page 70: Getty Copper Powerpoint Presentation  September 12, 2012

1 Chile 3,356,600 38% of World Supply2 Peru 1,107,7893 China 940,0004 Australia 833,0005 United States 801,000

6 Russian Federation 750,000

7 Indonesia 632,6008 Canada 606,9999 Poland 429,000

10 Kazakhstan 420,00011 Zambia 383,000

12 Islamic Republic Of Iran 241,000

13 Brazil 206,00014 The Democratic Republic Of Congo 189,00015 Mexico 172,093

WORLD MINE PRODUCTION, BY COUNTRY (METRIC TONNES)

United States Geological Survey (USGS) Minerals Resources Program, 2008

Page 71: Getty Copper Powerpoint Presentation  September 12, 2012

BASE METALS PRICE TO COST CURVES…COPPER STANDS OUT

Source: LME, Macquarie Research, January 2012

Page 71

LME Copper prices and cash costs

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,00020

00

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

$/to

nn

e co

pp

er

90th percentile LME cash

LME Aluminium prices and cash costs

1,000

1,500

2,000

2,500

3,000

3,500

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

$/to

nn

e al

um

iniu

m

90th percentile LME cash

LME nickel prices and cash costs

0

10000

20000

30000

40000

50000

60000

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

$/to

nn

e n

icke

l90th percentile LME cash

LME zinc prices and cash costs

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

$/to

nn

e zi

nc

90th percentile LME cash

MACQUARIE CAPITAL (EUROPE) LIMITED

Page 72: Getty Copper Powerpoint Presentation  September 12, 2012

ALL ABOUT CHINA IN COPPER

Source: ICSG, IMF, Macquarie Research, January 2012

Chinese and world copper demand in the historical context

0

2500

5000

7500

10000

12500

15000

17500

20000

1900

1905

1910

1915

1920

1925

1930

1935

1940

1945

1950

1955

1960

1965

1970

1975

1980

1985

1990

1995

2000

2005

2010

'000

t co

pp

er

China World Ex-China World

Copper consumption per person

0.0

1.0

2.0

3.0

4.0

5.0

6.0

1950

1954

1958

1962

1966

1970

1974

1978

1982

1986

1990

1994

1998

2002

2006

2010

kg c

op

per

/cap

ita

China World ex-China World average

MACQUARIE CAPITAL (EUROPE) LIMITED

Page 73: Getty Copper Powerpoint Presentation  September 12, 2012

COPPER SUPPLY TIGHTNESS DRIVEN BY A LACK OF CHINA SUPPLY RESPONSE

• CHINA CAN MEET ONLY ONE-THIRD OF ITS COPPER DEMAND (FROM CONCENTRATE AND SCRAP).• NON-CHINESE PRODUCTION HAS NOT RESPONDED TO PRICE INCENTIVE OVER PAST SIX YEARS.

Change in global copper mine supply and average LME price

3.8%

2.6%

-0.9%

0.7%

7.3%

1.8%1.4%

2.8%

1.3% 1.7%1.3%

0.6%

-2%

-1%

0%

1%

2%

3%

4%

5%

6%

7%

8%

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

f

min

e su

pply

: % c

hang

e yo

y

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

LM

E p

rice

: $/

ton

ne

% change YoY (mine supply) LME cash price

Source: Antaike, ICSG, Brook Hunt, LME, Macquarie Research, January 2012

Chinese domestic copper supply and demand

0

1000

2000

3000

4000

5000

6000

7000

8000

1990

1992

1994

1996

1998

2000

2002

2004

2006

2008

2010

'000

t co

nta

ined

Cu

Domestic mine production and scrap generation

Consumed

Page 74: Getty Copper Powerpoint Presentation  September 12, 2012

COPPER SUPPLY NEEDS TO GROW FASTER THAN DEMAND INCREASES DUE TO DEPLETIONS AT EXISTING OPERATIONS

10

15

20

25

30

35

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Rec

over

able

Min

e C

oppe

r -

Mt

Base Case Mine Production Highly Prob. & Prob. Brow nfield Projects

Highly Probable Greenfield Probable Greenfield Projects

Other identif ied Projects Demand for Mine Production

Source: Brook Hunt – A Woodmac Company, Macquarie Research, January 2012

MACQUARIE CAPITAL (EUROPE) LIMITED

Page 75: Getty Copper Powerpoint Presentation  September 12, 2012

GLOBAL COPPER MINE OUTPUT CONTINUES TO FALL SHORT OF EXPECTATIONS…

-1.5

-1.0

-0.5

0

2007 2008 2009 2010 2011

m t

on

nes

co

pp

er c

on

tain

ed

-9%

-6%

-3%

0%

% o

f glo

ba

l min

e o

utp

ut

LHS: volume terms RHS: proportional terms

Source: CRU, Wood Mackenzie, Macquarie Research, January 2012

SHORTFALL IN GLOBAL MINE OUTPUT COMPARED WITH FORECASTS MADE ONE YEAR PREVIOUSLY

Page 75

MACQUARIE CAPITAL (EUROPE) LIMITED

Page 76: Getty Copper Powerpoint Presentation  September 12, 2012

ANALYSIS OF CHILEAN COPPER MINE PRODUCTION RUNNING HARDER TO STAND STILL…

Chilean copper mine production, 2000-2011E

0

1000

2000

3000

4000

5000

6000

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

Cop

per

(kt)

Capacity That Existed in 2000 Brownfield expansions carried out since 2000New Mines added since 2000 Highly Probable Projects

Probable Projects Possible ProjectsActual

EXISTING CHILEAN MINES WILL LOSE ANOTHER 1MTPA OF PRODUCTION

BETWEEN NOW AND 2020 DUE TO RESERVE AND GRADE DEPLETION

Source: WoodMac, Macquarie Research, January 2012

mt copper 2004-112004 2011E Change

Capacity that existed in 2000 4.77 3.80 -0.97

Brownfield expansions 0 0.80 0.80

Greenfield expansions 0 0.70 0.70

Actual production - total 4.77 5.30 0.53

MACQUARIE CAPITAL (EUROPE) LIMITED

Page 77: Getty Copper Powerpoint Presentation  September 12, 2012

HEAD GRADES ARE FALLING IN MOST METALS

FALLING GRADES REFLECT AN END OF TEMPORARY HIGH-GRADING, LOWER-QUALITY ORE DEPOSITS AND RESERVE DEPLETIONS AT BETTER ORE BODIES.

SOURCE: BROOK HUNT – A WOOD MACKENZIE COMPANY, DERIVED FROM DEMENC DATA, MACQUARIE RESEARCH, JANUARY 2012 .

Average head grade at copper mines

0.90

0.95

1.00

1.05

1.10

1.15

1.20

1.25

1.30

1.35

2000 2005 2010 2105F 2020F 2025F

% c

oppe

r

Cu

Average head grade at lead and zinc mines

5.0

5.2

5.4

5.6

5.8

6.0

6.2

6.4

6.6

6.8

7.0

2000 2005 2010 2105F2020F2025F

% z

inc

1.5

1.7

1.9

2.1

2.3

2.5

2.7

2.9

% le

ad

Zinc (LHS)

Lead (RHS)

Average grade of nickel saprolite ore mined in New Caledonia

2.2%

2.3%

2.4%

2.5%

2.6%

2.7%

2.8%

2.9%

3.0%

% N

i (dr

y) 1

2MM

A

Page 78: Getty Copper Powerpoint Presentation  September 12, 2012

LEFT CHART: ROBIN BAHR, CREDIT AGRICOLE, GLOBAL COPPER MARKET TRENDS 2011-12 FOR THE ICSG ENVIRONMENTAL & ECONOMIC COMMITTEE MEETING, 14TH APRIL 2011ESCONDIDA & GRASBERG DATA FROM RIO TINTO OPERATION REVIEWS Q4 2002-10

GLOBAL AVERAGE COPPER MINE HEAD GRADE, 1978-2018

2001 2002 2003 2004 2005 2006 2007 2008 2009 20101.00%1.10%1.20%1.30%1.40%1.50%1.60%1.70%1.80%1.90% Escondida (Concs)

2001 2002 2003 2004 2005 2006 2007 2008 2009 20100.75%

1.00%

1.25% Grasberg

Average global grade decline: ~0.015% /year~0.15%/decade

Average decline: ~0.05% /year

Average decline: ~0.017% /year

Page 79: Getty Copper Powerpoint Presentation  September 12, 2012

GLOBAL COPPER PROJECT CONSIDERATIONS

Page 80: Getty Copper Powerpoint Presentation  September 12, 2012

GLOBAL COPPER PROJECT CONSIDERATIONS

Page 81: Getty Copper Powerpoint Presentation  September 12, 2012

GLOBAL COPPER PROJECT CONSIDERATIONS

Page 82: Getty Copper Powerpoint Presentation  September 12, 2012

Canada Has Very Low Political Risk

GLOBAL COPPER PROJECT CONSIDERATIONS

Page 83: Getty Copper Powerpoint Presentation  September 12, 2012

1. OPEN PIT MINABLE ADVANCED DEPOSIT WITH GOOD RESOURCES AND POSSIBLE BY-PRODUCT CREDITS COULD INCREASE POTENTIAL

2. CLEAN DEPOSIT MINERALOGY (E.G. PRIMARY ARSENIC MINERALIZATION ABSENT)

3. NI 43-101 PRE FEASIBILITY STUDY ALREADY COMPLETED WITH A HIGH PERCENTAGE OF PROBABLE RESERVES ESTABLISHED FROM MEASURED & INDICATED RESOURCES

4. FAVORABLE NORTH AMERICAN LOCATION DESIRED WITH ESTABLISHED LOCAL MINING

5. LOCAL ABUNDANT AVAILABLE WATER, ENERGY, INFRASTRUCTURE AND TRANSPORTATION

6. PROJECT IS WELL DEVELOPED AND COMPANY IS POSSIBLY UNDERVALUED WITH NO MAJOR PARTNER YET ACTIVELY INVOLVED

PROPOSED GLOBAL COPPER PROJECT INVESTMENT CHOICE CRITERIA

Page 84: Getty Copper Powerpoint Presentation  September 12, 2012

CIBC WORLD MARKETS US/CANADA EARLY STAGE OPEN PIT COPPER PROJECTS

Page 85: Getty Copper Powerpoint Presentation  September 12, 2012

CIBC WORLD MARKETS US/CANADA EARLY STAGE OPEN PIT COPPER PROJECTS ARE CIRCLED THAT HAVE BOTH

AN NI 43-101 COMPLIANT PRE FEASIBILITY STUDY AND PROBABLE RESERVES

Page 86: Getty Copper Powerpoint Presentation  September 12, 2012

• PROPERTY LOCATED IN AN ACTIVE MAJOR PRODUCING MINING DISTRICT WITH SIGNIFICANT WELL DEFINED COPPER RESOURCES

• OVER 80% OF THE COMBINED INDICATED RESOURCES ARE CLASSIFIED AS CIM PROBABLE RESERVES

• LARGE PROPERTY WITH MANY CLEARLY DELINEATED IP ANOMALIES AND EXPLORATION TARGET RESOURCE AND RESERVE EXPANSION POTENTIALS.

• LOCATED IN A POLITICALLY STABLE REGION WITH EXTENSIVE INFRASTRUCTURE ENERGY AND TRANSPORTATION AVAILABLE

• UTILIZES INDUSTRIALLY PROVEN METALLURGICAL TECHNOLOGY WITH ADDITIONAL CUSTOM CONCENTRATE TREATMENT CAPACITY DESIGNED IN

GETTY ADVANCED COPPER PROJECT SUMMARY

AN ADVANCED HIGHLAND VALLEY COPPER PROJECT !

Page 87: Getty Copper Powerpoint Presentation  September 12, 2012

ADVANCED HIGHLAND VALLEY COPPER PROJECT

Getty Copper Inc.1000 Austin Avenue

Coquitlam, British ColumbiaCanada V3K 3P1

Tel: (604) 931-3231Fax: (604) 931-2814

E-mail: [email protected] 12, 2012

Page 88: Getty Copper Powerpoint Presentation  September 12, 2012