RESUME ABDUL AZEEM G-12 RAFE-AAM SOCIETY, MALIR HALT, KARACHI-43 CONTACT # 0092-021-4599816/ 0334-3055322 E-mail:[email protected] Father’s name Muhammad Abdul Rehman Date of birth 28th July 1971 Marital status married N.I.C 4201-5421515-7 Passport # CY1855151 Driving license 1049448
CAREER GOAL:
To obtain a potential position within a diverse environment where my knowledge, skills and experience are aptly utilized and challenged to meet the needs of a growing organization.
Educational Qualification
Secondary school certificate exam passed from KULSOOM BAI VALIKA AIRPORT MODEL SCHOOL Karachi 1990
Intermediate exam passed from Govt SUPERIOR SCIENCE COLLEGE Karachi 1992
Qualification
Diploma of Associate Engineering in Power Technology in First Division from Govt College of Technology 1994
One Year Diploma in industrial instrument passed in Grade "C" from Petroman Training Institute 1995
B-tech passed in Electronic Technology from PIMSAT(Preston institute of management science and technology) 2008
Computer knowledge
Windows 2000 Xp & MS Word
Language
I Have been pass English language course from Pak American culture centre
Experience Fifteen years
Training
Two month training At Korangi Thermal Power Plant through Government college of Technology
Two month training industrial instrumentation At National Refinery through Petromen Karachi
Two weeks training of siemens PLC software programming S7 & PCS7 at siemens
(Karachi)
Ten days abroad training of siemens PCS 7& MMD software programming at Siemens(Germany)
Employment record
(Company Name) (City, state) 6th Jan-2003 to till date Security Paper Limited Karachi. Pak
I am working this company as an instrument technician
and giving the responsibility as follows
I am working on PCS 7 DCS system and also working siemens drives system micro master 420 & 440 which is control a process
Daily inspection of the plant instrument Maintenance, overhauling, calibration of different
instrument / control system of PM2, winder, sheeter To maintain shift log book To comply fulfill all given target as per quality and / or
environmental objectives/ target) To follow all specified disciplinary and security
corporate guide line To follow the quality and environmental policy and
related procedure
(Company name) (City, state) 5th Oct 2000 to 26th sept 2002 Fauji Jordan fertilizer company Karachi, Pak
I worked as an instrument technician and I have been given responsibility as follows
Calibration flow, level, pressure, temperature instruments
Calibration ammonia detection and H2 and CO2
analyzers analyzers Loop checked vibration system( Bentley Nevada series
7200,3300,3000) Making a instrument maintenance sheet according to
ISO 9000 Perform worked DCS system INF90 and PLC(HIMA) Checked the Woodward governor instruments for CO2
compressor
(Company name) (City, state) 10th June 2000 to 5th sept 2000
Team Automation Ruwais, U.A.E I worked as instrument technician at Ruwais
Refinery with Snamprogetty Company and I did work as follows
Calibration plant instruments flow, level, pressure and
temperature Ionic Calibration Flash point analyzer, oxygen analyzer,
sulphur analyzer, PH analyzer, conductivity analyzer, ionic and Nitric analyzer Calibrate the level of storage tanks instruments(Enraf) Checked the loops from field to DCS INF90 system Checked the Fast loops for analyzers Laid the fiber optic trasmmition cable Maked the calibration sheets as per company required
(Company name) (City, state)
1st April1999 to 6th June 2000 Pakistan Oil Refinery Karachi, Pak
I worked as an instrument technician through
contractor and my job responsibility as follows
Calibration the pneumatic and electronic smart series instruments
Calibration the flue gas analyzers Maintenance the all instruments which are used in
refinery Pneumatic and electronics loops checked from field to
control room Made a temperature indicator loops of the oil furnace Trouble shoots of all instruments Calibrate the interface level of crude oil
(Company name) (City, state)18th sept1997to24th march1999 Descon Pvt. Ltd Karachi, Pak
I worked as an instrument technician on erection period at Fauji Jordan Fertilizer
(FJFC) and my job responsibility as follows
Installation and calibration of Urea, Utility, DAP and gas turbine instruments under
the supervision of krebs-speichim (France) Pre-commissioning of instruments Loop checked from field to DCS INF90 and
PLC(HIMA) Calibration and maintenance of all instruments Proper laid the cable of infi net Trouble shoots of instruments and analyzers Calibrate the gas turbine instrument especially Bently
Nevada series 7200 3300,3000 Made the instruments calibration sheets as per ISO
9000 requirement Install a radioactive source for urea reactor level
(Company name) (City, state)27th Jan 1996 to10th sept1997 Zelin Pvt.Ltd Balouchistan, Pak
I worked as an instrument technician (site Hub co
power plant 4X323 MW my job responsibility as follows
Instrument’s installation and calibration of boiler and utility area
Loop checked for field to DCS INF90 Calibration maintenance of all instruments especially
boiler drum level transmitter Trouble shoots of all instruments To verify the instrument’s calibration of my client I H I
(Ishikawajima- Harima Heavy industries co., Ltd) and Hub co managers To verify a instruments calibration sheets as per
instrument behavior Calibration of damper setting of flue gases