17
1

206560 p6 analytics 3 1

Embed Size (px)

Citation preview

Page 1: 206560 p6 analytics 3 1

1

Page 2: 206560 p6 analytics 3 1

<Insert Picture Here>

P6 Analytics R3.1

Shawn Lafferty

Functional Designer

Page 3: 206560 p6 analytics 3 1

3

The following is intended to outline our general

product direction. It is intended for information

purposes only, and may not be incorporated into any

contract. It is not a commitment to deliver any

material, code, or functionality, and should not be

relied upon in making purchasing decisions.

The development, release, and timing of any

features or functionality described for Oracle’s

products remains at the sole discretion of Oracle.

Page 4: 206560 p6 analytics 3 1

4

Agenda

• New Features in P6 Analytics r3.1

• New Subject Areas and Fields

• Demo

– Dashboards, Analyses, and Catalog

Page 5: 206560 p6 analytics 3 1

5

P6 Analytics 3.1 available on e-delivery

Page 6: 206560 p6 analytics 3 1

6

New Features

Page 7: 206560 p6 analytics 3 1

7

New Features in P6a r3.1

• History

– Daily (Activity and Resource Assignment)

– Dimensional (Slowly Changing Dimensions (SCD))

• (e.g. activity name change can be saved)

• Code Hierarchies

– Project, Activity, and Resource level

– Available in all subject areas

• Burn Down

– Ability to track project progress vs. point in time

– Industry specific (non-agile)

Page 8: 206560 p6 analytics 3 1

8

New Features in P6a r3.1 (con’t)

• User Defined Fields

– Date and Text

– Project, WBS, Activity and Resource

– Cost/Numbers for Resource and Resource Assignment

• Work Planning

– Ability to track project planning vs. multiple points in time

– Industry specific (AP928, INPO)

Page 9: 206560 p6 analytics 3 1

9

History

• Activity and Resource Assignment Level

– New Subject Areas for each

– P6 Project Preferences, Analytics, History Level = Activity

• Daily

– Opting in to Activity History = Daily History

• Dimensional

– Customizable with mappings.tcsv

Page 10: 206560 p6 analytics 3 1

10

Code Hierarchies

• Project, Activity, and Resource codes

– Across Subject Areas

– Full Code Path

– Configured Codes are automatically part of the Hierarchy

– Hierarchy as well as full level support

Page 11: 206560 p6 analytics 3 1

11

Burn Down

• Track project against single point in time

– sys_workdown_date project UDF in P6

– “baseline” of how project should go

• “Burn Down” values based on whole project

– Historical capture and future projections

• Daily

– Daily view to get project back on schedule (if needed)

Page 12: 206560 p6 analytics 3 1

12

Work Planning

• Track project against multiple points in time

– sys_scope_freeze, sys_schedule_freeze project UDF in P6

– How project doing according to scope and schedule freeze

– Weekly and Daily capture

– Historical comparisons (scope & schedule freeze)

– Last week

Page 13: 206560 p6 analytics 3 1

13

Subject Area Growth By Release

1.0 2.0 3.1

4 - Subject Areas Activity

Project History

Resource Assignment

Resource Utilization

7 - Subject AreasActivity

Activity UDF

Project History

Project UDF

Resource Assignment

Resource Utilization

WBS UDF

13 - Subject AreasActivity

Activity History

Burn Down

Activity UDF

Project History

Project UDF

Resource Assignment

Resource Assignment History

Resource UDF

Resource Assignment UDF

Resource Utilization

WBS UDF

Work Planning

New Subject Areas

Page 14: 206560 p6 analytics 3 1

14

Subject Area Categories

• 13 Subject Areas

3 Current

3 History

5 UDF

2 Industry

Page 15: 206560 p6 analytics 3 1

15

Demo

Page 16: 206560 p6 analytics 3 1

16

Additional Resources

Page 17: 206560 p6 analytics 3 1

17

More Information

• OTN

• http://www.oracle.com/technetwork/apps-

tech/primavera/documentation/index.html

• Blog

• https://blogs.oracle.com/P6Analytics/

• P6 Analytics Product page

• http://www.oracle.com/us/products/applications/pri

mavera/p6-analytics/resources/index.html