View
116
Download
0
Category
Preview:
DESCRIPTION
How green can construction be? Under the present need for better infrastructure, we cannot escape the fact that more construction will have to be done. We only need to ensure that the construction is effected with materials with a lower carbon footprint. Maleki products offer a groundbreaking option for decision makers to ensure that the inevitable growth is sustainable and ensures that the carbon footprint of their work is grossly reduced. Maleki GmbH targets to reduce global carbon dioxide emissions by 1% by reducing the consumption of the cement.
Citation preview
MALEKI GmbH Products Now in India
Maleki Gmbh’s Green Technology products and technical support is now available in India.
Maleki Gmbh along with BBIPPL is committed to delivering world class building materials for those who see the future of their construction projects with Green Technology.
Green tech materials selected for promotion here in India would cover the following known problem areas:
Waterproofing
1.Concrete2.Masonry Plaster
Chemical load environments
Self leveling floors
Waterproofing The problem areas/substrates
Concrete
1.Roads
2.Bridges
3.Dockyard structures
4.Dams/Storage tanks
5.Pipes
6.Township driveways/podiums multilevel parking
7.Protection from groundwater for basements
8.Terrace, balcony & bathroom waterproofing.
Maleki > Waterproofing
Roads
Problem •Roads normally can have water penetrate, leading to damage of surface.
Solution • Treatment with DW 100 seals
pores & prevents damage due to efflorescence
Note: This is a treatment done to concrete post cure, hence cannot rectify defects in the original cast concrete
Maleki > Waterproofing > Road Maleki > Waterproofing > Road
Bridges
Problem • Water & salt-water are
extremely corrosive when in close proximity
• High humidity combined with porous nature of concrete promotes growth of various algae, fungi & other organisms, creating maintenance issues
Solution • Hydrophobic behavior
brought in by LL 100 seals pores and makes the surface hydrophobic -thereby taking care of both issues
Maleki > Waterproofing > Bridges
Maleki > Waterproofing > Bridges
Dockyard Structures
Problem • In addition to water/saltwater
issues, dockyard structures are exposed to pollutants & chemically aggressive environments.
• Particulates in water also physically wear and erode the concrete structures.
Solution • DW100/LL100 combination
to be considered to resolve these issues
Maleki > Waterproofing > DockyardsMaleki > Waterproofing > Dockyards
Dams & Storage Tanks
Problem • Water under pressure
• Conventional treatments are only preferred on the +ve side - difficult to work on
Solution • Maleki materials work
from both +ve & -ve side
• DW100 / DS 220 / DS 250 Flex
Maleki > Waterproofing > DamsMaleki > Waterproofing > Dams
Pipes
Problem • Concrete pipes are designed for
long duration uses, typically installed in difficult to access locations
• Typical uses are for either storm water or sewage and hence their wall thickness is overdesigned, assuming loss in wall thickness over its designed life.
Solution • Pipes designed as per structural
requirement - wall thickness can be reduced. Savings in cost of material then more than offsets the cost of protection by use of Maleki DW 100
Maleki > Waterproofing > PipesMaleki > Waterproofing > Pipes
Township drivewaysPodiumsMultilevel Parking
Problem Although slabs in such locations are not exposed to rain, the absence of waterproofing causes issues to lower levels.
Solution Waterproofing (DS 220 / DS 250 Flex)/ sealing (DW 100) of pores helps reducing efforts of maintenance on an ongoing basis
Maleki > Waterproofing > Multilevel ParkingMaleki > Waterproofing > Multilevel Parking
Basements
Problem • Water under pressure
• Conventional treatments are only preferred on the + ve side - difficult to work on
Solution • Basement waterproofing
can be done in confined spaces DS 250 Flex / DW 100
• Can be done from –ve side if +ve side is not accessible
Maleki > Waterproofing > BasementsMaleki > Waterproofing > Basements
BathroomsBalcony Terrace Problem
• Conventional BBK (Birck-Bat Koba) with its' inherent limitations also requires 4-6" ht.
• Intricacies of casting slab is required to accommodate the 4-6" ht difference so required.
• Process is time consuming - requires multistage, multiple day cure
Solution • Superior quality of waterproofing can
be achieved, in less than 3mm (DS 250 Flex)
• Floor leveling & subsequent tile laying can be taken up as early as 8 hrs after applying MALEKI waterproofing materials.
• Project times to completion stand to be substantially reduced.
Maleki > Waterproofing > BathroomsMaleki > Waterproofing > Bathrooms
Waterproofing The problem areas / substrates
Masonry + Plaster
1.Masonry chambers for intersections of waterlines
2.External & internal walls with conventional cement plaster
3.Irrigation canals/Open water channels
Maleki > Waterproofing > MasonryMaleki > Waterproofing > Masonry
Masonry chambers for intersections of waterlines
Problem •Manholes end up with corrosive environments - stepping ladders are known to corrode and cause a safety hazard to maintenance crews entering them
Solution •Cost effective waterproofing along with protection of large infrastructure fluid handling lines.•KM 750 / SWP 270 / TPC 220
Maleki > Waterproofing > Manholes Maleki > Waterproofing > Manholes
External & internal walls with conventional cement plaster
Problem • Efflorescence, fungal growth
etc. contribute to lowering life of external plastered surfaces.
Solution • Maleki products ensure
closing of pores to prevent these phenomenon - thereby increasing the life of such external surfaces, in addition to their water barrier characteristics (LL 100)
Maleki > Waterproofing > WallsMaleki > Waterproofing > Walls
Irrigation Canals Open water channels
Problem •Leakage losses from irrigation canals have the combined problem of:• lower delivery to intended users
as per plan,• increase in salinity of adjacent
lands• leading to loss in agricultural
yield despite availability of water
Solution •Maleki products are unaffected by UV and hence continue to function in the most adverse outdoor conditions (DS 220 / DS 250 Flex)/ DW 100)
Maleki > Waterproofing > CanalsMaleki > Waterproofing > Canals
Chemical load environments Conventional problem zones
Storage/transport of pH imbalanced fluids
1.Township sewage treatment plants
2.STP fluid lines
3.Industrial effluent treatment plants
Handling of Petrochemical materials
1.Metal protection
2.Protection of civil / masonry structures
Maleki > Chemical Environments Maleki > Chemical Environments
Township Sewage Treatment Plant
Problem •Conventional materials offer solutions, but very few stand to the norms of green solutions
•Green solutions are, so far, available only at a premium
Solution •MALEKI materials provide green solutions - without the premium KM 750 / SWP 270 / TPC 220
Maleki > Chemical Environments > Township Sewage Maleki > Chemical Environments > Township Sewage
STP Fluid Lines
Problem •Conventional problems have solutions, but very limited green solutions•Green solutions are, so far, available only at a premium
Solution •MALEKI DW 100 provides a green solution – with all processing done at works before delivery on site
Maleki > Chemical Environments > STP Fluid PipesMaleki > Chemical Environments > STP Fluid Pipes
Industrial effluent treatment plants
Problem •pH range can be very extreme
•Effluents can contain heavy metals, particulates etc. which will have mechanical abrasion as a problem as wellSolution •Special materials (KM 750 / SWP 270 / TPC 220) can handle pH ranges from 0-14•Abrasive erosion along with high chemical stress can be handled by Maleki KM 750
Maleki > Chemical Environments > Industrial effluent treatment plantsMaleki > Chemical Environments > Industrial effluent treatment plants
Metal protection
Problem • Many regions have metal
and masonry combination solutions.
• Interfaces have corrosion as well as leakage issues
• Corrosion of petrochemical storage tanks
Solution • Inorganic nature of Maleki
KM 750 provides the best combination of protection, safety and economics.
Maleki > Chemical Environments > Metal ProtectionMaleki > Chemical Environments > Metal Protection
Protection of CivilMasonry structures
Problem •Structures exposed to the elements tend to wear faster due to porosity of the concrete as cast.
Solution Pores sealed by MALEKI DW100/LL100 1.Extremely easy to apply on verticle and horizontal surfaces2.Increase hardness of the concrete surface3.Seal pores to arrest any growth of organic matter anchored on these surfaces
Maleki > Chemical Environments > Civil Masonry Structures Maleki > Chemical Environments > Civil Masonry Structures
Self leveling floors The green alternatives
Clean Rooms1.Hospital OTs2.Pharmaceutical labs & production areas3.Rooms for Sensitive electronic
High footfall regions 1.Public transport waiting areas / platforms2.Malls & multiplexes3.Lobby areas of hotels & residential complexes
High temp & high impact load areas
Pre tiling floor leveling - single material, multiple advantages.
Maleki > Self Leveling FloorsMaleki > Self Leveling Floors
Hospitals and OT’s
Problem • Materials of organic origin also
tend to promote bacterial growth unless they contain toxic additives.
• Dust free environment of prime importance - directly influences the rate of postoperative recovery.
Solution • MALEKI IFS 410 or IFS 400
offer the performance with green materials without toxic additives.
Maleki > Self Leveling Floors > HospitalsMaleki > Self Leveling Floors > Hospitals
Pharma Labs
Problem • Materials of organic origin also
tend to promote bacterial growth unless they contain toxic additives.
• Dust free environment of prime importance.
Solution•IFS family of products (IFS 410 / IFS 400 )•Maintenance of floors eases due to seamless flooring
Maleki > Self Leveling Floors > Pharma LabsMaleki > Self Leveling Floors > Pharma Labs
Rooms for sensitive Electronics
Problem • Dust interferes in processes
• Elaborate maintenance is not feasible.
Solution • IFS 400 in combination with
DW100/LL100 liquid silicates offer a variety of solutions to meet specific demands of end users.
Maleki > Self Leveling Floors > Electronic RoomsMaleki > Self Leveling Floors > Electronic Rooms
Public Transport Waiting Areas
Problem • Heavy footfalls lead to
wearing of most known surfaces
• Joinery in tiles leads to maintenance / safety and hygiene issues
Solution • Joint-less floors are possible
with IFS 400 in combination with DW100/LL100 liquid silicates
• Superior wear resistance ensures lower long term cost
Maleki > Self Leveling Floors > Public Waiting AreasMaleki > Self Leveling Floors > Public Waiting Areas
Malls Multiplexes
Problem •Heavy footfalls
•Large variation in weight of traffic on the finished surface
Solution
• IFS 410 combines well with DW100/ LL100 liquid silicates to give designer floors with out compromising on performance & cost
Maleki > Self Leveling Floors > MallsMaleki > Self Leveling Floors > Malls
Hotel LobbyResidential Lobby
Problem •Tile joinery is always a problem zone for maintenance.•Design flexibility for aesthetics is expensive.Solution • IFS 410 combines well with DW100/
LL100 to give longer lasting wear resistant surfaces
• Jointless continuous areas at a lower cost than designer tiling.
• Aesthetic design flexibility will not be compromised.
Maleki > Self Leveling Floors > Hotel LobbyMaleki > Self Leveling Floors > Hotel Lobby
High temperature and High impact load areas
Problem • Forge shops / industrial tool
rooms• Production floors• Automobile garages and
multilevel parking areas
Solution •MALEKI IFS 410 combines well with DW100/ LL100 - useable upto 1300C
Maleki > Self Leveling Floors > High impact areasMaleki > Self Leveling Floors > High impact areas
Pre-tiling floor leveling
Problem •High level of skill required•Time consuming process•Load level being high leads to RRC need to be overdesigned.
Solution • MALEKI BV 310 - lower level of skill demanded
achieves perfect leveling - an intrinsic need for popular large format tiles.
• Leveling can be achieved with substrate variations from 2 mm to 30 mm
• Since leveling is achieved with minimum increase in floor height, total loading on slab is reduced.
• Reduction in height required for flooring also can have an impact on high rises.
Maleki > Self Leveling Floors > Floor levelingMaleki > Self Leveling Floors > Floor leveling
Tile adhesive
Tile adhesives & grouts known issues / problem areas
Maleki > Waterproofing
Tile adhesive
Problem •Conventional cement is susceptible to damage by high humidity environments•Shrinkage while curing can leave hollows between the tile and substrate floor – unsupported surfaces are prone to early damage.
Solution • MALEKI FK 601 – is an ecofriendly product
due to the reduction of your dependence on cement.
• Lighter and smoother consistency helps better adhesion without leaving air gaps
• Hydraulic cure binder – designed for use in high water regions such as kitchens and laundry areas. Also used to for swimming pool tiling.
Maleki > Self Leveling Floors > Floor levelingMaleki > Self Leveling Floors > Floor leveling
Problem •Tile grouts are typically not water resistant•Water resistant grouts are predominantly of organic origin.
Solution • MALEKI FF20 Ultra – water based
inorganic material – no additives and blending required onsite. Just add water to desired consistency and use.
• Works not just in wet environments, but also withstands acids and alkaline cleaning media
• Entire family of materials available to suit your specific requirements.
Maleki > Self Leveling Floors > Floor levelingMaleki > Self Leveling Floors > Floor leveling
Tile grout
Thank you!
info@malekigbm.comwww.malekigbm.com
Recommended