Rainbow BRT - Building upon Pune's Pilot BRT project

Preview:

Citation preview

1

Rainbow BRTS Building upon the Learnings from Pune’s Pilot BRTS

2

Pilot BRTS RAINBOW BRTS

Had Kerb side bus stops different for to and fro buses.

Has Median side bus stops common for to and fro buses.

3

Pilot BRTS

RAINBOW BRTS

Open Bus Stops low height..

Passengers wait on roads

Closed Bus Stop high platform.

passengers cannot wait on road

4

Pilot BRTS RAINBOW BRTS

Open bus stops, Less Waiting space. Lack of

illumination

Closed Bus stops, adequate waiting space, Ample illumination.

5

Pilot BRTS RAINBOW BRTSBus lane

segregators were discontinuous, railings used to

be removed and damaged.

Bus lane segregators are of concrete and are continuous.

6

Pilot BRTS

RAINBOW BRTS

Pedestrian crossings an issue

Pedestrian crossings taken care.

7

Pilot BRTS RAINBOW BRTS

Level boarding was not achieved as regular buses were used with steps inside. Took more time for boarding alighting. Passengers had to wait on road and buses would dock away from bus stop.

Due to high platform height matched with high floor buses with doors on both sides and closed bus stop design with automated sliding doors in buses and bus stops level boarding is achieved.

8

RAINBOW BRTS

Key features• Off board

ticketing• Automated

sliding doors• Passenger

information system

• Route display• Security

RAINBOW BRTS

Rainbow BRTS is more attractive and effective than Pilot BRTS.

10

SAFE TRAVEL

RELIABLE SERVICE

COMFORTABLE TRAVEL

CUSTOMER ORIENTED SERVICE

Rainbow Attributes

Redefine Smart Travel in Public Transport…