Asia-Pacific Partnership
on
Clean Development and Climate
Asia Pacific Partnership
United States of America
Power Generation Task Force
August 13 – 17, 2007
Eddie Duncan
Hydro Operations
Hydroelectric Generation Efficiency
Improvement
Jocassee Rotor Pole Refurbishment
2Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee Runner Upgrade Outage
Generator work
• Pole refurbishment
• Eliminating asbestos
• Replacing class b with class f
insulation
• Discovered improved technique for
pole key removal
• Re-rounding stator
• Re-wedge stator
• Shrink rotor rim
• Replace rim keys
• Currently developing repair and fix for
rotor rim iron bottom support plate
cracks
Jocassee Rotor Pole Refurbishment
3Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Rotor Pole Removal
Jocassee Rotor Pole Refurbishment
4Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Rotor Pole Key Removal Rigs
Jocassee Rotor Pole Refurbishment
5Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Rotor Pole Key Removal Rigs
Jocassee Rotor Pole Refurbishment
6Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Rotor Pole Removal
Jocassee Rotor Pole Refurbishment
7Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Rotor Pole Removal
Jocassee Rotor Pole Refurbishment
8Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Rotor Pole Removal
Jocassee Rotor Pole Refurbishment
9Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Rotor Pole being Lowered
Jocassee Rotor Pole Refurbishment
10Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Rotor Poles Awaiting Shipping
Jocassee Rotor Pole Refurbishment
11Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Rotor Pole Shipping Crates
Jocassee Rotor Pole Refurbishment
12Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Rotor with Poles Removed
Jocassee Rotor Pole Refurbishment
13Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee - Generator Rotor Lift
Jocassee Runner Upgrades
14Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee - Generator Rotor Cross-Section
Jocassee Runner Upgrades
15Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee - Rotor Ledge Supporting Stack Iron
Jocassee Rotor
Ledge Cracking
Jocassee Runner Upgrades
16Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
NEAR MISS!!!
Jocassee - Rotor Ledge Crack and Failure
Jocassee Runner Upgrades
17Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee Damper
Bar Inspections
Jocassee - Damper Bar Cracking Problem
Jocassee Runner Upgrades
18Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee - Damper Bar Cracking Problem
Jocassee Damper
Bar Inspections
Jocassee Runner Upgrades
19Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee Damper
Bar Cracks
Jocassee - Damper Bar Cracking Problem
Jocassee Runner Upgrades
20Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Intake Structures
Jocassee Runner Upgrades
21Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Intake Cylinder Gate (Closed)
Jocassee Runner Upgrades
22Asia Pacific Partnership • Aug 13 - 17, 2007
FirstEnergy Corp. & Duke Energy Corporation
Jocassee – Intake Gate (Lifted Off Seat)
Jocassee Runner Upgrades