View
320
Download
0
Category
Preview:
DESCRIPTION
Citation preview
TSB COMMUNITY MEETING
Where learning is prized, love of school is essential
and boyhood is celebrated
1
TSB COMMUNITY MEETING
Retain the highest standards
Both academically and socially
to prepare our boys for the modern
world..
without losing sight that
each day we are here to celebrate boyhood
Board of Trustees’ Charter
2
TSB COMMUNITY MEETING
Global, digital world
Education is different
“21st Century Learning”
Students learn dynamically
Student driven learning is
innovating curriculum,
teaching and facilities
Our World is Changing…
3
TSB COMMUNITY MEETING
To pursue educational excellence through 21st Century Learning
Town’s Educational Vision
4 “C’s” with the 3 “R’s
Creativity
Critical thinking
Collaboration
Communication
Student centered learning
Real life assessments
4
TSB COMMUNITY MEETING
A Closer Look at 21st Century Learning
What should students
learn?
21st Century skills
Important knowledge
How should students
learn?
Through student-
centered approaches
Through the best of
traditional approaches
5
TSB COMMUNITY MEETING
A Closer Look at 21st Century Learning
Project-Based Learning
Inquiry
Design Thinking
Teaching for
Understanding
Interdisciplinary
connections
Online learning
Space implications
6
TSB COMMUNITY MEETING
9 Points Vision
Professional development and
training
Collaboration and sharing
Curriculum development retreats
Board Education Committee
Academics are enhanced with
technology, collaborative space for
students and teachers, flexible
science labs, and multipurpose rooms
Faculty and Administration “21st” Initiatives
7
TSB COMMUNITY MEETING
Determined our academic priorities
Integrated STEM Center
Interdisciplinary support for faculty and teaching
Collaborative learning through flexible environs
Enhanced hands-on learning opportunities
Elaborate space and utilization studies by faculty, administrators, the
Board’s Education Committee
Engaged architectural team led by award-winning MKThink
Educational clients include Stanford University, Woodside Priory,
Pinewood School, and University of California at Berkeley, among
others
Careful Planning and Evaluation
8
TSB COMMUNITY MEETING
We need more space
We need different space
We need flexible space
We need smart space
Facilities Constrain Future Innovation
9
TSB COMMUNITY MEETING NOV. 2011
TOWN SCHOOL – TODAY ASSEMBLAGE OF 1950’s, 60’s with a dash of 80’s
10
TSB COMMUNITY MEETING NOV. 2011 11
TOWN SCHOOL – TODAY ASSEMBLAGE OF 1950’s, 60’s with a dash of 80’s
TSB COMMUNITY MEETING NOV. 2011 12
TOWN SCHOOL – TODAY ASSEMBLAGE OF 1950’s, 60’s with a dash of 80’s
TSB COMMUNITY MEETING NOV. 2011 13
IMPROVEMENT OVERVIEW
EAST WING CORE – Internal
CORE – Jackson St. WEST WING
TSB COMMUNITY MEETING
Master Plan Timeline
• Summer 2012: EAST WING
STEM Center Wet Lab, Media/Tech Lab, Flex Lab, Math and Seminar Classrooms
Improved Art Center, Seismic strengthening, Theater transformation
• Jun. 2013 – Aug. 2014: NEW CORE
Addition including 6 new classrooms, Lit Center, add science lab, Environ Lab.
Excavation, but not full completion of, the second gym/performing arts space.
• TBD: WEST WING Completion of the second gym/performing arts/multipurpose space,
Deferred building envelope repairs/ replacement
14
TSB COMMUNITY MEETING
AREA ALLOCATION - SUMMARY
EXPANSION RENOVATION Floor 1 11,460 sf 10,750 sf Multi-purpose Room and Support Spaces 8300 sf
Literary Arts Resource Center 2150 sf 700 sf
Jackson St: Lobby and Facade 200 sf 2,500 sf
Modernized Classrooms 2100 sf
Theater Improvements 2000 sf
Floor 2 4,750 sf 16,350 sf New 2nd level and Support Spaces 2,050 sf 2,600
Literary Arts Resource Center 1,850 sf 2,000 sf
Classroom @ Jackson 450 sf
STEM Center, etc 9,900 sf
Floor 3 1,200 sf 6,500 sf Gym Classroom and Support 600 sf 2,000
Internalizing Roof Access Circulation 100 sf
Classrooms at Jackson 550 sf
Fine Art Center 1750 sf
Roof 650 sf
Stair/ Elevator Penthouse 650 sf
Rooftop Learning Garden (n/I gsf) 1700 sf
Current Building gsf 54,540 sf
Improvements gsf 18,060 sf 33,600
Total Proposed Building gsf 72,600 sf
TSB COMMUNITY MEETING NOV. 2011
ENLARGED STEM LAB PLAN
16
STEM CENTER – WET LAB
TSB COMMUNITY MEETING NOV. 2011 17
STEM CENTER - OVERVIEW
TSB COMMUNITY MEETING NOV. 2011 18
LITERARY ARTS CENTER - ENTRY
TSB COMMUNITY MEETING NOV. 2011 19
LITERARY ARTS CENTER – READING ROOM
TSB COMMUNITY MEETING NOV. 2011 20
NEW FLEX / GYM / 480 PERSON THEATER NEW ROOF TOP ENVIRON LAB IMPROVED “LOWER FIELD”
NEW MULTIPURPOSE GYM / THEATER
TSB COMMUNITY MEETING
Gym / Performance Center (seats deployed)
Gym / Performance Center (seats
retracted)
NEW GYM / THEATER – INTERIOR VIEW
TSB COMMUNITY MEETING NOV. 2011
WALLS
Wood Linear Ceiling
ENLARGED FIRST FLOOR LOBBY PLAN
22
NEW LOBBY CONCEPT
TSB COMMUNITY MEETING NOV. 2011
SUNDIAL ON
WALL
WOOD
BENCH
23
JACKSON STREET – NEW ENTRY
TSB COMMUNITY MEETING NOV. 2011
A HOME FOR TOWNS FUTURE TARGET 2014: EXPANDED AND RENOVATED
NEW CORE ADDITION / EXPANSION
24
TSB COMMUNITY MEETING
Academic excellence through 21st Century Learning
State of the art facilities
STEM center
Literary arts center
Multipurpose space for music, performing arts and athletics
Celebrating boyhood through the next generation!
Imagine the New Town School
25
TSB COMMUNITY MEETING
• Financing • East Wing and Core: Capital Campaign $15 million
• West end excavation: Endowment $ 5 million
• Gym Performing Arts Multipurpose Space Future
• Borrowing capacity to manage cash flow $10 million
• East Wing, Core and West end excavation
Financially Feasible
• Budget • East Wing and Core $15 million
• West End excavation $ 5 million
• Gym/Performing Arts Multipurpose Space $ 5 million
26
TSB COMMUNITY MEETING NOV. 2011
A HOME FOR TOWNS FUTURE TARGET 2014: EXPANDED AND RENOVATED
NEW CORE ADDITION / EXPANSION
27
TSB COMMUNITY MEETING
Where learning is prized, love of school is essential
and boyhood is celebrated
28
TSB COMMUNITY MEETING NOV. 2011 29
FOLLOWING:
EXTRA SLIDES – NOT INTENDED FOR
PRESENTATION
TSB COMMUNITY MEETING NOV. 2011
Schematic Project Phasing
EXISTING PHASE 1 6/1/2012 – 8/30/2012
INTERIOR IMPROVEMENTS, ART
ROOM
THEATER FOUNDATION, SEISMIC
UPGRADES, IN-KIND WINDOW
REPLACEMENT
PHASE 2 (PART 2A) 6/1/2013 – 8/30/2014
CORE & EXCAVATION
SPRINKLER & HVAC
UPGRADES
PHASE 2 (PART 2B) Within 6/1/2013-8/30/2014
EXCAVATION BUILDOUT
PHASE 3 Within 6-9 Yrs of Conditional Use Approval
FAÇADE EXPANSION & SUNSHADING
PREVIOUS
PHASE
30
TSB COMMUNITY MEETING NOV. 2011
NEW CORE ADDITION / EXPANSION
31
JACKSON STREET
TSB COMMUNITY MEETING NOV. 2011 32
TSB COMMUNITY MEETING NOV. 2011
Where learning is prized, love
of school is essential and
boyhood is celebrated
33
TSB COMMUNITY MEETING
“Learning Today”
Music & Performing
Arts
Athletics, Health and
Wellness
Literary Arts
Science, Technology,
Engineering & Math
(STEM)
• Critical Thinking
• Collaboration
• Innovation
• Creativity
• Communication
9
Building for Boys – A Home for Town’s Future
34
TSB COMMUNITY MEETING NOV. 2011 35
TOWN SCHOOL – TODAY ASSEMBLAGE OF 1950’s, 60’s with a dash of 80’s
Recommended