Vacuum Vessel supported and in position to receive left MCWF

Preview:

DESCRIPTION

Vacuum Vessel supported and in position to receive left MCWF. Left MCWF moved into position by overhead crane. Left support cart moved into position. Load supported and crane removed. Right MCWF moved into position by overhead crane. - PowerPoint PPT Presentation

Citation preview

Vacuum Vessel supported and in position to receive left

MCWF

Left MCWF moved into position by overhead crane

Left support cart moved into position. Load supported and

crane removed

Right MCWF moved into position by overhead crane

Right support cart moved into position. Load

supported and crane removed. Shim

measurements taken.

Right MCWF supported by crane. Right support cart

removed and MCWF backed off 13” (position #38).

Right cart support posts removed and posts for position #38 location installed on cart.

Cart positioned and load supported. Crane removed and

shim installed on left MCWF

Load supported by crane and right support

cart removed.

Right MCWF moved into final position by crane. Right cart supports exchanged and initial supports reinstalled. Cart repositioned under MCWF. Load supported by cart, crane removed and final bolting of interface joint occurs

AirLoc Wedgemount bolt on spherical seat precision leveler

Hilman Roller

Guide Roller