View
2
Download
0
Category
Preview:
Citation preview
17TH ST 16TH ST
16TH ST
NOE ST
NOE ST
CAST
RO ST
CAST
RO ST
MARKET ST
MARKET ST
15TH ST
15TH ST
SANCH
EZ ST
SANCH
EZ ST
MARKET ST MARKET ST
14TH ST
14TH ST
CHUR
CH ST
DOLO
RES S
T
BUCH
ANAN
ST
DUBOCE BIKEWAY
DUBOCE AVE
CHUR
CH ST
MARKET ST MARKET ST
17TH ST
Improved Roadway Striping and Markings1. Add green paint to existing bike lane 2. Reduce door zone hazard for bike lane (restricts parking)3. Existing painted safety zone, to remain
Upper Market Street Safety ProjectProject Proposal - Market Street at Noe/16th Streets
MARKET AT NOE/16TH
PROPOSED CHANGES
Feet0 100
Sidewalk and Concrete Improvements4. Concrete curb extension5. Boarding island thumbnail island6. Reconstructed curb extension and curb ramp (fi xes improperly
constructed curb extension)
1.
1.
1.
1.
3.4. 4.
4.
5.
5.
6.2.
2.
17TH ST 16TH ST
16TH ST
NOE ST
NOE ST
CAST
RO ST
CAST
RO ST
MARKET ST
MARKET ST
15TH ST
15TH ST
SANCH
EZ ST
SANCH
EZ ST
MARKET ST MARKET ST
14TH ST
14TH ST
CHUR
CH ST
DOLO
RES S
T
BUCH
ANAN
ST
DUBOCE BIKEWAY
DUBOCE AVE
CHUR
CH ST
MARKET ST MARKET ST
17TH ST
Improved Roadway Striping and Markings1. Add green paint to existing bike lane 2. Reduce door zone hazard for bike lane (restricts parking)3. Existing painted safety zone, to remain
Upper Market Street Safety ProjectProject Proposal - Market Street at Noe/16th Streets
MARKET AT NOE/16TH
PROPOSED CHANGES
Feet0 100
Sidewalk and Concrete Improvements4. Concrete curb extension5. Boarding island thumbnail island6. Reconstructed curb extension and curb ramp (fi xes improperly
constructed curb extension)
1.
1.
1.
1.
3.4. 4.
4.
5.
5.
6.2.
2.
17TH ST 16TH ST
16TH ST
NOE ST
NOE ST
CAST
RO ST
CAST
RO ST
MARKET ST
MARKET ST
15TH ST
15TH ST
SANCH
EZ ST
SANCH
EZ ST
MARKET ST MARKET ST
14TH ST
14TH ST
CHUR
CH ST
DOLO
RES S
T
BUCH
ANAN
ST
DUBOCE BIKEWAY
DUBOCE AVE
CHUR
CH ST
MARKET ST MARKET ST
17TH ST
Upper Market Street Safety ProjectProject Proposal - Market Street at Sanchez/15th Streets
MARKET AT SANCHEZ/15TH
PROPOSED CHANGES
Feet0 100
Improved Roadway Striping and Markings1. Add green paint to existing bike lane 2. Reduce door zone hazard for bike lane (restricts parking)3. Improve sight distance for Walgreen’s driveway (restricts
parking)4. Green bike box with lead-in bike lane
Sidewalk and Concrete Improvements 5. Concrete curb extension
1.
1.1.
1.1. 2. 3.
3.
3.
4.
4.
5.5.
5.5.
17TH ST 16TH ST
16TH ST
NOE ST
NOE ST
CAST
RO ST
CAST
RO ST
MARKET ST
MARKET ST
15TH ST
15TH ST
SANCH
EZ ST
SANCH
EZ ST
MARKET ST MARKET ST
14TH ST
14TH ST
CHUR
CH ST
DOLO
RES S
T
BUCH
ANAN
ST
DUBOCE BIKEWAY
DUBOCE AVE
CHUR
CH ST
MARKET ST MARKET ST
17TH ST
Upper Market Street Safety ProjectProject Proposal - Market Street at Church/14th Streets
MARKET AT CHURCH/14TH
PROPOSED CHANGES
Feet0 100
Improved Roadway Striping and Markings1. Add green paint to existing bike lane 2. Improve sight distance for Walgreen’s driveway (restricts
parking)
Sidewalk and Concrete Improvements3. Concrete curb extension
1. 1.
1. 1.1.2.
3.
17TH ST 16TH ST
16TH ST
NOE ST
NOE ST
CAST
RO ST
CAST
RO ST
MARKET ST
MARKET ST
15TH ST
15TH ST
SANCH
EZ ST
SANCH
EZ ST
MARKET ST MARKET ST
14TH ST
14TH ST
CHUR
CH ST
DOLO
RES S
T
BUCH
ANAN
ST
DUBOCE BIKEWAY
DUBOCE AVE
CHUR
CH ST
MARKET ST MARKET ST
17TH ST
Upper Market Street Safety ProjectProject Proposal - Market Street at Duboce/Buchanan
MARKET AT DUBOCE/BUCHANAN
PROPOSED CHANGES
Feet0 100
Improved Roadway Striping and Markings1. Add green paint to existing bike lane2. Reduce door zone hazard for bike lane (restricts parking)3. Parking-protected bike lane (see page 5 for details)
Sidewalk and Concrete Improvements4. Realign/straighten crosswalk and reconstruct curb ramps5. Reconstruct Dolores Street median island for improved
accessibility and emergency vehicle access
2.
1.
1.1. 1.
4.
3.
5.
Passenger LoadingBlue ZoneGreen Zone
Green Zone Green Zone
Green Zone
Median to include mountable curbs or be installed as flexible bollards pending final Fire Department review
Four (4) parking spaces removed this block for bikeway
Upper Market Street Safety ProjectProject Proposal - Market Street from Dubcoe to Guerrero/Laguna/Hermann
PROPOSED CHANGES
Improved Roadway Striping and Markings1. Parking-protected bike lane2. Add green paint to existing bike lane3. Intersection wayfi nding markings4. Midblock no-parking zone - designated Fire Safety Zone
Sidewalk and Concrete Improvements5. New curb ramp for accessibility to parking-protected bike lane loading/buffer zone6. Concrete curb extension7. Extend concrete median on Guerrero Street8. Expand Muni boarding island9. Reduce sidewalk width/cut back curb edge\10. Mountable concrete island - cycletrack entryway11. Reconfi gure pedestrian island at Laguna/Hermann
2.
8.
9.
10.
Feet0 100
1.3.4.
5.
6.
7.
11.
Upper Market Street Safety ProjectProject Proposal - Market Street from Dubcoe to Guerrero/Laguna/Hermann
Passenger LoadingBlue ZoneGreen Zone
Green Zone Green Zone
Green Zone
Median to include mountable curbs or be installed as flexible bollards pending final Fire Department review
Four (4) parking spaces removed this block for bikeway
Upper Market Street Safety ProjectProject Proposal - Market Street from Guerrero/Laguna/Hermann to Octavia Boulevard
PROPOSED CHANGES
Feet0 100
Improved Roadway Striping and Markings
1. Parking-protected bike lane2. Intersection wayfi nding markings3. Green bike box4. Midblock no-parking zone - designated Fire Safety Zone
Sidewalk and Concrete Improvements5. New curb ramp for accessibility to parking-protected bike lane loading/buffer zone6. Concrete curb extension7. Reduce plaza size, install bike channel w/ large protection island8. Reduce sidewalk width/cut back curb bulb-out edge to allow for straight path for bikes9. Mountable concrete island - cycletrack entryway10. Fill in bike channel through Octavia median, reroute bike lane and improve bike crossing of
Market Street11. Mountable median to protect bike lane on NB Octavia frontage road12. Octavia/Market intersection reconfi guration - new pedestrian islands
2.
7.8.
10.
1.
1.
3.
4.
4.
5.
6.6.
9.
12.
10.
Recommended