7
16TH ST 16TH ST NOE ST NOE ST MARKET ST MARKET ST Improved Roadway Striping and Markings 1. Add green paint to existing bike lane 2. Reduce door zone hazard for bike lane (restricts parking) 3. Existing painted safety zone, to remain Upper Market Street Safety Project Project Proposal - Market Street at Noe/16th Streets MARKET AT NOE/16TH PROPOSED CHANGES Feet 0 100 Sidewalk and Concrete Improvements 4. Concrete curb extension 5. Boarding island thumbnail island 6. Reconstructed curb extension and curb ramp (fixes improperly constructed curb extension) 1. 1. 1. 1. 3. 4. 4. 4. 5. 5. 6. 2. 2.

Upper Market Project Proposal - SFMTA · 2019. 12. 19. · MARKET ST MARKET ST 17TH ST Improved Roadway Striping and Markings 1. Add green paint to existing bike lane 2. Reduce door

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Upper Market Project Proposal - SFMTA · 2019. 12. 19. · MARKET ST MARKET ST 17TH ST Improved Roadway Striping and Markings 1. Add green paint to existing bike lane 2. Reduce door

17TH ST 16TH ST

16TH ST

NOE ST

NOE ST

CAST

RO ST

CAST

RO ST

MARKET ST

MARKET ST

15TH ST

15TH ST

SANCH

EZ ST

SANCH

EZ ST

MARKET ST MARKET ST

14TH ST

14TH ST

CHUR

CH ST

DOLO

RES S

T

BUCH

ANAN

ST

DUBOCE BIKEWAY

DUBOCE AVE

CHUR

CH ST

MARKET ST MARKET ST

17TH ST

Improved Roadway Striping and Markings1. Add green paint to existing bike lane 2. Reduce door zone hazard for bike lane (restricts parking)3. Existing painted safety zone, to remain

Upper Market Street Safety ProjectProject Proposal - Market Street at Noe/16th Streets

MARKET AT NOE/16TH

PROPOSED CHANGES

Feet0 100

Sidewalk and Concrete Improvements4. Concrete curb extension5. Boarding island thumbnail island6. Reconstructed curb extension and curb ramp (fi xes improperly

constructed curb extension)

1.

1.

1.

1.

3.4. 4.

4.

5.

5.

6.2.

2.

Page 2: Upper Market Project Proposal - SFMTA · 2019. 12. 19. · MARKET ST MARKET ST 17TH ST Improved Roadway Striping and Markings 1. Add green paint to existing bike lane 2. Reduce door

17TH ST 16TH ST

16TH ST

NOE ST

NOE ST

CAST

RO ST

CAST

RO ST

MARKET ST

MARKET ST

15TH ST

15TH ST

SANCH

EZ ST

SANCH

EZ ST

MARKET ST MARKET ST

14TH ST

14TH ST

CHUR

CH ST

DOLO

RES S

T

BUCH

ANAN

ST

DUBOCE BIKEWAY

DUBOCE AVE

CHUR

CH ST

MARKET ST MARKET ST

17TH ST

Improved Roadway Striping and Markings1. Add green paint to existing bike lane 2. Reduce door zone hazard for bike lane (restricts parking)3. Existing painted safety zone, to remain

Upper Market Street Safety ProjectProject Proposal - Market Street at Noe/16th Streets

MARKET AT NOE/16TH

PROPOSED CHANGES

Feet0 100

Sidewalk and Concrete Improvements4. Concrete curb extension5. Boarding island thumbnail island6. Reconstructed curb extension and curb ramp (fi xes improperly

constructed curb extension)

1.

1.

1.

1.

3.4. 4.

4.

5.

5.

6.2.

2.

Page 3: Upper Market Project Proposal - SFMTA · 2019. 12. 19. · MARKET ST MARKET ST 17TH ST Improved Roadway Striping and Markings 1. Add green paint to existing bike lane 2. Reduce door

17TH ST 16TH ST

16TH ST

NOE ST

NOE ST

CAST

RO ST

CAST

RO ST

MARKET ST

MARKET ST

15TH ST

15TH ST

SANCH

EZ ST

SANCH

EZ ST

MARKET ST MARKET ST

14TH ST

14TH ST

CHUR

CH ST

DOLO

RES S

T

BUCH

ANAN

ST

DUBOCE BIKEWAY

DUBOCE AVE

CHUR

CH ST

MARKET ST MARKET ST

17TH ST

Upper Market Street Safety ProjectProject Proposal - Market Street at Sanchez/15th Streets

MARKET AT SANCHEZ/15TH

PROPOSED CHANGES

Feet0 100

Improved Roadway Striping and Markings1. Add green paint to existing bike lane 2. Reduce door zone hazard for bike lane (restricts parking)3. Improve sight distance for Walgreen’s driveway (restricts

parking)4. Green bike box with lead-in bike lane

Sidewalk and Concrete Improvements 5. Concrete curb extension

1.

1.1.

1.1. 2. 3.

3.

3.

4.

4.

5.5.

5.5.

Page 4: Upper Market Project Proposal - SFMTA · 2019. 12. 19. · MARKET ST MARKET ST 17TH ST Improved Roadway Striping and Markings 1. Add green paint to existing bike lane 2. Reduce door

17TH ST 16TH ST

16TH ST

NOE ST

NOE ST

CAST

RO ST

CAST

RO ST

MARKET ST

MARKET ST

15TH ST

15TH ST

SANCH

EZ ST

SANCH

EZ ST

MARKET ST MARKET ST

14TH ST

14TH ST

CHUR

CH ST

DOLO

RES S

T

BUCH

ANAN

ST

DUBOCE BIKEWAY

DUBOCE AVE

CHUR

CH ST

MARKET ST MARKET ST

17TH ST

Upper Market Street Safety ProjectProject Proposal - Market Street at Church/14th Streets

MARKET AT CHURCH/14TH

PROPOSED CHANGES

Feet0 100

Improved Roadway Striping and Markings1. Add green paint to existing bike lane 2. Improve sight distance for Walgreen’s driveway (restricts

parking)

Sidewalk and Concrete Improvements3. Concrete curb extension

1. 1.

1. 1.1.2.

3.

Page 5: Upper Market Project Proposal - SFMTA · 2019. 12. 19. · MARKET ST MARKET ST 17TH ST Improved Roadway Striping and Markings 1. Add green paint to existing bike lane 2. Reduce door

17TH ST 16TH ST

16TH ST

NOE ST

NOE ST

CAST

RO ST

CAST

RO ST

MARKET ST

MARKET ST

15TH ST

15TH ST

SANCH

EZ ST

SANCH

EZ ST

MARKET ST MARKET ST

14TH ST

14TH ST

CHUR

CH ST

DOLO

RES S

T

BUCH

ANAN

ST

DUBOCE BIKEWAY

DUBOCE AVE

CHUR

CH ST

MARKET ST MARKET ST

17TH ST

Upper Market Street Safety ProjectProject Proposal - Market Street at Duboce/Buchanan

MARKET AT DUBOCE/BUCHANAN

PROPOSED CHANGES

Feet0 100

Improved Roadway Striping and Markings1. Add green paint to existing bike lane2. Reduce door zone hazard for bike lane (restricts parking)3. Parking-protected bike lane (see page 5 for details)

Sidewalk and Concrete Improvements4. Realign/straighten crosswalk and reconstruct curb ramps5. Reconstruct Dolores Street median island for improved

accessibility and emergency vehicle access

2.

1.

1.1. 1.

4.

3.

5.

Page 6: Upper Market Project Proposal - SFMTA · 2019. 12. 19. · MARKET ST MARKET ST 17TH ST Improved Roadway Striping and Markings 1. Add green paint to existing bike lane 2. Reduce door

Passenger LoadingBlue ZoneGreen Zone

Green Zone Green Zone

Green Zone

Median to include mountable curbs or be installed as flexible bollards pending final Fire Department review

Four (4) parking spaces removed this block for bikeway

Upper Market Street Safety ProjectProject Proposal - Market Street from Dubcoe to Guerrero/Laguna/Hermann

PROPOSED CHANGES

Improved Roadway Striping and Markings1. Parking-protected bike lane2. Add green paint to existing bike lane3. Intersection wayfi nding markings4. Midblock no-parking zone - designated Fire Safety Zone

Sidewalk and Concrete Improvements5. New curb ramp for accessibility to parking-protected bike lane loading/buffer zone6. Concrete curb extension7. Extend concrete median on Guerrero Street8. Expand Muni boarding island9. Reduce sidewalk width/cut back curb edge\10. Mountable concrete island - cycletrack entryway11. Reconfi gure pedestrian island at Laguna/Hermann

2.

8.

9.

10.

Feet0 100

1.3.4.

5.

6.

7.

11.

Page 7: Upper Market Project Proposal - SFMTA · 2019. 12. 19. · MARKET ST MARKET ST 17TH ST Improved Roadway Striping and Markings 1. Add green paint to existing bike lane 2. Reduce door

Upper Market Street Safety ProjectProject Proposal - Market Street from Dubcoe to Guerrero/Laguna/Hermann

Passenger LoadingBlue ZoneGreen Zone

Green Zone Green Zone

Green Zone

Median to include mountable curbs or be installed as flexible bollards pending final Fire Department review

Four (4) parking spaces removed this block for bikeway

Upper Market Street Safety ProjectProject Proposal - Market Street from Guerrero/Laguna/Hermann to Octavia Boulevard

PROPOSED CHANGES

Feet0 100

Improved Roadway Striping and Markings

1. Parking-protected bike lane2. Intersection wayfi nding markings3. Green bike box4. Midblock no-parking zone - designated Fire Safety Zone

Sidewalk and Concrete Improvements5. New curb ramp for accessibility to parking-protected bike lane loading/buffer zone6. Concrete curb extension7. Reduce plaza size, install bike channel w/ large protection island8. Reduce sidewalk width/cut back curb bulb-out edge to allow for straight path for bikes9. Mountable concrete island - cycletrack entryway10. Fill in bike channel through Octavia median, reroute bike lane and improve bike crossing of

Market Street11. Mountable median to protect bike lane on NB Octavia frontage road12. Octavia/Market intersection reconfi guration - new pedestrian islands

2.

7.8.

10.

1.

1.

3.

4.

4.

5.

6.6.

9.

12.

10.