University of Chicago as an APA Factory Site · Extra Slides showing SBND Grounding Mesh 16 The...

Preview:

Citation preview

University of Chicago as an APA Factory Site

APA Workshop @ DaresburyFebruary 5, 2018

David Schmitz, Ed Blucher, Ben StillwellUniversity of Chicago

Brief Intro•  General plan in the US is to set up multiple APA factories to

produce 150 APAs (enough for a 10kt DUNE module)-  ½ the first module and ½ the second module

-  with the other halves produced here in the UK

•  PSL, Chicago, Yale -  PSL is, of course, already a working assembly line

-  I’ll talk about UChicago as a possible site for additional assembly lines and the next talk will introduce Yale

•  In this talk-  Photo tour of campus facilities

-  A look at possible layouts of APA assembly lines

-  Example of a past project and summary of local resources

January 31, 20182

Campus Layout

January 31, 20183

HEPOffices HighBay

HEP HighBay

Student,faculty,andengineerofficesareonthesamequadasthehighbay.Undergroundtunnelconnectsbuildings.

High bay

January 31, 20184

5-tonauxiliarycrane,+250-tonhooksrunsfulllength,includingovertheelevatedareainforeground

cleanlabspaceinsidethehighbay

elevatedworking/storageareamachineshopunderneath

Mezzanine

January 31, 20185

Goodspaceforstorageof:•  bareframesawaiLngwiring•  wiredframesawaiLngshipping•  shippingcrates,etc.

AlsopossiblyframeprepstaLons(e.g.meshapplicaLon,etc.)

Interior Lab

January 31, 20186

•  IndependentHVACsystem•  GoodlighLngforwork•  MulLplehoistsoverhead•  Roofcomesoffwhenuseof

buildingcranerequired

High Bay and Shipping/Receiving Area Door

January 31, 20187

January 31, 20188

18.4m

29.2m

12.8m

14.3m

9.3m

12.9m

Mezzanine

InteriorLab

OpenHighBay

RollupDoor

APA Factory Layout Option #1

January 31, 20189

12.8m

14.3m

FrameStorage&

Prep

2WindersinHighBay

APA Factory Layout Option #1

January 31, 201810

12.8m

14.3m

FrameStorage&

Prep

2WindersinHighBay

APA Factory Layout Option #2•  Modify the existing interior space to

be a “wiring lab”

•  Extend length of lab and add a high, wide door exiting to high bay

•  Clear advantages to working in this climate controlled, clean, well-lit space

•  Leaves open high bay area just outside lab dedicated to shipping, receiving and prepping frames for wiring

January 31, 201811

APA Factory Layout Option #2

January 31, 201812

12.8m

14.3m

FrameStorage&

Prep

FrameShipping&Prep

2WindersinInteriorLab

WiringLab

APA Factory Layout Option #2

January 31, 201813

12.8m

14.3m

FrameStorage&

Prep

FrameShipping&Prep

2WindersinInteriorLab

WiringLab

Double Chooz Construction @ Chicago•  Double Chooz muon tracking system was

constructed in these same spaces @ UC-  3 year construction project from 2008-2010.

-  Built 130 4m x 1.6m scintillator strip modules now in use at DC, ICARUS, and ProtoDUNE.

-  Project team: 1 faculty + 2 PDs + full-time technician + supporting engineer + ~6 undergraduates at any given time (30+ students throughout the project)

January 31, 201814

More Details on Local Resources•  University of Chicago campus is 45 miles from Fermilab and 25

miles from Argonne National Lab

•  Construction area is right on campus, adjacent to HEP group offices (faculty, postdocs, students)

•  Full machine shop connected to high bay; also many professional machining companies in Chicago area

•  Electrical shop connected to high bay mezzanine

•  Several smaller side and local labs for test or prep work

•  Strong mechanical engineering team (working closely now with PSL, experience designing SBND APAs)

•  Lots of undergraduate students looking for research related work

January 31, 201815

Extra Slides showing SBND Grounding Mesh

16

TheSBNDmeshisasimple“windowframe”designconstructedfrom1”angleironstockanda1/16”coverframe.ItboltsinsidetheAPAframeopeningswith8xM5bolts.InterferencewithPMTboxesbehindisimportant,butwasn’ttoohardtoavoid(SBNDframesareone-sidedand6”deep).ThefollowingphotosshowaprototypeframemachinedandassembledbyundergraduatesatUChicago.

TPCMeeLngDecember12,2017

TylerJohnson,JohnMagnus-Sharpe,DaveSchmitz

APA Grounding Mesh

17Dec12,2017

18

SBND Grounding Mesh

Dec12,2017

19

SBND Grounding Mesh

Dec12,2017

1”x1”anglestainlessbase(4pieces)1/16”stainlessfrontcover(4pieces)Cornerbrackets(4pieces)AiachestobacksideofAPAwith8M5s

20

Test Fit in APA

Dec12,2017

8M5screws

You’renotgoingblind,thiswasbeforethemeshwasgluedin.

21

Test Fit in APA

Dec12,2017

Recommended