Unique Dredging and Placement Projects1

Unique Dredging and Placement

Projects

Presented by

Wendell Mears

October 22, 2015

Unique Dredging and Placement Projects2

• Dredging Basics, A Short Review

• On-site Aquatic Placement

• Confined Aquatic Disposal

• Beneficial Use Sites

• Coastal Mississippi: An Update

Presentation Overview

Unique Dredging and Placement Projects3

In situ, Intermediate, and End State

Review—A Yard Is Not a Yard Is Not a Yard

Unique Dredging and Placement Projects4

On-site Placement

Unique Dredging and Placement Projects5

Inner Harbor Berths

Unique Dredging and Placement Projects6

Dredging Method

Unique Dredging and Placement Projects7

Commercial Landfill

• Regulations

– Federal: U.S. Environmental

Protection Agency (USEPA)

– State: DEP, DEQ, etc.

– Local

• Processing for transport

– Additives (e.g., Portland cement,

etc.)

• Transport

– Marine

– Truck

– Rail

Unique Dredging and Placement Projects8

On-site Placement

• Regulations

– Federal: USEPA

– State: DEP, DEQ, etc.

– Local

• Transport

– Barge

– Truck and rail

– Conveyor

Unique Dredging and Placement Projects9

On-site Placement

• Measurement and payment

– Cubic yard (CY) in situ

• Liabilities and risks

– Owner vs. landfill

– Managed risks

• Contaminant stability

– AVS SEM

– Hydric conditions

Unique Dredging and Placement Projects10

On Site Placement for Restoration

• Location

• Size

• Sediment Properties

• Dredge Size

• Decant & Water Quality

• Return Waters

• Operations & Management

Location, location, location

Unique Dredging and Placement Projects11

Confined Aquatic Sites

Unique Dredging and Placement Projects12

Unique Dredging and Placement Projects13

13

Port Hueneme Impacted Sediment Locations

Oxnard Harbor District

Naval Base Ventura County

USACE Federal

Channel

Unique Dredging and Placement Projects14

14

Construction Sequence

Naval Base Ventura County

Oxnard Harbor District

Unique Dredging and Placement Projects15

15

Step 1: Excavate

Cell

Beach

Nourishment

CAD Excavation

Unique Dredging and Placement Projects16

16

Step 2: Place Contaminated

Sediment in Cell

Contaminated Sediment Dredging

Unique Dredging and Placement Projects17

17

Step 3: Place Cap

Material

CAD Cell Capping

Unique Dredging and Placement Projects18

Port Hueneme CAD Cross Section

-85’ MLLW

-56’ MLLW

-46’ MLLWClean

Cap

Contaminated

Sediments

-43’ MLLW

Unique Dredging and Placement Projects19

Beneficial Use Sites

Unique Dredging and Placement Projects20

Beneficial Use (BU)

• Beach nourishment

• Agriculture and products

– Topsoil

– Aquaculture

• Berms

– Stable and feeder

• Land creation

• Land improvement

• Marsh and intertidal habitat

Unique Dredging and Placement Projects21

BU Marsh Design

• Design Considerations

– Foundation

– Dredge material properties

– Placement methods

– Density phases

• Lessons learned

– Marsh now

– Larger sites and adaptive

management

Unique Dredging and Placement Projects22

Coastal Mississippi: An Update

Unique Dredging and Placement Projects23

• 2001 & 2002

– USACE and DMR identify potential BU sites

– Develops Master Plan for BU in Mississippi

– Deer Island identified as a pilot project and completed in 2003

• 2008

– Beneficial Users Group (BUG) formed

– State and federal agencies, co-chaired by DMR and USACE

– Private stakeholders (e.g., local ports)

• 2010

– BUG recommends revised legislation

– House Bill 1440 passed March 2010

– Coastal Wetlands Protection Act § 49-27-61,

History and the BU Law

Unique Dredging and Placement Projects24

Deer Island Marsh Creation

Project: 2001 to 2003

• Components:

– 7- to 8-foot-high dike

– Easterly wing dike

– Flash board riser weirs

– Offset to provide bayou

• Dredged material from Biloxi

Lateral Channel

• Approximately 40 acres were

filled with 365,000 cy of

sediment

Unique Dredging and Placement Projects25

Pre-Katrina

Unique Dredging and Placement Projects26

Post-Katrina

Unique Dredging and Placement Projects27

Deer Island BU and Port of Gulfport 2012

• Designed with DMR, Port, and

Stakeholders

• USACE rebuilt existing cell under

MsCIP

• Refill existing BU cell and construct

additional expansion area BU cell

– Open at the western end to encourage

circulation and habitat development

– Can be expanded for additional material

– Mimics the historic 1850s footprint

– Intertidal plant species

– Chenier for nesting

Unique Dredging and Placement Projects28

Port of Gulfport—2012 Restoration

Unique Dredging and Placement Projects29

Deer Island BU Construction 2012

Unique Dredging and Placement Projects30

Port of Gulfport—2012 Restoration (cont.)

Unique Dredging and Placement Projects31

Current Views

Unique Dredging and Placement Projects32

Current Views

Unique Dredging and Placement Projects33

BU to Enhance Existing Marsh

Illustration of conceptual model for marsh

recovery after thin-layer disposal

Unique Dredging and Placement Projects34

Regional Sediment Management Sites

Unique Dredging and Placement Projects35

Questions /Discussion