CITY ENGINEERING & PUBLIC WORKS DEPARTMENT
Engr. Benjamin L. AcederaCity Engineer
The City Engineering and Public Works Department shall be in-charge of theinfrastructure development and public works in general of the local government unit to includethe administration, coordination, supervision and control of construction, maintenance,improvement and repair of roads, bridges and other engineering and public works projects. Fromsurvey works to planning and programming down to monitoring of these infrastructure projectsare among the tasks that were performed by the whole department in order to complete theprojects. The projects were categorized into City Projects by Contract, City Project byAdministration, road concreting, farm to market roads, construction of administration’s majorprojects, installation of streetlights, installation of water system and maintenance services. Thedepartment prepares program of works for barangay projects upon request. There are 145finished projects, 11 ongoing projects, and six (6) bidded projects while there are 153 finishedbarangay projects as per record.
All projects being accomplished are as follows.
CITY PROJECT BY ADMINISTRATION
LOCATION NAME OF PROJECTS DESCRIPTION PROJECTCOSTS STATUS
Assessor’sOffice, CGC
Fabrication ofShelves
Fabrication of shelves: 1 unit-1.50m x 2.45m,1 unit-3.27m x 7.60m, including painting and1 unit fabricated stainless ladder.
98,000.00 Finished
CGCGuinobatan
Rehabilitation ofCity College Building
Repair of school building: works included:dismantling of damaged ceiling panels,carpentry works, door and window
73,350.00 Finished
UPDD, CGC Renovation ofPantryRenovation of pantry including fabricationand installation of cabinet 27,300.00 Finished
LegislativeBldg.,
Guinobatan
Improvement of SPSecretary’s Office
Works included: fabrication & installation ofcabinets and backdrop, installation of glasspartition, electrical works and painting works.
150,000.00 Finished
Guinobatan Improvement ofStageImprovement of 62.90 sq .m. stage ( roofingsand stage back wall) 98,420.00 Finished
City HallCompound,Guinobatan
Repainting ofBasketball/Volleybal
l Court
Repainting of 21 m x 28m basketball courtand 9.0m x18.0m volleyball court 4,050.00 Finished
Canubing IElem. School,Canubing I
Rehabilitation ofStage
Rehabilitation of existing 8.86m x 6.0m stageroofing and ceiling including paintings. 50,187.50 Finished
[Type the document title]
Old City Hall,Ibaba East
Rehabilitation ofWaterline
Rehabilitation of Waterline at Old City HallBuilding
31,900.00 Finished
FSRECCompound,
Biga
Rehab of Facilitiesof FSREC
Replacement of damaged window and ceiling,including painting due to typhoon “Nona” 54,900.00 Finished
OldCemetery,
Lalud
Clearing of OldCemetery
Labor for clearing of 40,000 sq.m. oldcemetery including trimming/cutting of smalltrees.
52,000.00 Finished
City Proper Fabrication of NoParking SignageFabrication of parking signage: 36 units – 24”x 18’ x 6” 99,700.00 Finished
City PublicMarket
Improvement ofPublic Market
Repair of handrail including steps for steelstair and steel gate for cistern tank
94,500.00 Finished
AdriaticoMem. School
Installation of SteelGrills
Installation of 24.91 lm perimeter grills forcorridor, 1 m high and 2m x 2m steel doorand 4.2m x 2.2m grills for stair handrail
93,300.00 Finished
City PublicMarket Repair of Escalator Repair of two units escalator 690,900.00 Finished
LegislativeBldg.,
Guinobatan
Repainting of ABCPresident’s Office
Repainting of ABC President’s Office with anarea of 210 sq. m. 7,750.00 Finished
BonifacioSt.Ibaba East
DrainageConstruction-
Additional Work
Construction of 4.40Lm x 0.60m coveredcanal w/ manhole, inlets and catch basin andconstruction of 4.40Lm curbs and gutterincluding 10.70m x 0.70m canal cover
50,000.00 Finished
City Proper Installation ofWooden Frame
Supply of materials for installation 3-units 10'x 12' wooden for the promotion of activitiesfor City Fiesta 2016
8,700.00 Finished
LegislativeBldg.Guinoba
tan
Repainting of SPInformation Office
Repainting of SP Information Office w/an areaof 249.93sq.m 19,400.00 Finished
LegislativeBldg.Guinoba
tan
Improvement ofVice Mayor's Office
Improvement of office, works included:installation of glass partition, repair of ceiling,cr, pantry, installation of backdrop and supplyof fabricated furnitures.
350,000.00 Finished
LegislativeBldg.Guinoba
tan
Improvement ofCity Councilor's
Office
Improvement of office, works included: repairof cr(flooring), ceiling, fabrication ofcabinet,partition w/glass and office tablew/drawer, chair including painting at Coun.Flores’ Office.
68,600.00 Finished
Coun.BrucalOffice,
LegislativeBldg.Guinoba
tan
Improvement ofCity Councilor's
Office
Improvement of office, works included:fabrication of drop ceiling, counter topcabinet, partition w/ glass, sliding door glassand painting
86,100.00 Finished
Slaughter Fabricated Fabricated 4ft wide x 10ft long x 35" height 30,000.00 Finished
[Type the document title]
House, Tibag Inspection Table stainless table
Baruyan Fabrication ofDetachable TentFabrication of 1 unit 6.0m x 9.0m detachabletent w/ paintings 47,000.00 Finished
City College Fabrication ofSignages w/ Plan 1 unit 1.53mx2.13m signage with paintings 9,000.00 Finished
CGC Fabrication of FloatSupply of materials and labor for thefabrication of float for the Search of Mutya ngLungsod 2016
96,000.00 Finished
OMNHS Fabrication andInstallation of Stage
Supply of materials and labor for thefabrication and installation of stage for theSeacrh of Mutya ng Lungsod 2016
63,900.00 Finished
BigaRehabilitation ofFacilities of FSREC
Compound
Works included: Replacement of windows ofScience Research Bldg. Extension & Ceiling.Repair of roof for Nursery Bldg. includingpainting due to typhoon Nona
142,300.00 Finished
New City HallCompound,
Brgy.Guinobatan,Calapan City
Additional Worksfor Rehab of City
College
Supply & installation of electrical for faculty,Research & Library Room & replacements of2-units doors & windows and anay treatment
for door jamb at City Youth Office
50,600.00 Finished
City Plaza,Ibaba East
Repainting ofVolleyball Court Repainting of 9m x 18m volleyball court 9,700.00 Finished
BBRIS MainCanal, Naujan
Desilting of Baco-Bucayao River
Irrigation SystemBBRIS
Rental of equipment for the immediatedesilting of BBRIS Main Canal for theprovision of irrigation to Calapan City Farmersaffected by Typhoon Nona partnership withinthe National Irrigation Administration
280,000.00 Finished
Old City HallBuilding,Ibaba East
Rehabilitation ofRoof & Gutter
Rehabilitation of roofing and gutter at secondfloor Old City Hall Building 88,400.00 Finished
New City HallCompound,Guinobatan
Rehabilitation ofExecutive Building
Repair of executive building work in includeddismantling of damage roofing panels ceilingcarpentry works and concrete gutter
191,900.00 Finished
New City HallCompund,Guinobatan
Rehabilitation ofCity College Building Repair of school building works included 350,300.00 Finished
Brgy.Canubing I,Calapan City
Construction ofIrrigation System
Facility
Construction of 4mx4m plump house w/ steelperimeter wall 1 unit of 3.4x3.4 mtr. stillingpool w/ water proofing 8 units of 20x20concrete brace for pipes.
500,000.00 Finished
FMO, Old CityHall, Ibaba
East, CalapanCity
Proposed Partitionfor Stockroom
Proposed partition for stockroom: 1.32m x2.32m 13,300.00 Finished
City Proper Ditching andClearing of Canal
Clearing and ditching of drainage canal;Osmeña St., Mabini St., San AgustinSt.,Malaluan St.,J.Luna St., Gonzales St., andA.Bonifacio St.(Loob), Ilaya
50,000.00 Finished
[Type the document title]
Nag-Iba II Construction ofFootbridgeConstruction of temporary woodenfootbridge; coco lumber 83,800.00 Finished
Sta.Isabel Repair of PoliceCommunity PrecintSupply of construction materials for therepair of Sta. Isabel Police Community Precint 19,600.00 Finished
Lazareto Construction ofRoofing of BleacherConstruction of roofing of bleacher 2.53m x26.0m 160,139.00 Finished
Lazareto Repair of BantayDagat Guard House
Supply for construction materials for therepair of Bantay Dagat Guard House located@ Brgy.Lazareto
30,812.00 Finished
LaludCementery
Construction ofTombs
Construction of 0.8m x 0.75m x 2.2m - 120tombs 715,400.00 Finished
Old City HallBuilding,Ibaba East
Rehabilitation ofWaterline Rehab. of waterline @Old City Hall 31,900.00 Finished
SPBldg.Guinoba
tan
Repainting ofOffices (Coun.Rafael
Panaligan Jr.)Repainting of 3.80m x 6.41m office 11,000.00 Finished
New City Hall,Guinobatan Painting of Gutter
Supply of Materials for the painting of gutter@ City Government Compound 8,500.00 Finished
Old City HallBuilding,Ibaba East
Renovation of CityLibrary
Rehab. of City Library, works included;dismantling of damage wooden ceiling andwall partition, installation of new partitionwall and ceiling; including painting work forinside and outside of City Library
466,700.00 Finished
FSRECComp.Biga
Rehabilitation ofFacilities of FSREC
Compound
Works included: Replacement of damagedwindows ceiling including painting due totyphoon Nona
54,900.00 Finished
VariousBarangays
Fabrication ofEmergency Hotline
Board
Fabrication of emergency hotline steel board-20 units (4'x5') including painting works
96,300.00 Finished
Ciriaco AbesMemorial
School Mahalna Pangalan
Construction offence Construction of fence , 4.0lm x 2.4m H
15,000.00 Finished
BJMP OfficeBldg., Ilaya Siphoning of Sludge
Siphoning of septic tank (5.0m x 3.0m x 1.8depth) for BJMP Office 16,500.00 Finished
LegislativeBldg.Guinoba
tanSiphoning of Sludge
Siphoning of septic tank (2.0m x 4.0m x 2.0depth) located at the left side of theLegislative Bldg.
11,000.00 Finished
Calapan Zoo,Bulusan
Improvement ofPlayground Facilities
Improvement of facilities, works included:repair of steel play pen, construction ofwooden play pen, fabrication of seesaw,installation of fiberglass slide, wooden bench,tire bench and painting.
170,100.00 On-going
Improvementof FSREC
Improvement ofImprovement of FSREC compound, worksincluded; construction of pedestal for On-going
[Type the document title]
Compound Playground Facilities fabrication of nipa hut and barbeque pit 146,400.00
VariousBarangays
Regravelling of Road Repair of existing different barangay roads 79,200.00 Finished
Pamana ngLungsod ,Sitio Bulalo,
Balite
Regravelling of Road Repair of existing barangay roads,1200.0Lm(average of 4.0m W)
140,100.00 Finished
Canubing-IIPainting of HealthCenter/Daycare
Center
Painting of 15.0m x 6.0m daycarecenter/health center 20,000.00 Finished
BuhuanMaterials for Cluster
Meet 2016
Materials for cluster meet includes;embankment of 28m x37m x 0.2m schoolground, 20 bags of cement and 10 pcs.marine plywood
89,800.00 Finished
Nag-Iba IIConst. of Concrete
PavementConst. of 100m x 0.8m x 3” concretepavement at Sitio Villaluna
31,200.00 Finished
BBRIS MainCanal. Naujan
Desilting of Baco-Bucayao River
Irrigation
Declogging/desilting of BBRIS Main Barrel(3units)
30,000.00 Finished
City CollegeProposed
Information DeskFabrication of wooden counter and cabinets,works include: Carpentry and varnish paint. 31,900.00 On-going
Parang Nat'lH/S, PARANG
Rehab. Of ExistingBldg.(ACP Type)
Rehab of existing two-storey 28.3mx9.19school bldg. including paintings
370.000.00 On-going
City ProperInstallation ofWooden Frame
Supply of materials for installation of 3-units10’ x 12’ wooden frame 8,700.00 Finished
BungahanE/S, Sta. Rita
Demolition ofExisting Building
Demolition of 3 CL (Marcos Type) building18m x 7.50m including disposal 34,875.00 Finished
SilonayMangrove
Conservationand Ecopark,
Silonay
Renovation of Sari-Sari Store
renovation of sari-sari store includes:extension of 6.52sq.m from the mainbuilding, up built of guest comfort room (1)and sink and purchase of bamboo poles andbamboo stakes and installation of doors
100,000.00 Finished
TOTAL PROJECT COST Php 6,688,283.50
[Type the document title]
Name of Project:WATER SYSTEM
LOCATION DESCRIPTION PROJECTCOSTS STATUS
Canubing-II Installation of two(2) units free flowing using 2” dia. G.i. pipe sch.40 (28 pcs.) at Sitio Aliso 112,900.00 Finished
Pamana ngLungsod,Balite
Installation of one(1) unit free flowing using 2” dia. G.i. pipe sch.40(18 pcs.) 72,600.00 Finished
Baruyan Installation of one(1) unit free flowing using 2” dia g.i. pipe sch.40(21 pcs.) at Sitio Hulo. 42,000.00 Finished
Canubing-IIRehabilitation of 10 units free flowing deepwell at Sitio Bayog (2units), Sitio Perlas (2 units), Sitio Layugan (2 units), Sitio Centro (2units)
70,000.00 Finished
Baruyan Installation of one unit free flowing using 2” dia. G.i. pipe sch.40(18 pcs.) at Sitio Manggahan. 36,100.00 Finished
Managpi Materials for the water system @ Sitio Bibihan 3,000.00 FinishedBrgy.
Malamig,Calapan City
Labor for the installation of one (1) unit free flowing using 2" dia.G.I pipe sch 40mx22m at Sitio Silangan 44,000.00 Finished
Brgy.Canubing I,Calapan City
Labor for the installation of one unit free flowing deepwell using 2"dia. G.I pipe sch. 40 (10 pcs) at Sitio Aliso 20,000.00 Finished
Bondoc Installation of 1 unit cylinder pump using 2" dia GI post sch 40(8pcs), fitting and accessories @ Sitio Ibaba 55,800.00 Finished
Tawiran Installation of 1 unit free flowing using 2"dia GI post sch 40(12pcs.) @ Sitio Irrigation 48,500.00 Finished
Managpi Installation of 1 unit jetmatic pump using 2"dia GI post sch 40(18pcs) @ Sitio Ilaya Cuenca
75,900.00 Finished
Malad Materials for the water system@ Sitio Purok VI 39,000.00 Finished
Canubing-II Installation of one unit free flowing deepwell using 2” dia g.i. pipesch. 40(12 pcs.) at Sitio Bangaya. 45,000.00 Finished
Canubing-II Installation of one unit free flowing deepwell using 2” dia g.i. pipesch. 40(12 pcs.) at Sitio Ibaba. 45,000.00 Finished
Malad Installation of one unit free flowing deepwell using 2” dia. G.i.pipe sch. 40 (20 pcs.) 75,000.00 Finished
Canubing IInstallation of 1 unit free flowing deep well using 2" dia GI pipesch.40 (22pcs) @ Sitio Proper(rental of welding machine includedin labor).
102,540.00 Finished
Core Housing,Bulalo, Balite, Construction of 33.0Lm x 0.40m outer width open canal 29,900.00 Finished
Balingayan labor for the rehab of 7 units free flowing @ Sitio Common,Greenhills, San Juan, Ilaya, Barutbutan, San Isidro and Sunrise 42,000.00 Finished
Canubing II Labor for the installation of one unit free flowing deepwell using 2"dia. G.I pipe sch 40 (10 pcs) at Sitio Bayog 20,000.00 Finished
TOTAL PROJECT COSTS PHp 979,240.00
[Type the document title]
Name of Project: INSTALLATION/REHAB OF STREETLIGHTS
LOCATION DESCRIPTION PROJECTCOSTS
DATESTARTED/
DATEFINISHED
Suqui Installation of 16 units streetlights CFL Lighting Fixture(KronoType Big) with 60 watts spiral at Sitio Sunrise and Villa Arce 4,800.00 Finished
San VicenteNorth
Installation of 14 units streetlights High Power LED 18 watts andfabrication of 14 units g.i. post for streetlight pole 2” x 1-1/2” x4.5mtrs. ht. along Aurora Blvd.
136,900.00 Finished
LegislativeBldg.Guinobatan
supplies of materials for the rehabilitation of electrical facilitiesin various offices in Legislative Bldg. 70,900.00 Finished
Baliteinstallation of open secondary line extension using 5 unitsservice pole @ Brgy.Balite 213,960.00 Finished
Nag-Iba I installation of 15 units CFl lighting Fixture w/ maiximizer CFL 22watts (2 1/2 x 2 x 4.5mtrs Ht GI Post @ Sitio Ibaba 30-35m span
119,400.00 Finished
Camilmil Installation of 16 units st.lights using # 3" s.40 GI pipe w/ CFLfixture w/ GE Spiral Eco Bulbs 60w, tap to existing st.lights 191,500.00 Finished
Ibaba East installation of 15 units streetlights roadlights fixture HPS 150watts (see item VII and VIII), 6 units - Bonifacio St., 4 units -Osmeña St., 5 units - J.P. Rizal St
387,471.00 Finished
TOTAL PROJECT COSTS Php 1,124,931.00
Name of Project: CONSTRUCTION OF SOLAR DRYER
Name ofBarangay Description Project Costs
STATUS
Canubing-II Construction of 16m x25m solar dryer 165,000.00 Finished
Gulod Construction of 20m x 22m Solar Dryer at Sitio Silayan 224,460.00 Finished
Gutad Construction of 15m x10m solar dryer with 0.20 m x 0.1mcolumn stiffener spaced at every 3m span. 167,700.00 Finished
TOTAL PROJECT COSTS Php 557,160.00
CITY PROJECTS(BY CONTRACT)
LOCATION NAME OF PROJECTS DESCRIPTION PROJECTCOSTS STATUS
Ibaba East Const. of Seawall Const. of 120m seawall with nosing, shoeand 6 stairs. 1,263,283.73 Finished
AdriaticoMem.School
Rehab of GabaldonBuilding
Rehab of Gabaldon Bldg. which includesinstallation of tiles, wooden partition,stainless handrail, wooden capiz, electricalworks.
986,090.50 Finished
City Proposed 3-Storey Construction of 43 x 12 mtrs. Proposed 3- 4,882,408.90 On-going
[Type the document title]
College,Guinobatan
City CollegeBldg.(Phase-III)
Storey City College Bldg.(Phase-II):including 2nd floor slab with steel deck,SOF, CHB laying and plastering, tiles andceiling works, doors
Old CityHall
Compound,Ibaba East
City Disaster RiskReduction & Mngt.Operation Center
Const. of Two-Storey Bldg. withRoofdeck.Tile and ceiling works, doors andwindows, electrical and plumbing,waterproofing. Const. of 16 lm slopeprotection with steel sheet pile.
4,228,720.74 On-going
City PublicMarket
Repainting of PublicMarket
Repainting of Calapan City Public Marketincluding steel railings 1,460,920.17 Finished
City HallCompound,Guinobatan
Const. of ChildCare(Phase-II)
Const. of 16.0m x 12.0m Child CareCenter(phase-II) 1,495,278.52 On-going
BigaConst. of LGUOrganic TradingPost(Phase-I)
Const. of 10.0m x 7.50m LGU OrganicTrading Post(Phase-I) 997,028.00 Finished
Sitio Dalig,Batino
Const. of Category IISanitary Landfill Cell
Proposed const. of 1 hectare category IIsanitary landfill cell. 2,318,041.13 On-going
Pamana ngLungsodRelocationSite, Bulalo,
Balite
Baclfilling ofRelocation
Site(Phase-IV)
Clearing of 6000.00 sq. m. area, includingembankment for 4599.0 cum x .80mdepth.
2,491,987.98 Finished
LibisProposed Additionand Alteration of
Brgy. Hall
Const. of 8.5 x 10m 2-Storey Brgy. Hallwhich includes concrete works up to roofbeam, chb laying, plastering, tile works,roof and g.i. roof sheets, ceiling for groundfloor, doors for CR, 1 unit septic tank andelectrical works
986,382.42 On-going
City HallCompound,Guinobatan
Rehab of HRMBuilding
Rehab and repainting of HRM Building(197.76 sq. m.), works included:clearing,scaffolding, dismantling, carpentry works,installation of glass partition, repainting,rehab of conc. gutter & roof, plumbing,electrical works & installation of canopyroofing.
389,680.47 Finished
CanubingNHS,
Canubing-I
Proposed CoveredCourt
Const. of 16m x 10.4 m covered court(Phase-II) 1,598,556.50 on-going
Canubing-I Rehab of NIA RoadLateral A-6Rehabilitation of 4.0m x 150 lm NIA roadlateral A-6 (0.75 m ave. embankment) 349,855.00 Bidded
CalapanRiver,
Camilmil toLalud
Dredging ofCalapan River
Dredging of Calapan River with totallength of 750.00 lm 998,410.12 Bidded
Libis Proposed Additionand Alteration ofCompletion of 8.5 m x 10 m 2-Storey Brgy.Hall which includes ceiling for 2nd floor, 432,450.58 Bidded
[Type the document title]
Brgy. Hall windows, doors, plumbing works,paintings, stainless railings for balcony andperimeter grills and gate
San VicenteNorth
Improvement/Rehabilitation of CityRural Health Unit
North
Rehab of City Rural Health Unit:Demolition, repair of roof & gutter pebble,SS railings, window grills, scrub sink andwater pump, const. of placenta pit and SVpainting works.
889,552.02 on-going
TOTAL PROJECT COSTS Php 25,768,646.78
Name of Project: CONCRETING OF ROAD
LOCATION DESCRIPTION PROJECTCOSTS STATUS
Sitio Greenhills & Proper,San Antonio
Concreting of 156 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 000-sta. 0 + 156)
997,640.00 Finished
Sitio Oliva, Bayanan-I
Concreting of 200 lm x 4.0m x 3.0 m x 0.15mthick concrete pavement with aggregateshoulder on both side and installation of .60 mdia RCPC ( 4-units)
979,143.44 Finished
Sapul-Puting Tubig
concreting of 110 Lm x 5.0m x 0.20 thickconcrete pavement w/ aggregate shoulder onboth side (sta.0+147.70 - sta.0+257.70) andinstallation of 0.60m dia RCPC x 6Lm w/riprap
997,334.56 Finished
Balite-Tibag Pamayanan
concreting of 90.50Lm x 5.0m x 0.20 thickconcrete pavement w/ aggregate shoulder onboth side (sta.0+000 - sta.0+90.50) andconcreting of 45.20Lm x 4.0m x 0.115m thickconcrete pavement w/ 0.50m aggregateshoulder on both side (sta.0+90.50-sta.0+135.70)and installation of 0.30m dia RCPC x 12Lmw/riprap
997,061.51 Finished
Balite-Bulalo
concreting of 140Lm x 5.0m x 0.20 thick concretepavement w/ aggregate shoulder on both side(sta.0+240.40 - sta.0+38.40) and installation of0.60m dia RCPC x 5Lm w/riprap
996,747.47 Finished
Bagong Silang, Baruyanconcreting of 160Lm x 4.0m x 0.15m thickconcrete pavement w/ aggregate shoulder onboth side
997,481.50 Finished
Ibaba, Baruyanconcreting of 160Lm x 4.0m x 0.15m thickconcrete pavement w/ aggregate shoulder onboth side
997,709.87 Finished
Sitio B3, Camansihan
Concreting of 130.3 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side and installation of .60 m dia RCPC x 10lm with riprap
997,061.51 Finished
[Type the document title]
Puting-Tubig to Gulodconcreting of 120Lm x 5.0m x 0.15m thickconcrete pavemnet w/aggregate shoulder onboth side (sta. 0+000-sta 0+120)
997,400.00 Finished
Sta. Cruz
Concreting of 160 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side and installation of .30 m dia RCPC x 6lm with riprap
997,140.77 Finished
Bagong Pook, Nag-Iba IConcreting of 165 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 000-sta. 0 + 170)
996,643.67 Finished
Sitio Islander, Personasconcreting of 160Lm x 4.0m x 0.15 thick concretepavement w/ aggregate shoulder on both side(sta.0+000 - sta.0+160)
997,922.23 Finished
Sitio Putol, Sta. Isabel
Concreting of 141 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 201.70-sta. 0 + 342.7) andinstallation of 0.60 m dia RCPC x 10 lm, withriprap.
996,526.20 Finished
Sitio Bibihan, ManagpiConcreting of 165 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 799.60-sta. 0 + 964.60)
997,643.67 Finished
Sitio San Gabriel, Malamig
Concreting of 160 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 000-sta. 0 + 160) andinstallation of 0.60 m dia RCPC x 5 lm, withriprap.
998,279.08 Finished
Sto. Niño, Nag-Iba IIconcreting of 180Lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side
997,843.60 Finished
Sitio Sunrise, SuquiConcreting of 170 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 017.15-sta. 0 + 187.15)
997,434.77 Finished
Cherry St., Lalud Concreting of 114.0 lm x 4.0m x 0.15m thickconcrete pavement with shoulder on both side 574,352.13 Finished
Sitio Aliso, Canubing-IIConcreting of 110 lm x 5.0m x 0.20m thickconcrete pavement with aggregate shoulder onboth side.
997,854.60 Finished
Sitio Core Housing, Sta.Isabel
Concreting of 210 lm x 3.0m x 0.15m thickconcrete pavement and 13 lm x 4.0m x 0.15mthick concrete pavement with aggregateshoulder on both side and installation of RCPC0.20 m dia x 9 lm.
997,571.86 Finished
Ubas St., Lalud Rehabilitation of 185 lm x 6 m x 0.23 m thickconcrete pavement 1,997,928.96 Finished
Biga-Comunal Rehabilitation of 120 lm x 5m x 0.20 m thickconcrete pavement. 997,968.42 Finished
St. Benedict Road Extn.,Lalud
Concreting of 170 lm x 4.0m x 0.15m thickconcrete pavement with shoulder on both side 996,919.23 Finished
[Type the document title]
Pachoca Cathecist Lane,Pachoca
Concreting of 160 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side(sta. 0 + 000-sta. 0 + 120 & sta. 126-sta.0+166 and installation of 0.30m dia RCPC x 10 lmwith riprap
997,781.37 Finished
Gutad, Caguisikan
Concreting of 100 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side and installation of 1.20m dia RCPC x 6lm & 0.90m dia RCPC with slope masonry.
997,673.05 Finished
Batino Dumpsite Road Concreting of 160 lm x 4.0m x 0.15m thickconcrete pavement with shoulder on both side 998,278.34 Finished
Holgado St. Camilmil
Concreting of 48.80 lm x 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth side and installation of 44 lm x 0.45 m diaRCPC with manhole.
479,188.81 Finished
Sitio Centro, Canubing II
concreting of 80Lm x 4.0m x 0.15m thickpavement w/ aggregate shoulder on both sidesincluding installation of 6Lm x 0.45m RCPC w/stone masonry headwall
300,000.00 Finished
Malad Concreting of 160 lm. X 4.0m x 0.15m thickconcrete pavement with aggregate shoulder onboth sides.
997,507.23 Finished
TOTAL PROJECT COSTS Php 28,270,037.85
Name of Project: OPENING OF FARM TO MARKET ROAD
LOCATION DESCRIPTION PROJECT COSTS STATUS
Sitio Celis, Bayanan-IWorks included: Embankment for roadopening, 6.0m width x 140.0m , installationof 1.2m RCPC x 18.0 lm( 3 lanes), const. ofriprap, headwall and apron, lean concrete
997,379.77 Finished
Sitio Highlander, Canubing-I Opening of 3.0m x 88 lm farm to marketroad(1.0m ave. embankment) 347,448.03 Finished
Sitio Bagong Silang, Biga
Works included: Embankment for roadopening, 6.0m width x 291.0m andinstallation of 1.2m RCPC x 18.0 lm(3 lanes),const. of riprap, headwall, apron and leanconcrete
1,470,753.42 Finished
TOTAL PROJECT COSTS Php 2,815,581.22
Name of Project: CONSTRUCTION OF EVACUATION CENTER
Location DESCRIPTION PROJECTCOSTSDATE STARTED/DATE FINISHED
Tawiran Construction of 8.5 x 9.5m 2-storey 987,150.60 Finished
[Type the document title]
Evacuation Center Phase 1; civil works w/cincludes suspended slab of 1st & 2nd floor,footings & columns up to elev. ± 4.70mtrs.
Tawiran
Const. of 149.75 sq.m. two-storey evacuationcenter phase-II includes; columns & beams of2nd floor, masonry works, plaster (interiorwalls), roof framing, G.I. roof sheet, plumbingfittings and electrical rough-ins.
983,458.47 Finished
Camilmil
Installation of perimeter steel louver, 1 unitof roof truss, 1 span of c-purlins and G.I. roofsheet; concreting of flooring withembankment plastering and electrical works.
2,918,880.15 Finished
Camilmil
installation of perimeter steel louver, 1 unitof roof truss, 1 span of C-purlins and GI roofsheet, concreting of flooring w/ embankmentplastering and electrical works(Phase-III)
2,500,000.00 Bidded
Sta. Cruz
Completion of 149.75 sq.m. plastering(2faces), tiles, wall cladding, balcony & stairhandrails, ramp, roofing works, ceiling, doors& windows, painting works, plumbing worksand electrical works.
1,767,394.71 Finished
Gutad
Const. of 149.75 sq.m. two-storey evacuationcenter phase-III includes; plastering(2 faces),tiles, wall cladding, balcony & stair handrails,roofing, ceiling, doors & windows, paintingworks, plumbing works and electrical works.
1,593,291.00 Finished
Camansihan
Const. of 6m x 18 m (1 span @ 6.0m)evacuation center with steel roof framing; ribtype roof sheet; concrete footing, columnsand beams; steel louver on perimeter wall.
931,864.71 Finished
TOTAL PROJECT COSTS Php 11,682,039.64
Name of Project: CONST. OF MULTI-PURPOSE HALL
Location DESCRIPTION PROJECTCOSTS STATUS
PalhiConst. of 16m x 26.5 m multi-purpose hallwith steel columns and trusses and rib-typeg.i. roof sheet
2,950,166.60 Finished
Sta. Ma. Village
Const. of Multi-Purpose Hall Phase-II :Bleacher (24 lm) with roofing, concretefloor slab(19.2 cum), fabricated basketballboard, goal and stand and painting works.
974,302.18 Finished
MINSCAT, Masipit Const. of 18.0m x 11.0m 2-Storey Bldg.; 2,959,873.50 Finished
[Type the document title]
foundation, column, floor beams, suspendedslab, CHB laying and plastering for groundfloor, electrical and plumbing rough-ins.
TOTAL PROJECT COSTS Php 6,884,342.28
Name of Project: CONST. OF COMMUNAL IRRIGATION SYTEM
Location DESCRIPTION PROJECTCOSTS STATUS
Sitio Mansanas, Buhuan Construction of 130 lm. X 0.60m open canal 725,485.26 Finished
Panggalaan Construction of 113 lm. X 0.60m open canal 772,010.91 Finished
Pajo,Canubing-I-BaruyanConst. of 43 lm. X 0.60m open canal andinstallation of water system with water pumphouse
998,525.90 Finished
TOTAL PROJECT COSTS Php 2,496,022.07
Name of Project: DRAINAGE CANAL
LOCATION DESCRIPTION PROJECTCOSTS STATUS
Bataan St., San VicenteWest
Construction of 144Lm x 0.45m open canalincluding concreting of driveway 487,529.20
Finished
Avocado St., Lalud
Const. of 124 lm x 0.60 m covered canal withmanhole, inlets and catch basin, const. of 124lm curbs and gutter, & conc. Of 124 lm x 1.0m ave. width x 0.15m thick shoulder
938,123.91 Finished
Bonifacio St., Ibaba East
Const. of 127 lm x 0.60m covered canal, 9 lmx 0.60m box culvert with manhole, inlets andcatch basin, and const. of 80 lm curbs andgutter
997,681.69 Finished
Caimito St., Lalud
Const. of 260 lm x 0.60 m covered canal withmanhole, inlets and catch basin, const. of 260lm curbs and gutter, & conc. Of 260 lm x 1.59m ave. width shoulder
2,373,785.85 Finished
Sampaguita St.,Lumangbayan
Const. of 156 lm x 0.60 m covered canal withmanhole, inlets and catch basin, const. of 156lm curbs and gutter, & conc. of 156 lm x .74m ave. width shoulder
1,198,063.96 Finished
Bataan St., San VicenteWest
construction of 71Lm x 0.45m covered canal,concrete covering of 100Lm open canal w/manhole, inlets and catch basin, const. of210Lm curbs and gutter and const.of 210Lm x0.33m average w/ shoulder
842,566.15 Finished
Suqui Const. of 135 lm x 0.60m open canalincluding concreting of driveway and 699,539.75 Finished
[Type the document title]
installation of 6 lm 0.60 dia RCPC withheadwall.
Sto. Niño construction of 196Lm x 0.45m open canalincluding concreting of driveway 649,996.05 On-going
Relocation Site, Sitio Bulalo,Balite
construction of 175Lm x 0.45m and 14Lm x0.30m open canal including concreting ofdriveway and installation of 16Lm x 0.45m Øand 6Lm x 0.30mØ RCPC
772,997.67 On-going
TOTAL PROJECT COSTS Php 8,960,284.23
CITY PROJECTS BENEFICIARIES(2016)LOCATION TOTAL PROJECT COST LOCATION TOTAL PROJECT COST
San Vicente South 1,079,390.50 Lalud 766,400.00Balingayan 42,000.00 Lazareto 160,139.00Balite 5,715,354.63 Libis 1,418,833.00Baruyan 3,118,817.27 Lumangbayan 1,198,063.96Batino 3,316,319.47 Malad 1,144,507.23Bayanan-I 66,200.00 Managpi 1,076,543.67Bayanan-II 2,644,077.44 Mahal na Pangalan 15,000.00Biga 3,662,949.84 Masipit 2,959,873.50Buhuan 815,285.26 Nag-Iba-I 1,116,043.67Bulusan Park 170,100.00 Nag-Iba-II 1,112,843.60Bondoc 55,800.00 Palhi 2,950,166.60Bucayao 310,000.00 Parang 370.000.00Calapan River 998,410.12 Panggalaan 772,010.91CGC Complex 9,444,593.75 Personas 997,922.23Camansihan 1,928,926.22 Puting-Tubig 997,400.00Camilmil 7,087,979.08 San Antonio 997,640.00Canubing-I 3,967,112.93 San Vicente West 1,330,095.4Canubing-II 1,775,754.60 San Vicente North 1,026,452.02City College 5,397,558.90 Silonay 100,000.00City Proper 167,100.00 Sta. Isabel 2,013,698.06City Public Market 2,246,320.17 Sta. Ma. Village 974,302.18Comunal 997,968.42 Sta. Rita 34,875.00Ibaba East 2,260,965.42 Sta. Cruz 2,764,535.48Ilaya 16,500.00 Sto. Niño 649,996.05Guinobatan 98,420.00 Suqui 1,002,234.77Gulod 224,460.00 Tawiran 2,019,109.07Gutad 2,758,664.05 Various Barangay 175,500.00Lalud 7,879,520.20
[Type the document title]
[Type the document title]
PROPOSED ADDITION & ALTERATIONOF BRGY. HALL @ Libis
CONST. OF CATEGORY II SANITARYLANDFILL CELLBatino, Calapan City
CONSTRUCTION OF EVACUATIONCENTER Sta. Cruz, Calapan City
CONSTRUCTION OF SEAWALLIbaba East, Calapan City REHABILITATION OF ROAD
Ubas St., Calapan CityCONCRETING OF ROAD
PROPOSED 3-STOREY CITYCOLLEGE BUILDING(PHASE-III)
CONSTRUCTION OF CHILD CARE CENTERUbas St., Calapan City
[Type the document title]
BARANGAY PROJECTSLOCATION NAME OF
PROJECTSDESCRIPTION PROJECT
COSTSSTATUS
San Antonio Const. of ConcreteFence with
Concrete Bleacher
Const. of concrete fence with concretepavement at Sitio Proper
140,000.00 Finished
Wawa Improvement ofPlayground Facilities
improvement of playground facilities, worksincluded; concreting 2-units x 0.60m x 40.0mpathway, repair of playground equipment andsteel gate, painting works and clearing area
76,200.00 Finished
Wawa Fabrication ofMotorized Banca
fabrication of 1.0m width by 11.0m longmotorized wooden banca
38,400.00 Finished
Tawagan Installation ofPaging System
installation of paging system including 1unit public address amplifier w/ USB inputand 2 GB USB Drive , 4 units horm 20" w/driven unit and matching transformer and
speaker wire
44,200.00 Finished
San VicenteSouth
Repainting ofGovernmentFacilities
repainting of facilities, works included:clearing and scrapping of old paints andrepainting of Health Center, Day Care
Center @ Brgy.Hall
27,500.00 Finished
CoveredCourt,
Guinobatan
Construction ofBleacher
construction of 1.50m x 12.50m bleacherand repair of damage cyclone wire fence.
120,999.00 Finished
Balite Installation of RCPC Installation of 6 units 0.60mm diameterRCPC at Sitio Bulalo, total length of 6.0Lm
25,800.00 Finished
HealthCenter,Malamig
Fabrication andInstallation of Grills
and Paintings
fab.and installation of door and windowgrills w/ paintings
34,300.00 Finished
SitioCentro,Masip
it
Installation ofManhole Cover
installation of manhole: (9) 0.40mx0.40m,(8)0.50mx0.40m, (4)0.35mx0.50m,
(6)0.60m x0.60m
20,300.00 Finished
San VicenteCentral
Repair of Road repair of 22.5 Lm x 4.0mtr wide roadlocated @ Ramirez ST.
99,300.00 Finished
San Antonio Construction ofPVC Pipe Drainage
Construction of 130Lm PVC pipe drainagew/ 10 units 0.75 x 0.75 x 0.20 catch basin
39,880.00 Finished
San VicenteNorth
Fabrication of Grills Fabrication of 9 units 2.4x1.4mtrs, 1 unit1.8x1.4mtr window grills and 1 unit of 9.9 x2.65mtr perimeter enclosure grills using 1:
GI pipe and 12mm square bar.
24,000.00 Finished
Calero Fabrication ofMovable Stage
Fabrication of 3.6mtrs x 6.0mtrs movablestage w/ 3/4' marine plywood for flooring
and GI pipes for frame
60,000.00 Finished
Bucayao Construction of Construction of 1m x 48Lm fence (steel) @ 70,000.00 Finished
[Type the document title]
Elem. School School Fence Bucayao Elem.SchoolLumangbayan Improvement of
Covered CourtImprovement of covered court included:
dismantling of damaged portion of wall androof, installation of roof extension , gutter
and perimeter steel matting
243,100.00 Finished
Day CareCenter,
Canubing II
Installation of Tilesand Grills
Installation of tiles and door grills @7.32mx 5.70m day care center
45,000.00 Finished
Brgy.HallComp., Suqui
Construction ofWaiting Area
Construction of 4.78m x sq.m. waiting area 45,875.00 Finished
Suqui Construction ofBarangay HallExtension
Const. of Brgy.Hall Extension 4.0 m x 20.60m
169,999.00 Finished
San VicenteEast
Trimming of TreeBranches
Trimming of tree branches along ZamoraSt: 100Lm
20,000.00 Finished
Silonay Installation ofDecorative Lights
Installation of 12 units decoratice lights @Center Island (Sitio Centro)
57,600.00 Finished
Sitio Bulalo,Balite,
Opening ofBarangay Road
Supply of backfilling materials for openingof 6.0m w x 85.50m barangay road
99,800.00 Finished
HealthCenter, Biga,
Installation ofWooden Partition
Installation of Wooden Partition 2-units -3.0m x 3.0 sq.m. , including fabrication of2-units 0.70m x 1.0m table and painting
36,000.00 Finished
SitioBarutbutan,Balingayan,
Construction ofFoot Bridge
Construction of 16.00m x x1.30m footbridge
90,000.00 Finished
Balingayan Regravelling regravelling of 326Lmx4mx0.05m thickroad; materials only
30,000.00 Finished
Bulusan SitioProper II
Installation ofRiprap
installation of 6.0Lm x 3.5m riprap w/average thickness of 0.60mtr.
55,895.00 Finished
Day CareCenter
Canubing II
Installation of tiles installation of tiles @ 7.32m x 5.70m daycare center
35,000.00 Finished
Salong Fabrication ofGarbage Bin
Fabrication of Garbage Bin 76,090.40 Finished
Guinobatan Regravelling regravelling of 1800 Lm x 3.0m x 0.15barangay road
47,701.00 Finished
Guinobatan Repair of DaycareCenter
Repair of Daycare Center, replacement ofceiling and ceiling joist 100%, painting of
61,722.00 Finished
[Type the document title]
ceiling and repainting of wallsCentro,
PanggalaanRehabilitation ofMulti-Purpose Hall
Repair of roofing, ceiling, doors andwindows including paintings.
47,575.00 Finished
Canubing II Fabrication andInstallation of Grills
Fabrication and Installation of Grills andpainting of Health Center, door and
window grills with painting
35,000.00 Finished
Sta. Ma.Village
Repainting ofBasketball Court
Repainting of Basketball Court, 450.00sq.m.
9,300.00 Finished
Masipit Repainting ofBarangay Hall &Basketball Court
Repainting of 239.28 sq.m. Barangay Halland 15x30 basketball court
40,030.00 Finished
Bayanan-I Repainting ofBasketball Court
Repainting of 15mx 30m basketball court 58,000.00 Finished
San VicenteCentral
Repair of CCTV Repair of existing analog CCTV system 49,290.00 Finished
Panggalaan Painting ofBasketball Court
Repainting of 450.00 sq. m. basketballcourt
18,400.00 Finished
Camansihan Const. of OverheadWater Tank
Const. of Overhead Water Tank using G.I.pipe 3” dia sch. 40
10,350.00 Finished
Camansihan Installation of Tiles Installation of tiles at Brgy. Hall 9,900.00 Finished
San Antonio Painting of Multi-Purpose Bldg.
Painting of entire multi-purpose livelihoodbuilding
57,150.00 Finished
Suqui Repainting ofplaygroundfacilities
Repainting of all playground facilities 18,000.00 Finished
TOTAL PROJECT COSTS Php 2,287,656.40
Name of Project: WATER SYSTEM
Name ofBarangay DESCRIPTION
ProjectCosts
STATUS
Canubing-II Labor for the istallation of two (2) units free flowing at SitioAsilo (C/O Domingo Marasigan)
48,000.00 Finished
Canubing-I Additional 4 pcs. 2" dia sch 40 GI pipe for the installation offree flowing @ Sitio Lagunlong
48,000.00 Finished
Gutad
Installation of 1 unit pressurized water tank 21 gal.(stainless )w/ electric motor pump 1 HP (complete set ) concretepedestal .80m x .80m x 1.60m, distribution pipeline ( PVC bluepipe 1/2 ), faucet and fittings at daycare center ( Caguisican )
26,000.00 Finished
Canubing-I Installation of one unit free flowing 29,660.00 FinishedMalamig Installation of water system at Sitio Silangan 76,230.00 Finished
Canubing IInstallation of one(1) unit free flowing deep well using 2"diaG.I pipe sch 40 (20pcs) at Sitio Bayabas (rental of weldingmachine included on labor)
83,000.00 Finished
Sta. Isabel Construction of 1 unit 2.0m x 2.50m artesian well roofing 14,000.00 Finished
[Type the document title]
Canubing IInstallation of 1 unit free flowing deep well using 2" dia GI pipesch.40 (22pcs) @ Sitio Proper(rental of welding machineincluded in labor).
82,000.00 Finished
Masipit Installation of 2 units Jetmatic pump using 2"dia GI pipe sch 40(28pcs) @ Sitio Batasan and Irrigation 119,400.00 Finished
Canubing II Rehab of 1 unit free flowing @ Sitio Centro 7,000.00 Finished
Canubing II Labor for rehabilitation of one unit free flowing deepwell atSitio Aliso (C/O Domingo Marasigan) 7,000.00 Finished
Tawagan Rehabilitation of one unit free flowing @ Sitio Looban 7,000.00 FinishedCamansihan Labor for water system at Sitio Anilao 6,000.00 Finished
TOTAL PROJECT COST Php 553,290.00
Name of Project: INSTALLATION/REPAIR OF STREETLIGHTS & COURTLIGHTS
Name ofBarangay Description Project Costs
STATUS
Canubing IInstallation of 7 units streetlights CFL lighting fixture(FIAMMA Singe) w/ LED bulb 14 watts and fabrication of 2x2-1/2x 4.5mtrs height GI post for streetlight pole @ SitioLagunlong
48,950.00 Finished
Panggalaan Rehabilitation of existing brgy.streetlights @ Sitio Highway 10,000.00 Finished
TawaganInstallation of 30 units CFL lighting fixture (FIAMMA Single)w/ 22 watts & 2x2-1/2x4.5mtrs Ht GI post for streetlight pole@ Sitio Ilaya-2 units, Centro-2units and Hulo--26 units
243,600.00 Finished
Puting-Tubig
Installation of 4 units stand alone solar streetlights w 20wattssolar panel mono crystal line 5 watts cobra headlight chargercontroller 12v 2AH deep cycle battery cables battery box andaccessories
57,900.00 Finished
Sta. IsabelInstallation of 15 units streetlights CFl lighting fixture KronoType Big and fabrication of 3x3x6.0m GI post w/ plate5/8"x10"x10" and bracket 1-1/4 x 1.0m at Sitio Proper
288,700.00 Finished
Sta. IsabelInstallation of 9 units CFL lighting fixture (FIAMMA Single) w/CFL 22 watts & 2x2-1/2x4.5mtrs Ht GI post for streetlightspole @ Sitio Manahan
72,800.00 Finished
Sta. Isabel Repair of existing barangay streetlights @ various sitios(damage by typhoon Nona)
49,900.00 Finished
San VicenteWest
Installation of six (6) units streetlights CFL Lighting Fixture w/22 watts CFL maximizer and fabrication of 2 x 2 - 1/2 x 4.5mG.I post for streetlight pole along aurora blvd.
57,100.00 Finished
Tawiran Repair of existing brgy. streetlights@ Sitio Irrigation 28,500 .00 Finished
Personas installation of 13 units streetlights FALCON-High Power LED18 watts & GI post 1-1/2 x 2x4.5mtrs Ht @ Sitio School 230,500.00 Finished
Nag-Iba II Repair of existing barangay streetlights along Provincial Road(damage by Typhoon Nona) 29,700.00 Finished
Tibaginstallation of 20 units CFL lighting fixture (FIAMMA Single)w/ CFL 22 watts and 2x2-1/2x4.5mtrs.Ht GI post forstreetlights pole @ Lopez, Macasaet and Aroma St.
152,700.00 Finished
[Type the document title]
Guinobataninstallation of 10 units streetlights Globe Type Half Clear /Half White 12" dia w/ essential bulb18 watts and2x2x4.5mtrs Ht (tap to residential houses)
50,000.00 Finished
Bayanan I repair of existing barangay streetlights along National High-way (Damage by Typhoon Nona) 54,300.00 Finished
Canubing IIinstallation of 17 units streetlights CFL lighting fixture(FIAMMA Single) w/ maximizer CFL 22 watts and 2 x2-1/2 x4.5mtrs Ht GI post @ Sitio Centro
123,700.00 Finished
Gutadinstallation of 15 units streetlights CFl lighting fixtureFIAMMA Single w/ 22 watts and 2 x 2-1/2 x 4.5m Ht GI postfor streetlight pole at Sitio Hacienda
93,900.00 Finished
Nag-Iba IIinstallation of 10 units (Mercury Reflector) w/ LED bulb, 10watts and 3x3x6 mtrs.ht GI post w/ bracket 1-1/4" x 1.0m @Sitio Labasan
99,900.00 Finished
Panggalaan repair of existing barangay streetlights @ Sitio Natulo(damage by typhoon Nona) 112,900.00 Finished
Panggalaan Repair of existing barangay streetlights @ Sitio Centro 38,400.00 Finished
Canubing Irehab of 9 units streetlights and installation of 3 unitsstreetlights CFL lighting Fixture w/2-1/2 x 2 x 4.5 mtrs ht GIpost sch 40 @ Sitio Highlander
80,000.00 Finished
Suqui Repair of existing barangay streetlights along Provincial Road(damage by Typhoon Nona) 76,500.00 Finished
Canubing I rehabilitation of 5 units streelights @ Sitio Bagong Silang,National Highway 35,500.00 Finished
Balingayan installation of 22 units CFL lighting fixture (FIAMMA Single)w/ 22 watts and 2x2-1/2x4.5mtrs.Ht GI post for streelightpole @ Sitio San Isidro
169,200.00 Finished
Bucayao repair / rehab of 25 units globe type streetlights along Nat'lHighway (damage by Typhoon Nona) 53,200.00 Finished
Tawiraninstallation of 40 units CFL lighting fixture (FIAMMA Single)w/ maximizer CFL 22 watts and 2x2-1/2x4.5mtr Ht GI post @
Ilang-ilang ,Gumamela, Camia and Rosal St.320,600.00 Finished
Ilaya
installation of 6 units stand alone solar streetlights w/20watts soalr panel monocrystal line, 5 watts cobra headlight
charger controller 12v 12AH Deep cycle battery cablesbattery box and accessories @ Kalaw St.
112,800.00 Finished
Sitio HighwayWest,
Bayanan II
installation of 5 units CFL lighting fixture Krono type big andfabrication of 84 3x3x6.0m GI post w/plate 5/8"x10"x10" and
bracket 1-1/4x1m99,100.00 Finished
Malamiginstallation of 6 units streetlights CFL lighting fixture
w/22watts CFL maximizer and fab.of 2x2-1/2x4.5mtrs GI postfor the streetlight pole @ Sitio Silangan
57,750.00 Finished
Canubing II installation of 4 units floodlights metal halide 400 watts atcovered court (installation of basketball courtlights) 108,700.00 Finished
Baliteinstallation of 12 units CFL lighting Fixture (FIAMMA Single)
w/ CFL 22 watts and 2x2-1/2x4.5mtrs Ht.GI post forstreetlights pole @ Sitio Bulalo
99,000.00 Finished
Canubing I rehab of 9 units streetlights and installation of 3 units 80,000.00 Finished
[Type the document title]
streetlights CFL lighting Fixture w/2-1/2 x 2 x 4.5 mtrs ht GIpost sch 40 @ Sitio Highlander
Wawainstallation of seven(7) units streetlights CFL lighting Fixture(FIAMMA Single) w/ CFL 22 watts and fabrication of 2 x2-1/2x4.5 Ht GI pipe for steel light pole @ Sitio Core Housing
58,400.00 Finished
Salonginstallation of 8 units streetlight using 2"dia G.I pipe sch40 15ft ht w/ weather proof lighting fixture (IXE27) w/essential bulb 23 watts lighting @ SitioUpper Ville I
69,000.00 Finished
Lumangbayan Installation of 10 units streetlights using 2"dia GI pipe sch 4015ft Ht. w/ umbrella type gooseneck bracket lighting fixturew/essential bulb 23 watts @ Sitio Centro and Villa
52,100.00 Finished
Malamig Repair of existing streetlights at Sitio Riverside (Damage byTyphoon Nona) 17,200.00 Finished
Canubing II,Installation of 18 units streetlight using # 2"S.40 G.I pipe, 15ft.ht. w/ Weatherproof Lighting Fixture (1 X E27) w/ Ess"IBulbs 23 watts at Sitio Layugan to Brgy. Hall
120,000.00 Finished
San VicenteWest
installation of 6 units streetlights CFL lighting fixture(FIAMMA Single) w/22watts CFL maximizer and fab.of 2x2-1/2x4.5mtrs GI post for the streetlight pole @Bataan St.
49,500.00 Finished
SMVinstallation /rehab of 6 units metal halide flood light 400watts @ covered court ( note: 4 units metal halide available@ site)
49,000.00 Finished
Guinobatan Labor for the repair of basketball courtlight @ Sitio CoreHousing 12,450.00 Finished
Guinobataninstallation of 10 units streetlights Globe Type Half Clear /Half White 12" dia w/ essential bulb18 watts and2x2x4.5mtrs Ht (tap to residential houses)
50,000.00 Finished
Bayanan-I repair of existing barangay streetlightrs along National High-way (Damage by Typhoon Nona)54,300.00 Finished
TawaganInstallation of 1 unit streetlights using 2"dia GI pipe sch 4015ft Ht. w/ umbrella type gooseneck bracket lighting fixturew/essential bulb 23 watts
10,000.00 Finished
Masipit Repair/Rehabilitation of existing barangay streetlights atVarious Sitio (damage br Typhoon Nona) 37,400.00 Finished
Tibag Installation of Basketball courtlights 12,450.00 FinishedIbaba West repair of existing barangay streetlights 39,900.00 FinishedSta. Isabel Rehab and installation of basketball courtlights 27,300.00 Finished
TOTAL PROJECT COST PhP 3,835,300.00
[Type the document title]
Name of Project: IMPROVEMENT OF BRGY. FACILITES (BRGY. HALL, MULTI-PURPOSE HALL, HEALTH CENTER)
Name ofBarangay Description Project Costs
STATUS
Guinobatan
improvement of barangay hall: installation of partitionwall(2.7m x 5.0m), installation of 40cm x40cm Glazed tile@kitchen center (4.0m x 0.60m), and flooring (4.0m x1.10m),replacement of ceiling and ceiling joist (100%) andconstruction of 5.0m x 0.75m storage room, replacement of2 panel doors and repainting of entire bldg.
156,378.00 Finished
Nag-Iba II improvement of 7m x 9m brgy.hall: installation of venetianblinds and window grills 46,926.25 Finished
Puting-Tubig Propose building roofing and gutter 72,900.00 Finished
Masipit improvement of barangay health center includes: roof gutter,replacement of window glass (9.41sq.ft.) and front door(1unit),roofing of kitchen including plaster of exterior wall
47,900.00 Finished
Bucayao Repair of ceiling, roofing, doors, windows including paintingof Health Center 49,960.00 Finished
Masipit improvement of barangay hall includes: partition wall w/painting works and de-clogging and siphoning of septic tank 15,900.00 Finished
Suqui Improvement of entire multi-purpose hall 224,994.00 FinishedTOTAL PROJECT COST PhP 614,958.25
Name of Project: INSTALLATION OF CCTV
Name ofBarangay Description Project Costs
STATUS
Sta. Rita supply of materials for the installation of CCTV Camera @barangay hall 37,300.00 Finished
San Antonioinstallation of 4 units CCTV Camera, Centralized powersupply, hybrid video recorder, monitor 19" LED TV, 2TB
Surveillance AV Drive and accessories56,600.00 Finished
San VicenteEast
installation of 4 units additional CCTV camera , centralizedpower supply, video balun booster and RG6 siamese cable 39,200.00 Finished
TOTAL PROJECT COST PhP 133,100.00
Name of Project: DRAINAGE CANAL(CONSTRUCTION/REPAIR)
Name ofBarangay DESCRIPTION Project Costs STATUS
Ilaya
Const. of 52Lm drainage system using 6" diameter PVCpipe and 10 units of 40x40xcatch basin, const. of 20Lmopen canal w/ removable cover, const of 1 unit 0.90 x 0.90mtr.manhole w/cover
100,000.00 Finished
Sitio ProperIII,Bulusan
Const. of 45mtr x 0.40 x 0.30 mtr (inner width) open canalw/croos beam every 3mtrs 75,500.00 Finished
Along Covered Construction of 0.60m outer width x 26m covered canal 91,000.00 Finished
[Type the document title]
Court,SMV and removal of existing earth fillcor.
G.Morente St.Paras Comp.,
SVS
Installation of 0.30m RCPC for drainage canal w/totallength of 40.70Lm
94,600.00 Finished
SitioCentro,Masipit Repair of 13Lm x 0.4m x0.40m drainage canal 27,500.00 Finished
Molave St.,Sto. Nino
Const. of 10 m. x 0.6 x 0.65m. (inner width) open canal w/column and cross beam @ every 3m. 30,000.00 Finished
Tangile St. Sto.Niño
Construction of 70x0.40x0.50mtr (inner width) open canalw/ cross beam and post every 3.0mtrs. 150,000.00 Finished
along Blk 4 ,SMV
Rehab of existing drainage canal, 0.60m x 301.80Lm ,including construction of manhole inlets 188,600.00 Finished
Silonay Construction of 50Lm x 0.90m wide open drainage canalw/ 6.0Lm RCPC 0.60m diameter 199,960.00 Finished
Guinobatan Construction of drainage canal along National Highway 35,150.00 Finished
Gozar St.Libis Construction of 76mtr x 0.60 x 0.5 mtr (inner width)covered canal w/ 0.40 x 0.40 manhole @ every 3 meters 220,000.00 Finished
Salong Construction of 9.0m x 0.40m x 0.60m covered canal 19,160.00 FinishedLazareto Construction of drainage canal at Sitio Cadre 38,475.00 Finished
Ibaba West Construction of drainage canal at Zone I, II & III 106,000.00 FinishedTOTAL PROJECT COST PhP 1,375,945.00
Name of Project: CONCRETING/REHAB OF PATHWAY , PAVEMENT
Name ofBarangay Description Project Costs STATUS
Bulusan concreting of 38Lm x 2.0 x 0.15mtr existing brgy.road atSitio Wireless 54,832.00 Finished
Bulusan concreting of 18Lm x 2.0 x 0.10mtr existing brgy road @Sitio Proper 1 14,890.00 Finished
San Antonio concreting of 115.0Lmx1.20mx0.127m thick pathway @Sitio Crossing83,980.00 Finished
Sitio PNB,Lumangbayan concreting of 1.0mx49.30mx0.075m thick pathway 16,400.00 Finished
Sitio Mataas naKahoy, Masipit concreting of 46Lm x 0.50m x0.075m pathway 9,600.00 Finished
San VicenteSouth
concreting of 105Lm x0.075m thick x 1.10m widthpathway and construction of 0.40m x 10.5m outer widthcanal w/ movable cover
14,100.00 Finished
San Antonio concreting of 15.0m x 30.0m x0.075m multi-purposepavement 203,940.00 Finished
Sitio ChurchSite, Masipit
construction of concrete pavement w/ an area of 81.31sq.m and 6"thick 53,800.00 Finished
Gutad construction of 6.0mx7.0m concrete pavement in front ofday care center 9,985.00 Finished
TOTAL PROJECT COST PhP 461,527.00
[Type the document title]
Name of Project: REHABILITATION OF BARANGAY FACILITIES
Name ofBarangay Description Project Costs STATUS
Sitio Centro,Puting-tubig Rehab of barangay outpost ( 4.26mx 5.0m) 20,000.00 Finished
Balingayan Repair of ceiling windows, steel railings gutter includingpaintings of Brgy. Hall/Day Care Center 97,300.00 Finished
Lumangbayan repair of roofing of waiting shed (6.8sq.m), includingpainting works 22,325.00 Finished
Bondoc
Rehabilitation of 10.0m x 6.0m Brgy. Hall (100%replacement of roof & roof trusses, additional of 0.50mheight of wall, replacement of doors, and installation ofwater closet and tiles and repainting of entire building
311,000.00 Finished
Sitio Bulalo,Brgy. Balite,
works included: removal of damaged roofing structure,installation of new frame & panels (portion) 17064sq.m 10,000.00 Finished
MaladRepair works included: dismantling and installation ofportion of ceiling, repair of roofing, flashing, installation ofoutlet and painting of Daycare Center
33,000.00 Finished
Canubing-I Rehabilitation of 2.0m x 4.30m HNP extension andinstallation of 2.0m x 0.60m kitchen sink 40,000.00 Finished
SilonayRehab of HNP ( replacement of water closet,installation of C.R. tile, repair of ceiling, repaintingand replacement of damage light bulb)
9,998.00 Finished
TOTAL PROJECT COST PhP 543,623.00
Name of Project: CLEARING OF ROADSIDES, RIVERSIDE, DRAINAGE, PATHWAY
Name ofBarangay DESCRIPTION Project Costs
STATUS
San VicenteEast clearing and ditching of 2500 mtrs drainage canal 20,000.00 Finished
Libis Clearing and ditching of 4000mtr drainage canal 25,000.00 FinishedIlaya clearing and ditching of 2000 meters drainage canal 125,000.00 Finished
Guinobatan Clearing of 7500 sq.m roadside and ditching of drainagecanal 25,000.00 Finished
San VicenteWest clearing and ditching of 2000 meters drainage canal 10,000.00 Finished
Guinobatan Clearing of 7500 sq.m roadside and ditching of drainagecanal 25,000.00 Finished
Balingayan Cleaning and ditching of 10.70Lm x 5.0m river/waterways 20,000.00 FinishedIbaba East clearing and ditching of 2000 meters drainage canal 10,000.00 Finished
Libis Clearing and ditching of 4000mtr drainage canal 25,000.00 FinishedSan Vicente
South Clearing and ditching of drainage canal 10,000.00 Finished
Ilaya clearing and ditching of 2000 meters drainage canal 25,000.00 FinishedSan Vicente clearing and ditching of 2000 meters drainage canal 10,000.00 Finished
[Type the document title]
WestTOTAL PROJECT COST Php 330,000.00
BARANGAY PROJECTS BENEFICIARIES
LOCATION TOTAL PROJECTCOST LOCATIONTOTALPROJECTCOST
LOCATION TOTAL PROJECTCOST
Balingayan 318,500.00 Ibaba East 25,000.00 San Vicente East 79,200.00Balite 234,600.00 Ilaya 362,800.00 San Vicente North 24,000.00Bayanan-II 99,100.00 Lazareto 38,475.00 San Vicente South 37,500.00Bayanan-I 148,630.00 Libis 270,000.00 San Vicente West 126,600.00Biga 36,000.00 Lumangbayan 333,925.00 Sta Isabel 452,700.00Bondoc 311,000.00 Malad 33,000.00 Sta. Ma. Village 337,900.00Bucayao 173,160.00 Malamig 185,480.00 Sta. Rita 37,300.00Bulusan 201,117.00 Masipit 371,830.00 Sto Niño 180,000.00Calero 60,000.00 Panggalaan 227,275.00 Silonay 267,558.00Camansihan 26,250.00 Personas 230,500.00 Suqui 489,493.00Canubing-I 117,660.00 Puting-Tubig 130,800.00 Tawagan 304,800.00Canubing-II 48,000.00 Salong 88,160.00 Tawiran 320,600.00Guinobatan 541,400.00 San Antonio 581,550.00 Tibag 165,150.00Gutad 129,885.00 San Vicente Central 99,300.00 Wawa 173,000.00Ibaba West 145,900.00
[Type the document title]
CONSTRUCTION OF DRAINAGECANAL @ Sto. Niño, Calapan City
INSTALLATION OF STREETLIGHT@ Canubing II
INSTALLATION OF WATERSYSTEM(FREE FLOWING)
Sitio Silangan, Malamig, Calapan City
Recommended