8/10/2019 Ts201 Technical Standard for Telecommunications Systems
1/55
Copyright2009
Use of this document is subject to the disclaimer on ETSA Utilities website:
www.etsautilities.com.au
TECHNICAL STANDARD TS-201
FOR
TELECOMMUNICATIONS SYSTEMS
REVISION NOTICE:
DATE EXPLANATION
August 08
Added telecommunication cable installation drawings as
Appendix A & previous Appendix A now Appendix B.
April 09
Amended ETSA Utilities specification references in
clause 3
Updated clauses 4.1.1, 4.1.2, 4.1.4 & 4.4
Updated Appendix-A A1-Shts 3, 8 & 9
Added Appendix-A A1-Shts-7.1, 7.2, 13.4 & 13.5
Updated Appendix-C, C1-Sht 1 & C1-Sht2
Added Appendix-D, D1-Sht. 1 and
Appendix-E, E1-Sht 1, 2 & 3
August 09
Minor update to the clause 5.1.1 ADSS on page 10
Restructured sections 1, 2, 3 & 4 to current standards
ISSUE: AUGUST 2009
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
2/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 2 of 55
Disclaimer refer to website: www.etsautilities.com.au
CONTENTS
1. PURPOSE........................................................................................................................ 5
2. SCOPE ............................................................................................................................. 5
3. REFERENCES................................................................................................................ 6
4. DEFINITIONS ................................................................................................................7
5. OPTICAL FIBRE SYSTEMS........................................................................................9
5.1 Overhead ................................................................................................................9
5.1.1 All Dielectric Self-Supporting (ADSS) Cable:.............................................. 9
5.1.2 Cables Owned by Third Parties (e.g. Telecommunications Carriers).......... 11
5.1.3 Optical Ground Wire / Neutral (ETSA Utilities Assets)..............................135.1.4 Fibre Management Systems and Pits ...........................................................13
5.2 Underground........................................................................................................ 15
5.2.1 Cable (ETSA Utilities Owned) .................................................................... 15
5.2.2 Ducts/Conduits ............................................................................................. 15
5.2.3 Labelling (Third Party Fibre Cable).............................................................16
5.2.4 Break out enclosures (ETSA Utilities Assets) ............................................. 16
5.2.5 Trenching ..................................................................................................... 16
5.3 Building Entry for ETSA Utilities Fibre ........................................................... 17
5.3.1 Backbone Pathways .....................................................................................17
5.3.2 Equipment Room.......................................................................................... 17
5.3.3 Building Entry points ...................................................................................17
5.3.4 Access to ETSA Utilities equipment............................................................ 17
5.4 Substation Entries for ETSA Utilities Fibre ..................................................... 18
5.5 Performance Standards ......................................................................................18
5.5.1 Dielectric Loss (ETSA Utilities Assets) ...................................................... 18
5.5.2 Wind Loading...............................................................................................18
5.5.3 Minimum Life (ETSA Utilities Assets) ....................................................... 18
6. PILOT CABLE SYSTEMS..........................................................................................19
7. MICROWAVE SYSTEMS ..........................................................................................19
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
3/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 3 of 55
Disclaimer refer to website: www.etsautilities.com.au
8. SWITCHING EQUIPMENT (ETSA UTILITIES ASSETS).................................... 19
8.1 Environmental Conditions.................................................................................. 19
8.2 Electromagnetic Interference ............................................................................. 19
8.3 Standard Equipment ........................................................................................... 19
8.3.1 Ethernet Switches......................................................................................... 19
8.3.2 Standard Ethernet Interfaces ........................................................................ 20
8.3.3 PDH Multiplexing........................................................................................ 20
8.3.4 PDH Services Last Mile Equipment ............................................................20
8.3.5 Standard PDH Interfaces.............................................................................. 20
8.4 Preferred Equipment List (ETSA Utilities Assets)........................................... 21
8.4.1 PHD (Nokia) ................................................................................................ 21
8.4.2 SDH (Alcatel)...............................................................................................219. TOWERS ....................................................................................................................... 22
APPENDIX A: THIRD PARTY TELECOM CABLE INSTALLATION DWGS .......... 23
A1-Sht. 1 Clearance to ETSA Service Mains .......................................................... 23
A1-Sht. 2 Poles with Bare Low Voltage Mains........................................................ 24
A1-Sht. 3 Poles with Low Voltage ABC Mains........................................................ 25
A1-Sht. 4 Bonding of Catenary to Stobie Pole.........................................................26
A1-Sht. 5 Power Inverter Installation Detail........................................................... 27
A1-Sht. 6.1 Poles with Transformers in Standard Position ................................... 28
A1-Sht. 6.2 Poles with Low Mounted Transformers .............................................. 29
A1-Sht. 7 Clearances - ETSA LV Mains & Telecom Cable................................... 30
A1-Sht. 7.1 Clearances - ETSA LV Mains & Telecom Cable................................ 31
A1-Sht. 7.2 Clearances - ETSA LV Mains & Telecom Cable................................ 32
A1-Sht. 8 Attachment Positions Typical Arrangement .......................................33
A1-Sht. 9 Attachment Positions on 66kV PoleTypical.......................................... 34
A1-Sht. 10.1 Typical Line Attachments ...................................................................35
A1-Sht. 10.2 Typical Line Attachments ...................................................................36
A1-Sht. 10.3 Typical Line Attachments ...................................................................37
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
4/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 4 of 55
Disclaimer refer to website: www.etsautilities.com.au
A1-Sht. 11 Typical Strain & Angle Attachments .................................................... 38
A1-Sht. 12 Typical Down Lead Attachments .......................................................... 39
A1-Sht. 13.1 Typical Line Arrangements ................................................................40
A1-Sht. 13.2 Typical Line Arrangements ................................................................41
A1-Sht. 13.3 Typical Line Arrangements ................................................................42
A1-Sht. 13.4 Typical Alley Arm Arrangements ...................................................... 43
A1-Sht. 13.5 Typical Alley Arm Arrangements ...................................................... 44
A1-Sht. 14 Typical Strain & Angle Arrangements .................................................45
A1-Sht. 15 Building Entry Arrangement .................................................................46
APPENDIX B: ETSA UTILITIES ASSETS........................................................................ 47
APPENDIX C: THIRD PARTY FIBRE OPTIC TELECOM CABLE ............................ 50
C1-Sht. 1 Break Out Enclosures............................................................................... 50
C1-Sht. 2 Break Out Enclosures............................................................................... 51
APPENDIX D: ELECTRICITY (GENERAL) REG. 1997 (AS AMENDED)...............52
D1-Sht. 1 - Table 3Clearances-Aerial Lines & Other Cables ................................. 52
APPENDIX E: RULE OF THUMB- 72 OR 144 FIBRES ON STOBIE POLES .......... 53
E1-Sht. 1 Case 1, (Rule 1 & 2) - Typical Stobie Pole Loading ............................... 53E1-Sht. 2 Case 2, (Rule 3 & 4) - Typical Stobie Pole Loading ............................... 54
E1-Sht. 3 Case 3, (Rule 5 & 6) - Typical Stobie Pole Loading ............................... 55
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
5/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 5 of 55
Disclaimer refer to website: www.etsautilities.com.au
1. PURPOSE
This Technical Standard sets out ETSA Utilities' requirements for design and
construction of operational and business telecommunications facilities owned by ETSA
Utilities and third parties using ETSA Utilities assets and sites. It provides guidelines,
third party cable installation drawings and rule of thumb for 72 or 144 fibres on stobie
poles and in ducts to insure that assets and access are not compromised.
2. SCOPE
This technical standard is intended for use by ETSA Utilities staff and contractors
involved in the design and construction of ETSA Utilities telecommunications facilities.
Additional information is included for installation of telecommunications equipment by
third parties, which is not ETSA Utilities, owned. This document also requires users to
consider the references supplied in section 3.
This technical standard is available via:
Our Intranet links -
Home/DaNM/Distribution Engineering Standards/Technical Standards & Customer
Info Brochures/Telecommunications Technical Standards.
Our Internet web page links -
http://www.etsautilities.com.au/centric/contractors_suppliers/technical_standards.jsp
The use of this document is subject to the disclaimer on ETSA Utilities website:
www.etsautilities.com.au. For further assistance and more information concerning this
technical standard please contact Telecommunications Asset Manager (TAM) on (08)
8404 5538.
http://www.etsautilities.com.au/centric/contractors_suppliers/technical_standards.jsphttp://www.etsautilities.com.au/http://www.etsautilities.com.au/http://www.etsautilities.com.au/centric/contractors_suppliers/technical_standards.jsp8/10/2019 Ts201 Technical Standard for Telecommunications Systems
6/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 6 of 55
Disclaimer refer to website: www.etsautilities.com.au
3. REFERENCES
Austel Technical Standard TS009 Installation Requirements for Customer
Cabling (Wiring Rules)
ETSA Utilities Specifications:
Refer to Telecommunications Equipment Construction Drawings included
in Appendices A, B and C for the specifications
Australian Standards:
AS2211 - Laser Safety Safety of Optical Fibre Communications Systems
AS3084 - Telecommunications Installations Telecommunications
pathways and spaces for commercial buildings
International Standards:
ITU-T - G.652 Characteristics of Single Mode Optical fibre cable
Microwave Standards (Australian Communications Authority):
RALI FX3 - Radio Assignment & Licensing Instruction (1.5GHz-58GHz)
RALI FX16 - Point to Multipoint Services
900MHz Band Plan (1992-47)
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
7/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 7 of 55
Disclaimer refer to website: www.etsautilities.com.au
4. DEFINITIONS
ETSA Utilities- ETSA Utilities means Distribution Lessor Corporation subject to a two
hundred year lease to the partnership of companies trading as ETSA Utilities or ETSA
Utilities in its own right.
ETSA Utilities, ABN 13 332 330 749, a partnership of:
CKI Utilities Development Limited, ABN 65 090 718 880.
HEI Utilities Development Limited, ABN 82 090 718 951.
each incorporated in The Bahamas
Spark Infrastructure SA (No.1) Pty Ltd, ABN 54 091 142 380.
Spark Infrastructure SA (No.2) Pty Ltd, ABN 19 091 143 038.
Spark Infrastructure SA (No.3) Pty Ltd, ABN 50 091 142 362.
each incorporated in Australia.
1 Anzac Highway, Keswick, South Australia, 5035.
ETSA Utilities' Manager - The ETSA Utilities' Manager or the authorised Officer
serving that area of the customers installation. For specific Asset Manager Areas and
their contact details please refer to ETSA Utilities internet web site
http://www.etsautilities.com.au/centric/contact_etsa.jsp and then either under
Residential Services or Business & Government tabs, browse for Service &Installation
Rules and check in Section 3, clause 3.0 & 3.1.
Must- is to be understood as mandatory.
Responsible Officer - means the officer appointed by the relevant ETSA Utilities
Manager to be responsible for the application of this document. There may be multipleResponsible Officers with specific responsibilities, e.g. negotiation for supply,
provision of transformers, specification of points of supply, types of supply, servicing
and metering.
RSO - Responsible Supervising Officer - theperson responsible for the management
and control of field personnel, resources and equipment.
Shall- is to be understood as mandatory.
Should- is to be understood as nonmandatory, i.e. advisory or recommended.
Suitable (or suitably) - means to the satisfaction of the relevant ETSA Utilities
Manager.
http://www.etsautilities.com.au/centric/contact_etsa.jsphttp://www.etsautilities.com.au/centric/contact_etsa.jsp8/10/2019 Ts201 Technical Standard for Telecommunications Systems
8/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 8 of 55
Disclaimer refer to website: www.etsautilities.com.au
Substation Site Classification:
Edge Site
An Edge/ring installation contains the minimal environmental requirements.
Usually a 48V DC system and is suitable for up to 2 standard racks. The site is
required to be secure.
Hub Site
A Hub site is defined as a medium level establishment. It may contain a 48V DC
system or diesel supply, suitable for up to 4 standard racks along with cable tray
distribution. The site has a high level of security with smoke detection and alarms.
This site is a temperature controlled environment.
Point of Presence
The Point of Presence site is classed as a large installation computer environment.
It has a dedicated building or room, with smoke detection, alarms and fire control
systems. The site also contains a 48V DC system or diesel backup supply andsuits co-occupancy with other Telecommunication carriers. The room contains
raised flooring, forced airflow and is highly secure. The room is suitable for caged
equipment and external party access.
TAM - Telecommunications Asset Manager.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
9/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 9 of 55
Disclaimer refer to website: www.etsautilities.com.au
5. OPTICAL FIBRE SYSTEMS
5.1
Overhead
5.1.1
All Dielectric Self-Supporting (ADSS) Cable:
All ETSA Utilities owned optical fibre cable must comply with the ETSA
Utilities specifications and be marked in accordance with AS2211. In orderto minimize the visual impact of the optical fibre cable the cable colour may
be dark grey or black. Other colours are not permitted.
The cable must be water blocked and have a high-density polyethylene
outer sheath. Single mode fibre is to be used as standard construction.
Standard sizes and their uses are:
12 core (No longer installed by ETSA Utilities)
24 core (No longer installed by ETSA Utilities but used by thirdparties)
56 core (No longer installed by ETSA Utilities)
60 core (No longer installed by ETSA Utilities)
72 core (Currently installed)
144 core (Currently installed in high density areas and for trunk
lines in rural centres.)
No signs are required at the pole top.
The final installed cable tension should not exceed 50% of the Ultimate
Tensile strength (UTS) of the cable. To further minimise the visual impactof the optical fibre cable it must be sagged to match the sag of adjacent low
voltage conductors.
ADSS short span optical fibre cable may be used where the span length
does not exceed 150m. Where span lengths exceed 150m, Long Span ADSS
(LSADSS) must be used.
Refer to the appropriate section of the Telecommunication Equipment
Construction drawings included in Appendices A, B & C for the approved
constructions for ADSS and LSADSS.
In its final condition, ADSS cable must not be bent in excess of
manufacturers specifications.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
10/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 10 of 55
Disclaimer refer to website: www.etsautilities.com.au
Cable Suspension:
Where open wire low voltage (LV) exists, the optical fibre cable shall be
generally located between the pole and the neutral conductor as detailed in
Appendix-A. The cable is suspended from the cross arm using a clamp as
detailed in Appendix-A. The cable may be supported from the pole only
where there is restricted clearance between the pole and the neutral. Thisarrangement allows for movement of the optical fibre cable in the vertical
plane. Cable may be strung, under tension through the specified support
clamp. In this configuration, it required that the neoprene inserts be
removed and the cable is not being allowed to sag more than 2m in the span.
Where no LV exists, the suspension clamp as shown in Appendix-A must be
used. Note that this clamp is not suitable for stringing.
The optical fibre cable must not be erected above or adjacent to HV
conductors without specific approval from the NSM.
The termination of ADSS cable is NOT permitted in any direction of (4")
100mm stobie poles. Overhead double spanning is not permitted. Balanced
tensions must always occur on 100mm poles except where a 24 core service
is required.
Refer to section 4.1.4 Fibre Management System & Pits for more details
on the following topics:
Fibre Management Systems
Cable Pits:
Cable Pits Metropolitan Area
Cable Pits CBD Area
Cable Pits Rural Area
Pit Numbering
Repair Jointing; and
Line Pole Arrangement
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
11/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 11 of 55
Disclaimer refer to website: www.etsautilities.com.au
5.1.2Cables Owned by Third Parties (e.g. Telecommunications Carriers)
The cable specifications are entirely up to the owner of the cable and must
be supplied to ETSA Utilities for pole load/strain calculations to be
undertaken. Construction detailed route drawings must be submitted to
ETSA Utilities for pole strength assessments to be undertaken at the cost of
the third party. This may be followed by Make Ready works completed by
ETSA Utilities at the cost of the third party before any stringing can occur.
In designing of third party Telco assets which are to be constructed on
ETSA Utilities asset, the design parameter must allow for tension
variations (e.g. conductor sagging) which result from changes due to
weather condition and existing ETSA Utilities span lengths and tensions.
The minimum clearance between LV conductor and Telco cable of 600mm
applies to span up to 50m. Minimum clearance for longer spans will be
determined by ETSA Utilities.
Stringing of non-ETSA Utilities telecommunications cable must be in the
carrier window on the pole which is an area between 1.4m and 1.8m below
the LV conductor level on the road side of the pole, unless passing a pole
mounted transformer. Refer to Appendix-A for more detail. The position
within this window will be determined by ETSA Utilities for each applicant.
Where the preferred position (1.8m below LV) is already occupied or is
technically unsuitable, e.g. Due to truck clearances, then ETSA Utilities will
attempt to provide an alternative attachment position, usually 1.5m below
the cross-arm.
All completed works drawings must be returned to ETSA Utilities within 30days of construction for updating of Facilities Access records, with clear
details of the route and number of poles accessed.
Where non-ETSA Utilities overhead telecommunication cable needs to
cross a high load corridor or railway/tramline then it must be placed
underground. Where non-ETSA Utilities overhead telecommunication cable
needs to cross roads then clearances to the carriageway specified in the
Electricity Act 1996 and Electricity (General) Regulations, Schedule 2,
Table 3 (refer Appendix-D, Table 3 - for GUIDE ONLY), must be
achieved without raising attachment points on the adjacent poles or place
the cable underground.
Refer Appendix D, Table 3 (for GUIDE ONLY) for the clearance distances
for aerial service lines and other cable systems. This table is extracted from
the Electricity (General) Regulations 1997, Schedule 2 Requirements for
aerial lines. For current and accurate details refer to latest revision and
publication of Electricity (General) Regulations 1997.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
12/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 12 of 55
Disclaimer refer to website: www.etsautilities.com.au
Attachment to the poles must be by pole clamps as shown in the following
drawings, e.g. Appendix A1 sheet 10.2 and not by attachments requiring
extra holes to be drilled into the steel sides or concrete of the ETSA Utilities
poles.
In some circumstances Make Ready works may be required prior tostringing cable without a catenary which will be determined by ETSA
Utilities as part of assessing the FAA application. If the work is planned by
ETSA Utilities, such as pole replacements for maintenance purposes, the
applicant will need to wait until the work is completed by ETSA Utilities or
select an alternate route.
Where work is required to make room in the carrier window e.g. by
removing redundant equipment, this will be at the applicants cost. If the
redundant equipment is electrical or associated with electrical equipment
e.g. street light switch wires, ETSA Utilities will determine if it can be
removed safely by the applicant as part of stringing or not. If the equipment
is redundant telecommunications assets then ETSA Utilities will specify
removal as part of the applicants stringing works.
NB: If removing Optus Pay TV cable, in all instances the catenary must not
be removed or obstructed.
When stringing at the 1.5m below LV height, the first Third Party to be
given access will remove any existing Optus Pay TV cable (but leave the
catenary) and install a short cross arm, at their cost, as shown in Appendix
A1 sheet 8. The third Party will be given a consistent position on the crossarm next to the pole or at the outer end of the arm. Removal of any waste
material is the responsibility of the Third Party.
Before stringing at the 1.5m below LV height, the stobie pole strength
visual inspection (i.e. rust at base, cracks, bend or any other damages)
should be carried out and referred to ETSA Utilities for assessment of
reduction of pole strength. Refer to Appendix-E E1-Sht 1 as a GUIDE
ONLYfor typical stobie pole loading.
If any existing O/H arrangement is outside the parameters covered in
Appendix-E such as other third party assets already installed (e.g. Pay TV orPilot cables) then this must be forwarded to the ETSA UtilitiesFacilities
Access & Projects Coordinator for further assessment. ETSA Utilities-
Manager Network Assets approval and sign off is required before any route
design is finalised and any work can commence.
For facilities access applications, the single point of contact is Darren Smith
Facilities Access and Projects Coordinator (08) 8404 5399 or if
unavailable Peter Dean Manager Network Projects (08) 8404 5064.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
13/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 13 of 55
Disclaimer refer to website: www.etsautilities.com.au
5.1.3Optical Ground Wire / Neutral (ETSA Utilities Assets)
All optical fibre cable must comply with the ETSA Utilities specifications.
In summary, the OPGW optical fibre cable is of loose tube construction
with 12 fibres per tube and a GRP core. The cable has a solid metal sheath
surrounding the optical fibre tubes. The sheath is surrounded by strands of
the electrical conductor. Fibres are single mode.
Refer to the appropriate section of the Telecommunication Equipment
Construction drawings included in Appendices A, B & C for the approved
constructions for OPGW.
Standard sizes and their uses are:
12 core Radial spurs
60 core Radial spurs
Signs must be installed at the pole top adjacent the OPGW and OPGN
conductor to identify the cable as containing optical fibres.
The final installed cable tension should not exceed 20% of the Ultimate
Tensile strength (UTS) of the cable.
In its final condition, OPGW cable may not be bent in a radius less than 10
times the diameter of the cable. During stringing, the cable may be
temporarily bent up to 20 times the diameter of the cable, provided the bend
is not supported by any sharp edge.
Cable Suspension:
In all cases, the OPGW cable is installed above the high voltage cable and
OPGN may be installed as a LV neutral or as a CMEN conductor.
5.1.4Fibre Management Systems and Pits
Fibre Management Systems:
All fibre management systems FIST/FOSC/etc shall be labelled in
accordance with Appendix B-3. In all metropolitan areas ETSA Utilities
shall utilise FIST enclosures for jointing. All fibre management systemlocation and numbering shall be included on all construction drawings.
The arrangement of cable and fittings within pits must comply with the
requirements of ETSA Utilities specifications and Appendix C1 for third
party assets. Especially the notes on sheet 3 where there are 2 existing 288
core fibres (or equivalent) in a P9 pit. Where space is critical and a variation
is required seek specific Facilities Access approval.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
14/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 14 of 55
Disclaimer refer to website: www.etsautilities.com.au
Cable Pits:
All fibre optic cable will be installed in line with Appendix-C with
sufficient access points to enable expansion and repair of the network.
Generally this will include the following.
Cable Pits Metropolitan:Pits shall be located at intervals of not less than 2500m and not more
frequently than 2000m unless required for immediate access. Cable
management systems such as FIST/FOSC enclosures shall be installed
only where required for immediate access or where required for
joining cables during construction.
P9 pits will be used in these areas. Additional cable of between 80-
100m shall be installed in all pits.
Cable Pits CBD Area:
Pits shall be located at intervals of no less than 700m. P9 pits shall be
used in these areas to contain additional cables and FIST/FOSC cable
arrangement systems. Additional cable of between 30-100m shall be
installed in all pits. Unless exceptional circumstances exist, additional
cable SHALL NOT be stored in the CBD manholes.
Cable Pits Rural Area:
P9 Pits will be used in rural areas. Additional cable of between 80 &
100m shall be stored in cable pit.
Pit Numbering:All pits shall be numbered in accordance with Appendix B-2. Pit numbers
shall be included on all constructions.
Repair Jointing:
Jointing will only occur in pits.
Line Pole Arrangement:
Arrangement details are not required to be resolved for line poles (i.e. Poles
with less than 20% deviation) during the design process.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
15/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 15 of 55
Disclaimer refer to website: www.etsautilities.com.au
5.2 Underground
5.2.1
Cable (ETSA Utilities Owned)
All optical fibre cable must comply with the ETSA Utilities specifications
and be marked in accordance with AS2211. The cable must be stamped with
the words ETSA at 1m intervals.
In summary, the underground optical fibre cable is of loose tube
construction with 12 fibres per tube and a GRP core. The cable is water
blocked and has a high density polyethylene outer sheath and nylon sheath.
Fibres are single mode.
Standard sizes and their uses are:
12 core Building entry & radial spurs
24 core (No longer installed)
48 core (No longer installed)
60 core Metro (No longer installed)
72 core Metro Current
144 core (No longer installed)
288 core CBD Current
5.2.2Ducts/Conduits
Where optical fibre cables are to be installed in ducts or conduits, the fibre
cable shall be encased inside 32mm polyethylene sub-duct.
Where fibre is to be installed in spare duct/conduit, a sub-duct is required.Fibre (in sub-duct) may be installed in the same duct/conduit as existing LV
power cables (but not in ducts with HV power cables) where physically
practical (e.g. few bends) if no Telco ducts are present.
Refer to the appropriate section of the Telecommunication Equipment
Construction drawings included in Appendices A, B & C for the approved
constructions for Underground Optical fibre cable.
In its final condition, ADSS cable must not be bent in excess of
manufacturers specifications.
Where non-ETSA Utilities fibre/cable is installed in ETSA Utilities ducts or
pits this requires prior approval by ETSA Utilities and falls under a
Facilities Access agreement.
The work must comply with the following specifications for labelling and
trenching. Third Party fibre must be in sub ducts which must be labelled.
This applies whether in telecommunications ducts or electricity ducts.
Where an observer is required to open and work in ETSA Utilities
telecommunications pits as part of the access approval this will be at the
applicants cost.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
16/55
TS-201 Technical Standard for Telecommunications Systems
5.2.3Labelling (Third Party Fibre Cable)
The optical fibre cable must be labelled in accordance with AS/NZS2211.1.
5.2.4
Break out enclosures (ETSA Utilities Assets)
Break out enclosures shall be installed adjacent to the site and as requiredby the network design. Enclosures shall be installed in accordance with
Appendix-C, C1-Sht 1 (pit mounted) or Appendix-C, C1-Sht 2 (wall
mounted). Sufficient spare cable (80-100m) must be provided in both the
incoming and outgoing cables so that the enclosures may be removed and
placed within a clean environment during splicing. This is also to allow for
repair and expansion of the network.
5.2.5Trenching
Reinstatement shall be consistent with good industry practices. Compaction
to ensure that subsidence does not occur is required in the metropolitan area.
Trench Diagram:
400
200
Warningtape
Telecommunicationconduit
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 16 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
17/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 17 of 55
Disclaimer refer to website: www.etsautilities.com.au
5.3 Building Entry for ETSA Utilities Fibre
In general, ETSA Utilities will install telecommunications main backbone and
alternative backbone (if requested) to an equipment rack installed in the main
equipment room. Where the connection to the ETSA Utilities network is directly
to a main core network fibre, ETSA Utilities will utilise a FIST enclosure in a pit
outside the premises. Where the connection is to a radial spur the connection will
be direct to the equipment rack, with 20m of spare fibre installed if possible. The
spare fibre shall be placed in a suitable location inside the building. Design and
installation of telecommunications cabling and equipment shall be in accordance
with AS3084 Telecommunications Installations Telecommunications
pathways and spaces for commercial buildings.Specific references are provided
below:
5.3.1Backbone Pathways
Installation will comply with;
Refer section 3 of AS3084 Telecommunications Installations
Telecommunications pathways and spaces for commercial buildings.
5.3.2Equipment Room
Installation will comply with;
Refer section 6 of AS3084 Telecommunications Installations
Telecommunications pathways and spaces for commercial buildings.
5.3.3
Building Entry points
Installation will comply with;
Refer section 7 of AS3084 Telecommunications Installations
Telecommunications pathways and spaces for commercial buildings.
Installations may be made in conduits containing LV power cables where
the fibre cable uses a sub duct (refer 4.2.2).
5.3.4
Access to ETSA Utilities equipmentWhere the building is not owned by the customer, written permission and an
access agreement must be provided to ETSA Utilities by the building owner
prior to installation of ETSA Utilities cabling or equipment.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
18/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 18 of 55
Disclaimer refer to website: www.etsautilities.com.au
5.4 Substation Entries for ETSA Utilities Fibre
All substation sites shall be classed as Edge, Hub or Point of Presence (POP)
sites. Entry to Edge, Hub and POP sites will require duplicate diverse entry.
Where the Hub site is not required to be established immediately suitable spare
fibre may be temporarily on site but not terminable. Where a POP site is not
required to be established immediately all fibre entry must be terminated in the
first installation.
Substation property access by third parties for installation of telecommunications
equipment requires an application for a site licence under the Facilities Access
Agreement. The site licence will impose strict conditions regarding access to
substations by third parties and will require a safety observer unless the third
party is an endorsed contractor. Such access will also be conditional on ETSA
Utilities requirements at that time. Wherever possible the third parties equipment
should be installed outside of the earth grid area of the substation. This would
usually entail use of part of the landscaped area around the outside of the securityfence and enable third party access to equipment without an ETSA Utilities
observer.
All Third party huts or cabinets when installed will require a separate electricity
supply from the street via the supply connection process.
Where equipment is inside the substation as other options are not practicable,
ETSA Utilities will specify the construction and access details. If access requires
entry into the substation area then an Access Permit and observer is required for
each instance at the applicants cost. Processing of access applications by ETSA
Utilities NOC usually takes 10 days.
Fibre entering a substation to a ETSA Telecommunications hut which has third
party racks, is the property of ETSA Utilities from the pit to the hut.
5.5
Performance Standards
5.5.1Dielectric Loss (ETSA Utilities Assets)
All cables will be subjected to an insertion loss test. 1.5dB/km is the
maximum permissible insertion loss. A time domain reflectometry based
test is not required.
5.5.2Wind Loading
Where the fibre optic cable span exceeds 150m or on poles with less than 3
conductors, wind loading effects on the Stobie poles must be considered.
Wind loading effect is to be determined in accordance with TS107 (Over
head line design) where non-ETSA Utilities fibre is to be installed. This
issue would require Make Ready works at the applicants cost.
5.5.3Minimum Life (ETSA Utilities Assets)
All fibre cables must be installed in a manner consistent with a 25 year assetlife.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
19/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 19 of 55
Disclaimer refer to website: www.etsautilities.com.au
6. PILOT CABLE SYSTEMS
Still to be completed
7.
MICROWAVE SYSTEMS
Still to be completed
8. SWITCHING EQUIPMENT (ETSA UTILITIES ASSETS)
8.1 Environmental Conditions
Switching equipment shall be located in an environment suitable for the reliable
operation of the equipment. Generally a suitable environment will be achieved for
access nodes by locating the equipment within a ceramic walled building without
air conditioning.
Climate control for core switching sites shall comprise air conditioning. Air
conditioning shall be reverse cycle sized to provide a maximum temperature of nomore than 27C in an ambient temperature of 45C. Core sites shall include
remote alarming for temperature > 31C.
8.2 Electromagnetic Interference
Switching equipment with copper cable shall be located in a separate room from
the 11kV and higher switching equipment. Typically this will be achieved by
locating equipment in a separate Substation Control Room or in a separate
building.
8.3
Standard Equipment
8.3.1Ethernet Switches
Standard Ethernet switching equipment shall include as a minimum, the
following:
Dual power supplies for chassis power supply diversity.
Diversity of ring distribution cards for provision of diversity in feeds
for fibre optic (Gig bit Ethernet) core and service rings.
Sufficient slots and cards to allow for services to be re-patched upon
the event of a single card failure.
Ethernet switches shall be supported by a 48V DC system with 24
hours capacity and dual power supplies.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
20/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 20 of 55
Disclaimer refer to website: www.etsautilities.com.au
8.3.2Standard Ethernet Interfaces
Standard Customer Interfaces shall conform to the following standards:
10 or 100 Mbps Ethernet services:
IEEE 802.3 Ethernet 10 Base TX and 100 Base TX
And will be provided on twisted pairs copper cabling (Category 5 or
Category 6) and terminated on a RJ-45 connector.
Gigabit Ethernet services:
IEEE 802.2 1000Base SX interface over Multi Mode Optical Fibre
with an SC connector.
IEEE 802.2 1000Base LX interface over Single Mode Optical Fibre
with an SC connector.
IEEE 802.2 1000Base ZX interface over Single Mode Optical Fibre
with an SC connector.
8.3.3PDH Multiplexing
Standard PDH Multiplexing shall be limited to individual services of no
larger than 8Mbps with a total capacity of no more than 34Mbps.
PDH Multiplexes shall be supplied via a 48V DC system with a capacity of
at least 24 hours.
8.3.4PDH Services Last Mile Equipment
Standard PDH equipment shall comprise Nokia PDH equipment which shallbe monitored via the existing CNMS equipment located at Access Nodes
and shall be based upon a Nokia Rack with PDH cards as required.
8.3.5
Standard PDH Interfaces
Standard PDH Interfaces shall be;
E1 - Clear Channel or Framed:
These 2,048Mbps services will conform to the following standards:
ITU-T G.703
ITU-T G.704
ITU-T G.706
ITU-T G.732
E1 services are terminated to either a 120 balanced twisted pair
connection terminated on Drone LSA-Plus Modules, RJ45 socket.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
21/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 21 of 55
Disclaimer refer to website: www.etsautilities.com.au
E3 - Conforming to Standards:
This 34.368Mbps service will conform to the following standards:
ITU-T G.703
ITU-T G.704
ITU-T G.804
ITU-T I.432E3 services are terminated using a coaxial 75 unbalanced female BNC
connector.
DS3 - Conforming to Standards:
This 44.736Mbps service will conform to the following standards:
ITU-T G.703
ITU-T G.804
ITU-T I.432
ANSI T1.102
DS3 services are terminated using coaxial 75 unbalanced female BNCconnector.
STM-1 - Conforming to Standards:
This 155.520Mbps service will conform to the following standards:
ITU-T G.957
ITU-T I.432
ITU-T G.707
ITU-T G.783
STM-1 services are as optical interfaces by way of single mode SC type
connectors as specified in IEC 86B.3.27.
Source Wavelength 1310 nm
Type of fibre ITU-T G.652
STM Level S-1.1 or L-1.1
8.4 Preferred Equipment List (ETSA Utilities Assets)
8.4.1PHD (Nokia)
Optical to Copper interfaces:
2 & 8Mb/s DF2-8 Short haul TA21513
Long haul TA21518
34Mb/s DF34 Short haul TA21533Long haul TA21532
Multiplexers:
Second Order DM8 21300
Third Order DM34 21320
8.4.2
SDH (Alcatel)
1642
1650
1662
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
22/55
TS-201 Technical Standard for Telecommunications Systems
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 22 of 55
Disclaimer refer to website: www.etsautilities.com.au
9. TOWERS
ETSA Utilities shall use 3 preferred towers and masts. These are known as:
Heavy Duty Lattice (Three sided)
Heavy Duty Lattice (Four sided)
Steel Mono Pole
Towers will be located preferable within ETSA Utilities fenced Substations, where
towers cannot be located inside serviced substations. Where this is not possible, ETSA
Utilities standard process is to purchase a suitable portion of land to locate the tower
on. Alternatively, ETSA Utilities will consider site sharing options if available.
Towers shall be designed to have a return period of 25 years.
Towers shall be designed for a minimum life before refurbishment of 15 years.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
23/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
APPENDIX A: THIRD PARTY TELECOM CABLE INSTALLATION DWGS
A1-Sht. 1 Clearance to ETSA Service Mains
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 23 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
24/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 2 Poles with Bare Low Voltage Mains
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 24 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
25/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 3 Poles with Low Voltage ABC Mains
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 25 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
26/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 4 Bonding of Catenary to Stobie Pole
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 26 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
27/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 5 Power Inverter Installation Detail
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 27 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
28/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 6.1 Poles with Transformers in Standard Position
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 28 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
29/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 6.2 Poles with Low Mounted Transformers
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 29 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
30/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 7 Clearances - ETSA LV Mains & Telecom Cable
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 30 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
31/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 7.1 Clearances - ETSA LV Mains & Telecom Cable
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 31 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
32/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 7.2 Clearances - ETSA LV Mains & Telecom Cable
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 32 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
33/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 8 Attachment Positions Typical Arrangement
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 33 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
34/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 9 Attachment Positions on 66kV PoleTypical
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 34 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
35/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 10.1 Typical Line Attachments
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 35 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
36/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 10.2 Typical Line Attachments
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 36 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
37/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 10.3 Typical Line Attachments
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 37 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
38/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 11 Typical Strain & Angle Attachments
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 38 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
39/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 12 Typical Down Lead Attachments
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 39 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
40/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 13.1 Typical Line Arrangements
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 40 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
41/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 13.2 Typical Line Arrangements
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 41 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
42/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 13.3 Typical Line Arrangements
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 42 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
43/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 13.4 Typical Alley Arm Arrangements
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 43 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
44/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 13.5 Typical Alley Arm Arrangements
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 44 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
45/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 14 Typical Strain & Angle Arrangements
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 45 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
46/55
TS-201 Technical Standard for Telecommunications Systems Appendix A
A1-Sht. 15 Building Entry Arrangement
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 46 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
47/55
TS-201 Technical Standard for Telecommunications Systems Appendix B
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 47 of 55
Disclaimer refer to website: www.etsautilities.com.au
APPENDIX B: ETSA UTILITIES ASSETS
B-1 - Fibre Cable Numbering:
Fibre Cable numbering shall use the following convention. Each cable shall be allocated
a serial number based on the following:
FC000(X)
Where X in the serial number indicates a number within an incremental numeric
sequence used to identify each cable. The register sequence begins at 1 and increments
each time a new pit is allocated. As an example, the third cable allocated to the register
will have the serial number FC000 (3). Prior to allocating a serial number it is a
requirement to check the fibre cable register to ensure that the number has not already
been used. Having then been allocated a number to create a unique serial number it
must be logged in the register to ensure that its use is not replicated. As part of the
register logging process ensure that all the other detail fields have been completed.
During construction of the network cables they shall be numbered separately based
upon the following;
Where two cables intersect at a splice, each cable will be allocated a separate serial
number.
Where a cable enters and exits a fibre pit and a coil of fibre is provided, the cable
entering and exiting the pit will have the same serial number.
Where a cable enters a fibre pit and passes into an enclosure, the cable that enters and
the cable that exists will be allocated a separate serial number.
B-2 - Fibre Pit Numbering:
Pit numbering shall use the following convention. Each pit shall be allocated a serial
number similar to the following:
FP000(X)
Where X is a number within an incremental numeric sequence used to identify the pits.
The sequence begins at 1 and increases each time a new pit is allocated to the register.
As an example, the third pit allocated to the register will have the serial number
FP00(3). Prior to the allocation of a serial number it is a requirement to check the fibre
pit register to ensure that the number has not already been used. Having then beenallocated a number to create a unique serial number it must be logged in the register to
ensure that its use is not replicated. As part of the pit register logging process ensure
that all the other detail fields have been completed.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
48/55
TS-201 Technical Standard for Telecommunications Systems Appendix B
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 48 of 55
Disclaimer refer to website: www.etsautilities.com.au
B-3 - Communication Management System Numbering:
Communication Management System numbering shall use the following convention.
Each management system shall be allocated a serial number similar to the following:
BOE-FP0001-EG140001
The serial number is specific; it identifies the type of enclosure as well as a unique
location. The first three letters indicate the functionality of the communications
management system; in this case it identifies the type: breakout enclosure. Next in the
sequence is the location identifier specified by the pit number that the system is located
in (serial number specified above).
The final part of the serial number specifies the type of enclosure itself. In this
particular case it uses the prefix (EG) to identify the Egger ton enclosure. The
remaining numerals used to complete the serial number are created using an incremental
numeric sequence used to identify each system. The sequence begins at 1 and increaseseach time a new management system is allocated to the register.
As an example, the third Egger ton enclosure located in pit 3 will have the serial
number
(BOE-FP0003-EG140003)
Prior to allocating a number it is a requirement to check the Communications
management system register for number allocation to ensure that the number has not
already been used. Having then been allocated a number it must be logged in the
register to ensure that its allocation is not replicated. As part of the register loggingprocess ensure that all the remaining fields associated with the system allocated are
completed.
B-4 - Service Numbering:
A Service Number is provided to each customer so that an initial connection point into
the telecommunications network can be identified. The Service Number may contain up
to three parts, each of which provides a different set of information.
An example of a three part Service Number is shown below.
FC0020-0001-PORTADEL
Most Service Numbers will only contain the first two fields with the last field, an 8 digit
location identifier not being required. The site identifier is only included upon the
request of the customer, where the structure of their service requires it.
The first six digits of the Service Number use the serial number allocated to the cable at
the first point of entry into the network from the main customer premises. This cable
itself will be numbered in the first instance according to Appendix B1. In the case of a
redundant network the standard approach is to choose the lowest of the two fibre cable
numbers that are connected to the switch. This serial number is then allocated to the
Service Number as previously mentioned.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
49/55
TS-201 Technical Standard for Telecommunications Systems Appendix B
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 49 of 55
Disclaimer refer to website: www.etsautilities.com.au
The second four digits of the Service Number indicate the time slot allocated for the
service on the fibre pair. The telecommunications network has been designed so that
multiple services can share the same fibre path via multiplexing techniques. A service
that has been allocated the first time slot of a fibre pair is allocated the next four digits
of the service number: 0001, as shown above. When other services are allocated to the
remaining timeslots, the numeric numbering sequence reflects their position in the timedomain.
The 8 digit identifier is only added to the Service Number due to the specific design of
the network and in the instance where the customer requests it. It is included to identify
customer premises (physical locations) that the service is routed to. In this instance the
customer has a specific requirement to identify parts of their network. The standard
requires that all services connected to same customer premises use the same 8 digit
identifier. The example Service Number identifies Port Adelaide as a key customer
premises location for the service.
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
50/55
TS-201 Technical Standard for Telecommunications Systems Appendix C
APPENDIX C: THIRD PARTY FIBRE OPTIC TELECOM CABLE
C1-Sht. 1 Break Out Enclosures
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 50 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
51/55
TS-201 Technical Standard for Telecommunications Systems Appendix C
C1-Sht. 2 Break Out Enclosures
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 51 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
52/55
TS-201 Technical Standard for Telecommunications Systems Appendix D
APPENDIX D: ELECTRICITY (GENERAL) REG. 1997 (AS AMENDED)
D1-Sht. 1 - Table 3Clearances-Aerial Lines & Other Cables
Use as GUIDE ONLY
Regulations - Schedule-2: Requirements for aerial lines
TABLE 3: Clearance distances for aerial service lines and other cable systems
Location of Line Clearance Distance
(in metres)
Over a road or part of a road specified by the Technical Regulator as
being a preferred route for vehicles with loads exceeding the height
restrictions under Part 4 of theRoad Traffic Act 1961
6.5
Over any part of a main road within the meaning of theHighways
Act 1926
5.5
Over the centre of each carriageway of a public road 5.5
Over any other part of a road 4.6
Over any part of a driveway 3.0
Elsewhere 2.7
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 52 of 55
Disclaimer refer to website: www.etsautilities.com.au
http://www.austlii.edu.au/au/legis/sa/consol_act/rta1961111/http://www.austlii.edu.au/au/legis/sa/consol_act/ha1926113/http://www.austlii.edu.au/au/legis/sa/consol_act/ha1926113/http://www.austlii.edu.au/au/legis/sa/consol_act/ha1926113/http://www.austlii.edu.au/au/legis/sa/consol_act/ha1926113/http://www.austlii.edu.au/au/legis/sa/consol_act/rta1961111/8/10/2019 Ts201 Technical Standard for Telecommunications Systems
53/55
TS-201 Technical Standard for Telecommunications Systems Appendix E
APPENDIX E: RULE OF THUMB- 72 OR 144 FIBRES ON STOBIE POLES
E1-Sht. 1 Case 1, (Rule 1 & 2) - Typical Stobie Pole Loading
Use as GUIDE ONLY
CASE 1 (Figure - 1.0):
New Fibre Dead-End on (Weak Direction) 9m or 12m Stobie Poles:
(N.B: Powerlines spans not exceeding 60m)
FIGURE 1.0
STOBIE POLE (Weak Direction)
ETSA O/H HV&LV
NEW FIBRE DEAD-END
ETSA O/H HV&LV
a
STOBIE POLE (Strong Direction)
In CASE-1, (a) If 9m Stobie poles with O/H LV only, then apply rule (1):
RULE (1):
Stobie Pole
a in mm (& in
inches)
For 72 or 144 Fibre Span
Length
(in metres)
100 (4") Never Install
125 (5") up to 120
155 (6") up to 200
In CASE-1, (b) If 12m Stobie poles with normal O/H HV&LV, then apply rule (2):
RULE (2):
Stobie Pole
a in mm (& in inches)
For 72 or 144 Fibre Span Length
(in metres)
100 (4") Never Install
125 (5") up to 100
155 (6") up to 200
TS-201 Issue: August 2009 Authorised: Jehad ALI Date: 21/08/09 Page 53 of 55
Disclaimer refer to website: www.etsautilities.com.au
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
54/55
8/10/2019 Ts201 Technical Standard for Telecommunications Systems
55/55
TS-201 Technical Standard for Telecommunications Systems Appendix E
E1-Sht. 3 Case 3, (Rule 5 & 6) - Typical Stobie Pole Loading
Use as GUIDE ONLY
CASE 3 (Figure - 3.0):
New Fibre Dead-End (Strong Direction) 9m or 12m Stobie Poles:
(N.B: Powerlines spans not exceeding 60m)
ETSA O/H HV&LV
CONDUCTORS
STOBIE POLE
(Weak Direction)
NEW FIBRE DEAD-
a
STOBIE POLE
(Strong Direction)
FIGURE 3.0
In CASE-3, (a) If 9m Stobie poles with O/H LV only, then apply rule (5):RULE (5):
Stobie Pole
a in mm (& in inches)
For 72 or 144 Fibre Span Length
(in metres)
100 (4") Never Install
125 (5") Never Install
155 (6") up to 200
In CASE-2, (b) If 12m Stobie poles with normal O/H HV&LV, then apply rule (6):
RULE (6):Stobie Pole
a in mm (& in
inches)
For 72 or 144 Fibre Span
Length
(in metres)
100 (4") Never Install
125 (5") Never Install
155 (6") Calculations Required
179 (7") Calculations Required
Recommended