View
217
Download
0
Category
Preview:
Citation preview
8/8/2019 Transition 10 - PUNE (23 9 2010)
1/20
23 October, 2010 (Saturday)
Symbiosis Auditorium, Pune
transition10pun@cognizant.com
8/8/2019 Transition 10 - PUNE (23 9 2010)
2/20
What is transITion ?
Transition is a tech forum open only to Final year (2011) students of
BE /B Tech /ME /M Tech/ MCA
Transition seeks to enhance technical skills and inculcate in the
students a spirit of entrepreneurship, before they step into the
corporate world
Opportunity to interact with industry experts
Avenue for students to be exposed to latest trends and happenings in
the technology world
Prizes worth lakhs waiting for the winners
8/8/2019 Transition 10 - PUNE (23 9 2010)
3/20
3
i-Tech Speak
(Paper Presentation)
8/8/2019 Transition 10 - PUNE (23 9 2010)
4/20
4
iTech Speak (Paper Presentation)
Topics
Cloud Computing
IT in healthcare
Power of Wireless : Deployment in real-life governance
Bioinformatics in Human Welfare
Secure YOURSELF : Indomitable YET Economical
Evaluation Criteria
Scope and reach of impact
Adaptability of the solution to changing needs
Sustainability of the solution
Innovation / Choice of Solution
Ease of implementation
8/8/2019 Transition 10 - PUNE (23 9 2010)
5/20
Nomination Round
Each college can send a maximum of 3 teams. Only 2 students per team.Ssingle member team is not allowed
Submit an abstract in approx. 1000 words in MS Word format (Verdana
Font 10, double spacing, 1 margin on all sides)
Participant details and abstract to be sent across to the College
Placement Officer as per the Last Date specified Top 10 entries will qualify for the final round
All qualifying teams will be informed through email
Final Round
Shortlisted teams to submit a MS PowerPoint ppt on the date of theevent
Each team will be given a maximum of 15 minutes for the ppt.
Prototypes, Proof of Concepts or other aids are not mandatory but may
be used for supporting a concept
iTech Speak: Rules & Regulations
8/8/2019 Transition 10 - PUNE (23 9 2010)
6/20
6
Mission Intermission: Camera, Action, Cut!
(Movie Making Contest)
8/8/2019 Transition 10 - PUNE (23 9 2010)
7/207
Mission Intermission: Rules & Regulations
A maximum of 2 teams from a college can participate
Each team to comprise a maximum of 10 members
Actors and film technicians need to be team members only
Language of the movie: English
Length of the film should be between 3 - 5 minutes only
The movie should be on any of the following themes:
The passion to make a difference Global Warming A documentary
Life is a Journey. . .
Reality Shows a mock u mentary
Following content is mandatory:
Movie Title
Credits with each team members role in film-making
Details of the equipment and software applications used
8/8/2019 Transition 10 - PUNE (23 9 2010)
8/208
Mission Intermission
The entire team to be present on the day of the event
Each team will have 10 min to promote their movie to the panel of
judges and present their case.
The final evaluation to be based on creativity of both the film and the
promotion
Participant details to be sent across to the College Placement Officer
as per the Last Date specified Final movie to be submitted to the College Placement Officer in mpeg
format (in a CD) as per Last Date Specified
8/8/2019 Transition 10 - PUNE (23 9 2010)
9/209
Awe
(General Quiz)
8/8/2019 Transition 10 - PUNE (23 9 2010)
10/20
Awe: Rules & Regulations
Team should comprise only 2 members
No limit on the number of teams per college
There will be 2 rounds: Prelims and Finals
Top 6 teams from the prelims round will enter the finals
Participant details should be sent across by College Placement Officer
as per the Last Date Specified
8/8/2019 Transition 10 - PUNE (23 9 2010)
11/20
Ultimate Techie
8/8/2019 Transition 10 - PUNE (23 9 2010)
12/20
The Ultimate Techie: Rules & Regulations
A platform for students to compete and assess their knowledge across
disciplines
Open to all final year students across all disciplines of engineering
No limit on the number of participants from each college
Individual event
Two rounds
I Round: Written Test (covering general engineering concepts)
II Round: Case Study Presentation (to be shortlisted from I Round)
Participant details should be sent across by college placement officer
as per the Last Date Specified
8/8/2019 Transition 10 - PUNE (23 9 2010)
13/2013
Panorama
(Stall Design Competition)
8/8/2019 Transition 10 - PUNE (23 9 2010)
14/20
Panorama
Only 2 teams per college with no restriction on team size
Each college will be provided a stall to showcase their creativity
Stall design needs to be on one of the following themes:
Green IT
Innovation in hygiene maintenance at public place
Social Software for enterprises
Human Computer Interfacing (HCI ) beyond conventional tools (usingspeech recognition and other methods )
8/8/2019 Transition 10 - PUNE (23 9 2010)
15/20
Panorama
Rules and Regulations:
You will be provided a 3m X 3m stall At least one team member to be present in the stall through the
event to explain the concept to visitors. Presentation to visitors will
be an important evaluation criteria.
While the stall will be provided by Cognizant, all other materials will
have to be procured by the institute
Participant details to be sent across to the College Placement Officer as
per the Last Date specified
8/8/2019 Transition 10 - PUNE (23 9 2010)
16/20
Conundrum: Enter..ExploreConquer
(Tech Treasure Hunt)
8/8/2019 Transition 10 - PUNE (23 9 2010)
17/20
Conundrum
Only 1 team per college. Each team to have 2 members
Each activity will test your analytical skills & IQ
Further details shall be disclosed on the day of the event
Participant details should be sent across by College Placement Officer
as per the Last Date Specified
8/8/2019 Transition 10 - PUNE (23 9 2010)
18/20
General Instructions
8/8/2019 Transition 10 - PUNE (23 9 2010)
19/20
General Instructions
TransITion contests open only to Final Year ( 2011 ) students of BE /B
Tech /ME /M Tech/ MCA
Placement Officers and senior faculty members are cordially invited
Lunch and refreshments will be borne by Cognizant
Deadlines for preliminary rounds of the contests to be strictly adhered
to
Decision of Cognizant in all aspects will be final and binding
8/8/2019 Transition 10 - PUNE (23 9 2010)
20/20
Dates to Note
Recommended