The University of Texascee.utexas.edu/ce/petex/files/forms/Production.pdf · The Universi The...

Preview:

Citation preview

For m

ore info about PE

TE

X, check out our W

eb site at ww

w.utexas.edu/ce/petex

www.utexas.edu/ce/petex

Th

e U

niv

er

sit

y o

f T

ex

asT

he

Un

ive

rsiT

y o

f T

ex

as

Co

nt

inu

ing

Ed

uc

at

ion

Petroleu

m exten

sion

service

1 University Station, R

8100A

ustin, TX

78712-1100

Enrollment InformationYour company is invited to participate in these training programs. For additional information, contact—

PETEXHouston Training CenterThe University of Texas2700 W. W. Thorne Blvd.Houston, TX 77073Tel: 800.687.7052or 281.443.7144FAX: 281.443.8722Email: petexhtc@www.utexas.edu

PETEX Production

Courses ➤ Production Technology

➤ Completion and Workover

www.utexas.edu/ce/petex

other PeteX Courses

Advanced Petroleum MeasurementBasic Petroleum MeasurementElectrical Maintenance FundamentalsElectrical Maintenance—Equipment and ApplicationElementary DrillingElementary Electronics for Nonelectrical PersonnelEngine and Compressor OperationsField Handling and Plant Processing of Natural GasGauging, Testing, and Running of Lease TanksHydraulics for Pipeline EngineersHydraulics for Pipeline OperatorsInstruments and ControlsIntroduction to Offshore OperationsIntroduction to Programmable Logic ControllersLNG: Basics of Liquefied Natural GasMass Measurement of Hydrocarbon FluidsNatural Gas Measurement—Design/Application/InspectionNatural Gas Measurement—Electronic Flow MeasurementNatural Gas Measurement—FundamentalsNatural Gas Measurement—Sampling and AnalysisPetroleum FundamentalsPetroleum Industry Fundamentals for AccountantsPetroleum Industry Fundamentals for InsurersPipeline TechnologyReciprocating Compressor/Prime Mover OperationsSupervisory Control and Data Acquisition Systems (SCADA)Valves and Actuators (Operation and Maintenance)

PETEX Production Courses All course sections taught by professionals with experience in the field!

Production Technology7.1 CEUs

Length: 9½ days or Subsurface: 5 days (3.8 CEUs) Surface: 4½ days (3.3 CEUs)

1st Week—Subsurfacereservoir FunDAmentAls • Reservoirrock • Overviewofreservoirdrives characteristics • Methodsofdetermining • Reservoirfluids reserves • Fluidflow • ReservoirstimulationnAturAl Drive mechAnisms • Waterdrive • Gas-capexpansiondrive • Dissolvedgasdrive • CombinationdriveArtiFiciAl liFt mechAnisms • Artificialliftmethods • Progressivecavitypumps • Artificialliftselection • Hydraulicjetpumps criteria • Capillaryinjectionstring • Electricsubmersiblepumps • Plungerlift • Suckerrodpumping • GasliftWellheAD eQuiPment • Equipmentoverview • Installation,testing, • Equipmenttypes maintenance • WirelineequipmentenhAnceD recoverY • Wellperformanceand • Chemicalmethods surveillance • Misciblemethods • Secondaryrecovery • Thermalmethods • Waterflood • Tertiary/CO2 recoveryoFFshore ProDuction—sPeciAl consiDerAtions

2nd Week—SurfacesePArAtion • Multi-phasefluids • Separatingliquidsand • Separatinggasandliquids condensate • TestseparatorstreAting liQuiDs • Liquiddehydration • Valvesandcontrols • FreewaterknockouttreAting gAs • Dehydration • Safety • GastreatingmeAsuring liQuiDs AnD gAses • Measuringliquids • GasmeasurementProDuceD WAter mAnAgement AnD DisPosAlleAse AutomAtion AnD emergencY shutDoWn • Typesofequipment • Enddevices • Human/machineinterface • SCADAsystem • Master • TypesofESDsystems • Communications • Maintenanceandsafety • RTU considerations

oil AnD gAs corrosionProDuction oPerAtions PrActices

Recommended ForTechnicians, foremen, production operators, and workoverpersonnel

Need on-site training?These courses can be customizedto meet your company’s needs.

For more information please call 281.443.7144.

Completion and Workover7.1 CEUs

Length: 9½ days or 1st Week: 5 days (3.8 CEUs) 2nd Week: 4½ days (3.3 CEUs)

1st WeekPlAnning the Job • Rotaryvsservicerig • Logistics–scheduling • EquipmentchecklistPiPe recoverY • Freepointbackoff • Jetcutteroperation operations • ChemicalcutteroperationsFishing • Loosejunk • Specializedtools • WirelinefishingWireline oPerAtions • Surfaceequipment • WirelinetoolsWell logging • Open-holelogging • Collarlogs • Fluids • Cementbondlogsselection oF DoWnhole eQuiPment • Packers • Preparationforfuture • Sealassemblies downholework • Landingnipplessolvent AnD chemicAl treAting, scAle AnD PArAFFin

removAl AnD control • Typesofsolvents,acids, • Formationdamage andscaledeposits • Safetyconsideration • ApplicationsandrestrictionssAnD control • Gravelpack • ScreenandlinercomPletion FluiD • Safety&environmental • Fluidlosscontrol considerations material/selection • Fluids • Displacements • Guidelines&issues • Massbalance • BrineeconomicscAsing AnD tubing • Selectionanduseofcasing,tubing,anddrillpipe • Stringdesignconsiderations

2nd WeekPerForAting • Casing • Unbalanced • Downtubing • Jetvsfluid

FrActuring • Purposeoffracturing • Fracturingfluidsselection • Mini-fracturing

PrimArY cementing AnD sQueezing • Muddisplacement • Plugcementing • Bondlogging • Squeezecementing • Cementandadditives • Cementdurability

siDetrAcking • Drilloutbelowcasing • Cutwindowandsidetrack

liners • Applications • Hangingliner • Linerhangers • Disconnectrunningtool • Runninglinerinwell • Cementingliner

coil tubing AnD nitrogen • Application • Safetyconsiderations • Toolsandequipment

PrimArY testing • Pourpoint • Swabtest • Bottomholesamples • Bottompressurebuilduptest

evAluAtion oF tests • Absoluteopenflow • H2S analysis • Gasandoilanalysis • GORdetermination

AcciDent Prevention

Recommended ForTechnicians, foremen, and supervisory-level production operators,workoverpersonnel,anddrillingpersonnel

Completion and Workover, cont.Production Technology, cont.