CORRIBFIELDDEVELOPMENTPROJECT
OnshoreWorksOnshorePipelineTerminationPoint
METHODSTATEMENTRev01
TerminalTieinandSurfaceWaterManagement
withintheCarrowmoreLakeCatchmentArea.
8/14/2019 Terminal Tie
2/6
ShellE&PIrelandLtd. Title: Terminaltiein&SurfaceWaterManagement
Within CarrowmoreLakeCatchment
DraftEnvironmental ManagementPlan DocumentNo: COR14OPSH0000SEPILEMP
MethodStatement Revision:01 Page1of5
SUMMARY
TheworksoutlinedherecovertheexcavationandinstallationoftheonshorepipelinewithintheTerminal
and all associated diversion of services, surfacewatermanagement, concreteworks, gas pipeline and
ancillaryservicesinstallationaswellaspainting,testingandreinstatementworks.
PURPOSE This methodology describes the works associated with tie in of the onshore
pipelineintotheBellanaboyGasTerminalandtheassociateddiversionofsurface
waterintotheLeenamoreCatchment.
LOCATION NorthWesterncorneroftheTerminal.Pipelinechainage91.42to91.72.
TIMESCALE Approximately6Months
TECHNIQUE SitePreparation
A number of existing serviceswithin the Terminal will have to be diverted to
facilitate pipeline installation including; surface water drainage, groundwater
drainage, security fenceandassociated lighting, roaddrainage systemand road
lighting.Thesequenceisasfollows:
At the tiein location, remove gabion baskets, strip topsoil, demolishconcretechannelatthebottomoftheembankmentandstripoffsurface
gravelandweedblanket.
Excavateexistingburiedcablesanddivertsouthofthepigreceiver(pointwhereonshorepipelinetiesintoterminalstructure).
Insertwaterstoppersinboththesurfacewaterandgroundwatersystemsandsetupoverpumpingsystemsouthofthepigreceiver.
Removelightpolesandassociatedcablejunctionboxes.
Fence
off
a
temporary
working
area
inside
the
Terminal
to
facilitate
pipelineactivities.
Dismantle both existing security fences inside the temporary workingarea.
Saw cut bituminous road layers, excavate and remove to a recyclingfacility.
Demolish concrete open channels and remove to a licensed recyclingfacility.
PipelineInstallation
Pipelineinstallation
within
the
Terminal
consists
of
standard
welding
and
pipe
trenching procedures used elsewhere on the onshore pipeline in addition to
anchor block construction, valve pit construction and overground pipe work
painting.Thesequenceisasfollows:
Excavatepipelinetrenchfrompigreceivertotheanchorblocklocation. Excavate anchor block location and prepare surface for steel fixing by
placing blinding layer of concrete. This will also control surface water
withintheanchorblockexcavation.
Install steel reinforcement,erect temporary timber shuttering andpourconcretebase.
Removetimbershutteringandbackfillfoundationbaseuptoundersideof
8/14/2019 Terminal Tie
3/6
ShellE&PIrelandLtd. Title: Terminaltiein&SurfaceWaterManagement
Within CarrowmoreLakeCatchment
DraftEnvironmental ManagementPlan DocumentNo: COR14OPSH0000SEPILEMP
MethodStatement Revision:01 Page2of5
thepipeline.
Whiletheanchorblockisbeingconstructedtheexistingsurfacewaterandgroundwaterdrainagepipeswillberemovedfromthepipelineroute.
The pipeline and associated ancillary services will be strung out andwelded/jointedandpreparedforlaying.
Theremainderofthepipelinetrenchwillthenbeexcavatedandprepared. Thepipelineandancillarieswillthenbelaid,inspectedandbackfilledwith
suitablematerial.
Theremainderofthetrenchwillbebackfilledwiththeoriginalexcavatedmaterial.
The surface water and ground water pipes will be relaid during thepipelinebackfilling.Thesepipelineswillberetestedpriortoallowingthem
returntonormaloperation.
Once thepipelinehasbeenbackfilled,thepipelinesectionsituatedovergroundwillbesandblastedandpaintedforcorrosionprotection.Thismay
requiretheerectionofaweatherproofshelter.
SurfaceWaterManagement
Surfacewater frompipeline constructionworks that liewithin theCarrowmore
Lake catchment (ch 91.42 to 91.72) will be collected, attenuated and taken
through a settlement tank or treatment/filtration unit before being discharged
intotheLeenamoreRivercatchment(northofch91.42).
Theanchor
block
and
pipeline
excavations
will
be
dewatered
by
pumping
surface
watertoadrainrunningparalleltotheexistingstoneroad.Thisdrainwillconvey
surface water to a settlement tank/treatment unit located upstream of the
dischargepointintotheLeenamoreRiver.
Itshouldbenotedthatwatercollected intheTerminaldrainagesystemswillbe
keptseparatefromanywatercollectinginthepipelineexcavations..
Reinstatement
Pipelinereinstatementhastwodistinctoperations;reinstatingtheTerminalinside
thepermanent
security
fencing
(ch.
91.67
91.72),
and
reinstatement
of
the
onshorepipelinetemporaryworkingarea(ch.91.42to91.67).Itshouldbenoted
that reinstatement of ch 91.67 to 91.42 is seasonal and will be incorporated
duringthelandscaping/reinstatementoftheentireTerminaltemporaryfacilities.
Chainage91.6791.72willbereinstatedasfollows:
Construct concrete open channels, reinstate gravel area between roadandpigreceiverandreinstallbituminousroadlayers.
Reinstall inner security fences including reinstatement of weed controlblanketandgravelbetweenthefences.
Reinstatelightpolesandpreviouslydivertedundergroundcables.
8/14/2019 Terminal Tie
4/6
ShellE&PIrelandLtd. Title: Terminaltiein&SurfaceWaterManagement
Within CarrowmoreLakeCatchment
DraftEnvironmental ManagementPlan DocumentNo: COR14OPSH0000SEPILEMP
MethodStatement Revision:01 Page3of5
ReinstategravelinsidetheTerminalandremovetemporaryfencing. Reconstructdrainagechannelatbottomofembankmentbatter. Reinstatetopsoilonbatterandseedasrequired. Reinstallgabionbaskets.
EQUIPMENT Minidigger Roller
FrontTippingDumpers Vibratingcompactor(whackers)
ArticulatedDumptrucks TrackedExcavator(14t46ton)
Roadsaw Concretepump
Consaw Concretepoker
WheeledExcavator Cranes(50100ton)
Sandblaster PaintSprayer
Sidebooms Weldingunits
RESTRICTIONS Surface water from pipeline construction works that lie within theCarrowmoreLakecatchment(ch91.42to91.72)shallbecollected,attenuated
and taken through settlement/treatmentunitsbeforebeingdischarged into
theLeenamoreRiverCatchment(northofch91.42).
Normalconstructionworkisrestrictedtobetween 07:00and19:00weekdaysand07:00and16:00Saturday.
Noiseandvibrationlimits. Lightingconstraints.
8/14/2019 Terminal Tie
5/6
ShellE&PIrelandLtd. Title: Terminaltiein&SurfaceWaterManagement Within
CarrowmoreLakeCatchment
DraftEnvironmental ManagementPlan DocumentNo: COR14OPSH0000SEPILEMP
MethodStatement Revision:01 Page4of5
POTENTIAL
ENVIRONMENTAL
IMPACT
MITIGATION
Noise&LightDisturbance. Noise and vibration will be minimised through design, and appropriateselectionofplantandmachinery. Proactivemaintenanceofplantandequipment. Noise will be reduced by Cladding of stationary machinery such as
generators.
Acousticscreeningandfencingtominimisenoise. Mobileandsitelightingwillbedesignedtolimitlightspillage.
Increaseddustlevels Roads/working areawill be dampened down, as required to ensure dustlevelsduetoconstructionactivitiesarekepttoaminimum.
Sandblastingofpipeworkwillbecarriedoutunderaweatherproofshelter.Constructionactivitiesmayaffectlocalottersandbadgers.
Apreconstructionsurvey forottersandbadgerswillbeundertakenwithin13months
prior
to
construction.
The
areas
to
be
included
are
approximately; 50100m either side of the centre line of the pipeline for
otters,and30meithersideofthecentrelineforbadgers.
Areasofdensevegetationaffectedbythedevelopmentwhichcouldnotbethoroughly searchedwill requiremonitoringbyappropriateexpertsduring
vegetationclearance.
Excavationswillallowottersandbadgersameansofescapeiftheygetintotheexcavation.Thiswillbeachievedbyplacingaccess/egressplanksand/or
soilrampsatnecessarylocations.
Work activitieswill be limited to between the hours of 07:00 and 19:00weekdays
and
07:00
and
16:00
Saturday.
Capswillbeplacedoverallpipeendsatnight. Gapswillbe leftatthebaseofthefencingat75m intervalstoallowotters
and badgers free access and a means of escape across the temporary
workingarea.
Constructionactivitiesmayaffectamphibians
Anyfrogsidentifiedwillbetranslocatedunderlicensetoasuitablelocation. Habitat reinstatementwill recreate the formerchannelanddrainsystems
sothatfrogsmayusethesepostconstruction.
Constructionactivitiesmayaffectnestingbirds
Vegetation clearancewillbeundertakenoutside thebreedingbird seasoni.e.MarchtoAugust,wherefeasible.
Revegetationandplantingofnativescrubspecieswillbecompletedduringreinstatement.
Pollutionofterrestrialandaquatichabitatsduespillageorleaksofoil/dieselfromplantandequipment.
Machineryandplantwillbeinspectedpriortomobilisationtosite. Refuellingofplant/machinerywillonlytakeplaceindesignatedareas. Spillkitswillbeavailableonsite.
8/14/2019 Terminal Tie
6/6
ShellE&PIrelandLtd. Title: Terminaltiein&SurfaceWaterManagement Within
CarrowmoreLakeCatchment
DraftEnvironmental ManagementPlan DocumentNo: COR14OPSH0000SEPILEMP
MethodStatement Revision:01 Page5of5
POTENTIAL
ENVIRONMENTAL
IMPACT
MITIGATION
ReleaseofpipelinedischargewaterstotheCarrowmoreLakeCatchmentcouldhavenegativeimpactondrinkingwaterquality.
All surfacewater from construction activitieswithin theCarrowmore LakeCatchment shallbecollected,attenuated& treatedprior todischarge intotheLeenamoreRiverCatchment.
In drain mitigation will be placed as required to reduce silt impact onassociatedwaterways.
Worksmaydisturbarchaeologicalremains.
Alicensedarchaeologistwillbeonsitetomonitorallexcavations.