    CORRIBFIELDDEVELOPMENTPROJECT

    OnshoreWorksOnshorePipelineTerminationPoint

    METHODSTATEMENTRev01

    TerminalTieinandSurfaceWaterManagement

    withintheCarrowmoreLakeCatchmentArea.

  • 8/14/2019 Terminal Tie

    2/6

    ShellE&PIrelandLtd. Title: Terminaltiein&SurfaceWaterManagement

    Within CarrowmoreLakeCatchment

    DraftEnvironmental ManagementPlan DocumentNo: COR14OPSH0000SEPILEMP

    MethodStatement Revision:01 Page1of5

    SUMMARY

    TheworksoutlinedherecovertheexcavationandinstallationoftheonshorepipelinewithintheTerminal

    and all associated diversion of services, surfacewatermanagement, concreteworks, gas pipeline and

    ancillaryservicesinstallationaswellaspainting,testingandreinstatementworks.

    PURPOSE This methodology describes the works associated with tie in of the onshore

    pipelineintotheBellanaboyGasTerminalandtheassociateddiversionofsurface

    waterintotheLeenamoreCatchment.

    LOCATION NorthWesterncorneroftheTerminal.Pipelinechainage91.42to91.72.

    TIMESCALE Approximately6Months

    TECHNIQUE SitePreparation

    A number of existing serviceswithin the Terminal will have to be diverted to

    facilitate pipeline installation including; surface water drainage, groundwater

    drainage, security fenceandassociated lighting, roaddrainage systemand road

    lighting.Thesequenceisasfollows:

    At the tiein location, remove gabion baskets, strip topsoil, demolishconcretechannelatthebottomoftheembankmentandstripoffsurface

    gravelandweedblanket.

    Excavateexistingburiedcablesanddivertsouthofthepigreceiver(pointwhereonshorepipelinetiesintoterminalstructure).

    Insertwaterstoppersinboththesurfacewaterandgroundwatersystemsandsetupoverpumpingsystemsouthofthepigreceiver.

    Removelightpolesandassociatedcablejunctionboxes.

    Fence

    off

    a

    temporary

    working

    area

    inside

    the

    Terminal

    to

    facilitate

    pipelineactivities.

    Dismantle both existing security fences inside the temporary workingarea.

    Saw cut bituminous road layers, excavate and remove to a recyclingfacility.

    Demolish concrete open channels and remove to a licensed recyclingfacility.

    PipelineInstallation

    Pipelineinstallation

    within

    the

    Terminal

    consists

    of

    standard

    welding

    and

    pipe

    trenching procedures used elsewhere on the onshore pipeline in addition to

    anchor block construction, valve pit construction and overground pipe work

    painting.Thesequenceisasfollows:

    Excavatepipelinetrenchfrompigreceivertotheanchorblocklocation. Excavate anchor block location and prepare surface for steel fixing by

    placing blinding layer of concrete. This will also control surface water

    withintheanchorblockexcavation.

    Install steel reinforcement,erect temporary timber shuttering andpourconcretebase.

    Removetimbershutteringandbackfillfoundationbaseuptoundersideof

  • 8/14/2019 Terminal Tie

    3/6

    ShellE&PIrelandLtd. Title: Terminaltiein&SurfaceWaterManagement

    Within CarrowmoreLakeCatchment

    DraftEnvironmental ManagementPlan DocumentNo: COR14OPSH0000SEPILEMP

    MethodStatement Revision:01 Page2of5

    thepipeline.

    Whiletheanchorblockisbeingconstructedtheexistingsurfacewaterandgroundwaterdrainagepipeswillberemovedfromthepipelineroute.

    The pipeline and associated ancillary services will be strung out andwelded/jointedandpreparedforlaying.

    Theremainderofthepipelinetrenchwillthenbeexcavatedandprepared. Thepipelineandancillarieswillthenbelaid,inspectedandbackfilledwith

    suitablematerial.

    Theremainderofthetrenchwillbebackfilledwiththeoriginalexcavatedmaterial.

    The surface water and ground water pipes will be relaid during thepipelinebackfilling.Thesepipelineswillberetestedpriortoallowingthem

    returntonormaloperation.

    Once thepipelinehasbeenbackfilled,thepipelinesectionsituatedovergroundwillbesandblastedandpaintedforcorrosionprotection.Thismay

    requiretheerectionofaweatherproofshelter.

    SurfaceWaterManagement

    Surfacewater frompipeline constructionworks that liewithin theCarrowmore

    Lake catchment (ch 91.42 to 91.72) will be collected, attenuated and taken

    through a settlement tank or treatment/filtration unit before being discharged

    intotheLeenamoreRivercatchment(northofch91.42).

    Theanchor

    block

    and

    pipeline

    excavations

    will

    be

    dewatered

    by

    pumping

    surface

    watertoadrainrunningparalleltotheexistingstoneroad.Thisdrainwillconvey

    surface water to a settlement tank/treatment unit located upstream of the

    dischargepointintotheLeenamoreRiver.

    Itshouldbenotedthatwatercollected intheTerminaldrainagesystemswillbe

    keptseparatefromanywatercollectinginthepipelineexcavations..

    Reinstatement

    Pipelinereinstatementhastwodistinctoperations;reinstatingtheTerminalinside

    thepermanent

    security

    fencing

    (ch.

    91.67

    91.72),

    and

    reinstatement

    of

    the

    onshorepipelinetemporaryworkingarea(ch.91.42to91.67).Itshouldbenoted

    that reinstatement of ch 91.67 to 91.42 is seasonal and will be incorporated

    duringthelandscaping/reinstatementoftheentireTerminaltemporaryfacilities.

    Chainage91.6791.72willbereinstatedasfollows:

    Construct concrete open channels, reinstate gravel area between roadandpigreceiverandreinstallbituminousroadlayers.

    Reinstall inner security fences including reinstatement of weed controlblanketandgravelbetweenthefences.

    Reinstatelightpolesandpreviouslydivertedundergroundcables.

  • 8/14/2019 Terminal Tie

    4/6

    ShellE&PIrelandLtd. Title: Terminaltiein&SurfaceWaterManagement

    Within CarrowmoreLakeCatchment

    DraftEnvironmental ManagementPlan DocumentNo: COR14OPSH0000SEPILEMP

    MethodStatement Revision:01 Page3of5

    ReinstategravelinsidetheTerminalandremovetemporaryfencing. Reconstructdrainagechannelatbottomofembankmentbatter. Reinstatetopsoilonbatterandseedasrequired. Reinstallgabionbaskets.

    EQUIPMENT Minidigger Roller

    FrontTippingDumpers Vibratingcompactor(whackers)

    ArticulatedDumptrucks TrackedExcavator(14t46ton)

    Roadsaw Concretepump

    Consaw Concretepoker

    WheeledExcavator Cranes(50100ton)

    Sandblaster PaintSprayer

    Sidebooms Weldingunits

    RESTRICTIONS Surface water from pipeline construction works that lie within theCarrowmoreLakecatchment(ch91.42to91.72)shallbecollected,attenuated

    and taken through settlement/treatmentunitsbeforebeingdischarged into

    theLeenamoreRiverCatchment(northofch91.42).

    Normalconstructionworkisrestrictedtobetween 07:00and19:00weekdaysand07:00and16:00Saturday.

    Noiseandvibrationlimits. Lightingconstraints.

  • 8/14/2019 Terminal Tie

    5/6

    ShellE&PIrelandLtd. Title: Terminaltiein&SurfaceWaterManagement Within

    CarrowmoreLakeCatchment

    DraftEnvironmental ManagementPlan DocumentNo: COR14OPSH0000SEPILEMP

    MethodStatement Revision:01 Page4of5

    POTENTIAL

    ENVIRONMENTAL

    IMPACT

    MITIGATION

    Noise&LightDisturbance. Noise and vibration will be minimised through design, and appropriateselectionofplantandmachinery. Proactivemaintenanceofplantandequipment. Noise will be reduced by Cladding of stationary machinery such as

    generators.

    Acousticscreeningandfencingtominimisenoise. Mobileandsitelightingwillbedesignedtolimitlightspillage.

    Increaseddustlevels Roads/working areawill be dampened down, as required to ensure dustlevelsduetoconstructionactivitiesarekepttoaminimum.

    Sandblastingofpipeworkwillbecarriedoutunderaweatherproofshelter.Constructionactivitiesmayaffectlocalottersandbadgers.

    Apreconstructionsurvey forottersandbadgerswillbeundertakenwithin13months

    prior

    to

    construction.

    The

    areas

    to

    be

    included

    are

    approximately; 50100m either side of the centre line of the pipeline for

    otters,and30meithersideofthecentrelineforbadgers.

    Areasofdensevegetationaffectedbythedevelopmentwhichcouldnotbethoroughly searchedwill requiremonitoringbyappropriateexpertsduring

    vegetationclearance.

    Excavationswillallowottersandbadgersameansofescapeiftheygetintotheexcavation.Thiswillbeachievedbyplacingaccess/egressplanksand/or

    soilrampsatnecessarylocations.

    Work activitieswill be limited to between the hours of 07:00 and 19:00weekdays

    and

    07:00

    and

    16:00

    Saturday.

    Capswillbeplacedoverallpipeendsatnight. Gapswillbe leftatthebaseofthefencingat75m intervalstoallowotters

    and badgers free access and a means of escape across the temporary

    workingarea.

    Constructionactivitiesmayaffectamphibians

    Anyfrogsidentifiedwillbetranslocatedunderlicensetoasuitablelocation. Habitat reinstatementwill recreate the formerchannelanddrainsystems

    sothatfrogsmayusethesepostconstruction.

    Constructionactivitiesmayaffectnestingbirds

    Vegetation clearancewillbeundertakenoutside thebreedingbird seasoni.e.MarchtoAugust,wherefeasible.

    Revegetationandplantingofnativescrubspecieswillbecompletedduringreinstatement.

    Pollutionofterrestrialandaquatichabitatsduespillageorleaksofoil/dieselfromplantandequipment.

    Machineryandplantwillbeinspectedpriortomobilisationtosite. Refuellingofplant/machinerywillonlytakeplaceindesignatedareas. Spillkitswillbeavailableonsite.

  • 8/14/2019 Terminal Tie

    6/6

    ShellE&PIrelandLtd. Title: Terminaltiein&SurfaceWaterManagement Within

    CarrowmoreLakeCatchment

    DraftEnvironmental ManagementPlan DocumentNo: COR14OPSH0000SEPILEMP

    MethodStatement Revision:01 Page5of5

    POTENTIAL

    ENVIRONMENTAL

    IMPACT

    MITIGATION

    ReleaseofpipelinedischargewaterstotheCarrowmoreLakeCatchmentcouldhavenegativeimpactondrinkingwaterquality.

    All surfacewater from construction activitieswithin theCarrowmore LakeCatchment shallbecollected,attenuated& treatedprior todischarge intotheLeenamoreRiverCatchment.

    In drain mitigation will be placed as required to reduce silt impact onassociatedwaterways.

    Worksmaydisturbarchaeologicalremains.

    Alicensedarchaeologistwillbeonsitetomonitorallexcavations.