  • Taipei Neihu LineTaiwan

    Taipei Neihu Line

    The operationalmetro network

    Lines : 6Stations : 64Traffic : about 1 M

    passengers per day

    The Taipei urban areaPopulation : 5 M inh.

    The CityPopulation: almost 3 M inh.Surface area: 272 sq. km

    Capital of Taiwan with more than 5 millioninhabitants for the metropolitan area, TaipeiCity started planning its metro network in the1970s, the construction in 1980s and pro-gressively the revenue services in 1990s.Nowadays, the 1st stage network is totallycompleted and put into revenue service. Thisfirst metro network of 69 km includes 6 linesand 64 stations, with a daily passenger flowof about 1 million.

    A 2nd stage network has been approved bythe Central Government and is now underconstruction. Including 7 lines and 57 sta-tions, the second stage will add up 70 km rail-

    ways. To this network will be integrated therail link between CKS International Airportand Taipei, and the Taipei Circle Line.

    In 1996, the first line of the Taipei metro network to be put into commercial operationis the Mucha Line (Brown Line), an elevatedMedium Capacity Transit system (VAL). As partof the 2nd stage network, the Neihu Line is anextension of the Mucha Line.The Neihu Line starts north from the existingelevated terminal station BR2. The line thengoes down into tunnel to the Sungshandomestic airport with BR1 station, it turnsnorth under the airport and Keelung Riverand re-emerges after B1 station. The NeihuLine continues east by viaducts crossing NeihuDistrict to reach the terminal and depot in Nankang. There a connection is made toNankang Line.The system definition, as well as the design ofthe civil works, track and depot have been carried out between 1999 and 2002. The cons-truction has started in 2003. The revenue service is scheduled to begin in June 2008.

    StationsThe Neihu Line includes 12 stations, of which2 are underground and 10 elevated. Added tothis is a maintenance depot.

    InfrastructureThe total length of Neihu Line is about 15 km,including 4 km under tunnel and 11 km onviaduct.

    The Neihu Line

    Background

    BR2BR1

    B1 B3B4

    B5

    B6 B7

    B8

    B9

    B10B11

    B2Neihu Line

    Mucha Line

    5, a v e n u e d u C o q75009 Paris FRANCETel : +33 (0)1 40 16 61 00Fax : +33 (0)1 40 16 61 04systra@systra.com

    Dec. 2005

  • Facts and figures Length: 15 km (4km tunnels, 11 km viaducts)Number of stations: 12 (2 underground and 10 elevated)Number of depot: 1System type: rubber tired AGT driverless

    The metro network, 2nd Phase (under construction):7 lines, 70 km, 57 stations

    Organisations involved Owner: Department of Rapid Transit Systems(DORTS) Operator: Taipei Rapid Transit Corp. (TRTC) Contractors: KSECO/Bombardier Transporta-tion, Continental, Pan Asia Detail Designers: CECI, RESI, MAA Special Design Consultant: SYSTRA

    Cost Global: about 1 170 M USD

    Financing Central Government : 75%Municipality : 25%

    Key DatesJuly 1999: starting of the Detail DesignAugust 1999: contract of assistance system (forthe lot 144 with CECI)June 2001: contract for the U Shape viaductand assistance system for the lot 145 (with CECI).contract of assistance to the depot design (withRESI)January 2003: contract for the rubber tiredAGT driverless basic design (with CECI and RESI)May 2003: starting of the turnkey constructioncontract for U Shape viaduct and systemsJune 2008: scheduled revenue service startingdate

    TaiwanTaipei Neihu Line

    The Project

    One of the key issues of this project is to mini-mize the mass of the structures, for a betterinsertion of the line in the dense urban areaand to reduce the environmental impacts.

    For the first time in Taiwan, the Departmentof Rapid Transit Systems (DORTS) have adop-ted the U Shape viaduct. This design wasdeveloped and proposed by SYSTRA as anoptimised solution to elevated metro systems.

    SuperstructureThe tracks consist of steel running surface.Neihu Line will be fully compatible with theexisting VAL system of Mucha Line, using rubber tired driverless AGT technology with aminimum headways of 72 seconds.

    SYSTRA has already been deeply involved inthe Mucha Line at the beginning of 1990s. Atthe time, SYSTRA carried out the coordinationbetween E&M systems and civil works andensured the training of operation and main-tenance staff of the line.

    Within the frame of Neihu Line, SYSTRA hastaken the role of Special Design Consultantfor the local designers, which are: China Engi-neering Consultants Inc. (CECI), ResourcesEngineering Services Inc. (RESI), Moh andAssociates (MAA), of the Department of RapidTransit System (DORTS) of Taipei MunicipalGovernment. SYSTRA performed the follo-wing services:

    SYSTRAs Role

    System-wide assistance, including:- definition of the system-wide require-

    ments and interfaces between systems andcivil works,

    - power supply simulation of the wholeline,

    - noise & vibration studies and recommen-dations to mitigation solutions.

    Viaduct designCompared to the traditional box girder via-duct, the U Shape viaduct is an optimisedsolution to elevated metro systems, whichallows reducing significantly the visual impactto urban environment, as well as the cost-duration ratio.

    To improve the construction quality andspeed, the typical U shape spans as well asthe pier caps are fully pre-cast.

    Within this project, SYSTRA has performed:- basic and detail design of the typical sec-

    tions of U Shape viaducts,- architectural design of the typical U

    shape structures (superstructures and sub-structures),

    - design assistance for special bridges,- detail design review.

    Running surface design, including:- functional specifications,- basic Design.

    Depot design- general layout and basic design,- detail design review.