Project: UMB Main Section: RKM: 197
CRS Targeted Section: Khurja- Merrutcity RKM: 84
Gr.No. 107 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Khurja Jn. (KRJ)
2 Khurja City (KJY) SP 100% 0.6
3 Maman (MOM)
4Bulandshahr
(BSC)SSP 100% 0.9
5 Baral (BARL)
6 Gulaothi (GLH) TSS 100% 1.0
7 Hafizpur (MZR) SP 100% 1.6
8 Hapur Jn. (HPU) TSS 100% 2.0
9 Kharkhauda (KXK) SSP 100% 4.8
10Meerut City Jn.
(MTC)SP 100% 10.0
Status of Telecom Works for Railway Electrification targetted in 2014-15
Khurja-Merrut City-Saharanpur
Comp.
TELECOM PDC-Apr'14
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
Wo
rk C
om
ple
ted
.
OF
C b
low
ing
wo
rk c
om
ple
ted
by R
E/U
MB
Agency :-
Outdoor- M/s Poorvanchal,Jaunpur
Anand-09919065561
LOA-08.12.08,DOC-31.10.13
Indoor- M/s Artek,NDLS
Satnarayan-09310629372
LOA-09.06.11,DOC-31.01.13
Provided
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
Exis
ting
Not
Req.Provided
25
KV
cle
ara
nce
re
ce
ived
.
All indoor &
outdoor work
completed.
OFC handed
over to RCIL on
02.05.14
Project: UMB RKM: 160
RKM: 92
RKM: 160
Gr.No. 107 & 107A As on 30.05.2014
OFC 6 QuadTotal
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Ghaziabad (GZB)
2Naya Ghaziabad
Jn.(GZN)
3 Guldhar (GUH) SP Comp 0.6 Comp.
5 Muradnagar (MUD) TSS Comp 1.35 Comp
6 Modinagar (MDNR)
7Muhiuddin Pur
(MUZ)SSP Comp 0.75 Comp
8 Partapur (PRTP)
9Meerut City Jn.
(MTC)
Exis
ting
Exis
ting
Exis
ting
Not
Req.Provided Provided
25
KV
cle
ara
nce
ava
ilab
le.
All indoor work
completed.
Status of Telecom Works for Railway Electrification targetted in 2014-15
2.2 to 25 KV Targeted Section: Sakhoti Tanda - Saharanpur
CRS Targeted Section:GZB-MTC-SRE
REPC Remark/ Status
Agency :-M/s Anand Enterprises, Jaunpur
LOA-11.03.14, DOC- 10.6.14
TELECOM PDC-Oct'14
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
GZB-Merrut City-Saharanpur
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
Main Section:
OFC 6 QuadTotal
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
REPC Remark/ StatusSl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
10Meerut Cantt.
(MUT)SP 90% 4.2 0.0
11 Pabli Khas (POY)
12 Daurala (DRLA) SSP 90% 0.8 0.0
13Sakhoti Tanda
(SKF)
14 Khatauli (KAT) SSP 90% 0.2 0.0
15 Mansurpur (MSP)
16Jarauda Nara
(JDW)TSS 0% 0.5
17Muzaffar Nagar
(MOZ)
18Baman Heri
(BMHR)SP 90% 3.5 0
19Rohana Kalan
(RNA)
20 Deoband (DBD) SSP Comp 1.86 1.86
21Talheri Buzurg
(THA)
22 Nagal (NGL) SSP Comp 0.69 0.69
23 Tapari Jn. (TPZ) TSS Comp 1 0
24Saharanpur Jn.
(SRE)
Exis
ting
Exis
ting
Exis
ting
Not
Req.
Not
Provided
Not
Provided
25
KV
cle
ara
nce
ava
ilab
le.
Control
Tapping work
in progress.
MTWE
installation
done at
MTC,MUT,
KAT
Project: UMB RKM: 159
25 KV Targeted Section: Bajalata- Ramnagar Gr.No. 143 C RKM: 21
RKM: 53
Gr.No. 143 B&C RKM: 153
Gr.No. 143 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Chakki Bank
(CHKB)2 Pathankot (PTK)
3 Bharoli (BHRL) SSP 100% 1.0 1.0
4 Sujanpur (SJNP) TSS 95% 1.6 1.6
5Madhopur
Punjab (MDPB)6 Kathua (KTHU) SSP 100% 0.7 0.7
7 Buddhi (BDHY)
8 Chhanaroria
(CHNR)SP 100% 3.2 3.2
9 Chakdayala
(CKDL)
10Hira Nagar
(HRNR)SSP 100% 2.1 2.1
11 Ghagwal (GHWL)
12 Sambha (SMBX) TSS 100% 1.0 1.0
Gr.No. 143 C
Status of Telecom Works for Railway Electrification targetted in 2014-15
TELECOM
Addnl
MUX
By RE
Status of TPC
phone
Stations REPC
MainSP/SSP/
TSS Bldg
Location
Remark/ Status
2.2 to 25 KV Targeted Section: Jammu Tawi-Udhampur
Chakki Bank-Pathankot-Jammu Tawi-Udhampur
CRS Targeted Section: Pathankot-Jammu Tawi-Udhampur
Sl.
No
SP/SSP/
TSS Bldg
status
C/H
Bldg.
-
Exis
tin
g
Exis
tin
g
Exis
tin
g
Not
Req
Main Section:
Trenching work
completed in full
section.
Cable laying completed.
(17.29/17.29 Km)
Equipment earthing in
progress.
PDC- Sep'14
M/s C.K.Traders,JAT,
R.K.Gupta-9419197630
LOA-28.12.12,DOC-31.03.14
Agency :-
Cable laying for
SP/SSP/TSS
25 K
V D
yn
am
ic C
leara
nce
re
ceiv
ed.
Provided Provided
Provided CRS obtainedComp
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Addnl
MUX
By RE
Status of TPC
phone
Stations REPC
MainSP/SSP/
TSS Bldg
Location
Remark/ Status Sl.
No
SP/SSP/
TSS Bldg
status
C/H
Bldg.
Cable laying for
SP/SSP/TSS
13Vijaypur Jammu
(VJPJ)SSP 100% 1.1 1.1
14Baribrahmana
(BBMN)
15 Jammutawi (JAT) SSP 80% 3.0 3.0
16 Bajalta (BLA) SP 0% 1.0 1.0
17 Sangar (SGR) SSP 0% 1.0 1.0
18 Manwal (MNVL) TSS 0% 0.7 0.7
19Ram Nagar Rd
(RNJK)SSP 0% 1.0 1.0
20 Udhampur (UHP)
Provided
Provided
Exis
tin
g
Exis
tin
g
Exis
tin
g
Not
Req
Provided
Not
Provided
Trenching work
completed in full
section.
Cable laying completed.
(17.29/17.29 Km)
Equipment earthing in
progress.
25 K
V D
yn
am
ic C
leara
nce
re
ceiv
ed.
Project: UMB RKM: 140
RKM: 33
RKM: 81
RKM: 0
Gr.No. 159 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Ghaziabad (GZB)
2 Mahrauli (MFH) SP 0% 1.4 1.4
3Adhyatmik Nagar
Halt
4 Dasna (DS)
5 Pilkhuwa (PKW) SSP 0% 1.2 1.2
6 Hapur (HPU) TSS 0%
7 Babugarh (BBG)
8 Kuchesar (QXR)
9 Simbhaoli (SMBL) SSP 0% 0.9
10Garhmukteshwar
(GGB)7.8 7.8
11 Kankather (KHE) SP 0% 2.3
12 Gajraula (GJL)
Status of Telecom Works for Railway Electrification targetted in 2014-15
Ghaziabad(Ex.)-Moradabad(Ex.)
2.2 to 25 KV Targeted Section: GZB-Garhmukteshwar & Moradabad-Hakeempur
CRS Targeted Section: NIL
25 KV Targeted Section: Garhmukteshwar-Amroha
REPCRemark/
Status
Sl.
No
Addnl
MUX
By RE
2.2
KV
an
ti t
he
ft c
lea
ran
ce
rece
ived
.
Not
Provided
Not
Provided
StationsC/H
Bldg.
MainSP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Main Section:
TELECOMStatus of TPC
phone
Trenching work
stated.
Cable laying in
progress.
(10.4/18 Km)
Cable laying at
Garhmukteshwar
Bridge
completed.
PDC-Sep'14
M/s Micromap,LKO
LOA-28.12.12,DOC-27.11.14
A.K.Gupta-941517401Agency :-
Exis
ting
Exis
ting
Exis
ting
To be
provided
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
REPCRemark/
Status
Sl.
No
Addnl
MUX
By RE
StationsC/H
Bldg.
MainSP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
13 Maheshra (MHHR) SSP 0% 0.8
14 Kafurpur (KFPR) TSS 0% 1.3
15 Amroha (AMRO)
16 Kailsa (KIV)
17 Chakkalilati Halt SSP 0% 0.9
18 Hakeempur (HKP)
19Lodhipur Bishanpur
(LPB)SP 0% 1.5
20 Moradabad (MB)
Not
Provided
2.2
KV
an
ti t
he
ft c
lea
ran
ce
rece
ived
.
Not
Provided
Trenching work
started.
SP/SSP/TSS
building
construction not
started.
Exis
ting
Exis
ting
Exis
ting
To be
provided
Project: UMB RKM: 25
Gr.No. 179 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Udhampur (UHP)
2 Chakarawaha SP (2 Nos) 0% 11
3 Katra SSP 0% 0.5
Not
Provided
Not
Provided
Not
Provided
Wo
rk in
pro
gre
ss
by N
R.
Status of Telecom Works for Railway Electrification targetted in 2014-15
Udhampur-Katra
25 KV Targeted Section: Udhampur-Katra
Sl.
NoStations
C/H
Bldg.
TELECOMStatus of TPC
phone
REPCRemark/
Status
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
PDC-Sep'14
Tender to be floatedAgency :-
Main Section:
Schedule for
approval is
under process
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Project: UMB RKM: 252
RKM:
As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Rohtak (ROK) (Excl)
2 Samar Gopalpur
(SMF)3 Karainthi (KHV)
4 Kila Zafargarh (KZH)
5 Julana (JJO)
6 Jai Jai Wanti (JJI)
7 Kinana (KIU)
8Bishnupura Haryana
((BSPH)
9 jind (JHI)
10 Barsola (BZO)
11 Uchana (UCA)
12 Ghaso (GSO)
Status of Telecom Works for Railway Electrification targetted in 2014-15
Main Section: Rohtak (ex.)-Bhatinda- Lehra Muhabbat
25 KV Targeted Section:
SP/SSP/
TSS Bldg
Location
Agency :
TELECOM Gr.No. 160
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPC
Exis
ting
Exis
ting
Exis
ting
To be
provided
Remark/
Status
To be
provided
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
SP/SSP/
TSS Bldg
Location
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
13 Narwana Jn (NRW)
14 Dharodi (DHY)
15Dhamtan Sahib
(DTN)
16 Tohana (TUN)
17 Himmatpura (HMQ)
18 Jakhal Jn (JHL)
19 Kahangarh (KGH)
20 Bareta ((BRZ)
21 Datewas(DTW)
22 Budhlada (BLZ)
23Narender Pura
(NPX)
24 Mansa (MSZ)
25Sadda Singhwala
(SSZ)
27 Maru (MAUR)
28Maisar Khana
(MASK)
29 Kot Fateh (KTF)
30Kattar Singh Wala
(KZW)
31 Bhatinda (BTI)
32Bhatinda Cantt
(BTIC)
33 Bhuchchu (BCU)
34 Lehra Muhabbat
To be
provided
Exis
ting
Exis
ting
Exis
ting
To be
provided
Project: JP RKM:
RKM:
As on 30.05.2014
OFC4
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1Delhi Sarai
Rohilla
2 Patel Nagar
3 Delhi Cannt
4 Palam
5 Bijwasan
6 Gurgaon
7 Garhi Hansaru
8 Palli
9Jataula Jauri
Sampka
10 Pataudi Road
11 Inchhapuri
12 Khaililpur
Status of Telecom Works for Railway Electrification targetted in 2014-15
Main Section: Delhi Sarai Rohila-Rewari-Jaipur-Ahmedabad
25 KV Targeted Section:
SP/SSP/
TSS Bldg
Location
Agency :
TELECOM Gr.No. 182
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
Exis
ting
Exis
ting
6 Q
ua
d t
o b
e la
id
To be
provided
To be
provided
To be
provided
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
Project: BBS RKM: 138
RKM: 37
RKM: 63
RKM: 0
As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Vizianagram (VZM)
2 Gotlam (GTLM) SP 60%
3 Garudaballi (GRBL)
4Gajapati Nagaram
(GPI)TSS 0%
5 Komatipalli (KMX) SSP 50%
6Donkinavalasa
(DNV)
7 Bobbili (VBL) SP 20%
8 Sitanagaram (SNM) TSS 80%
9 Narasipuram
10Paravatipuram
(PVP)SSP 70%
11 Paravatipuram TownYet to
start
12 Gumada (GMDA) SSP 0%
Exis
ting
Exis
ting To be
provide
d
To be
provided
Exis
ting
Remark/
Status
Agency : M/s Puncom
LOA-30.01.13,DOC-30.06.14
To be
provided
2.2
KV
cle
ara
nce
rece
ived
.
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCSl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
PDC-Dec'14 Gr.No. 166
Status of Telecom Works for Railway Electrification targetted in 2014-15
Main Section: Vizianagaram (Excl.) -Singapur Road (Incl.)
25 KV Targeted Section: Kuneru - Singapur Road
2.2 to 25 KV Targeted Section: Vizianagaram - Sitaramnagaram
CRS Targeted Section: NIL
TELECOM
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Remark/
Status
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCSl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
13 Kuneru SP 0%
14 Jimidipeta
15 Ladda
16 RayagadahYet to
startTSS 30%
17Singapur Road
(SPRD)
1.SP/SSP/TSS Building U/P.
2.Cable route plan approved but agency not yet started work.
3.OFC System Existing. But as demanded by SrDSTE/WAT, variation under process for supply & installation of STM equipt at all stations.
4.Cable laying & Outdoor work to be completed within 1 Month of completion of building.
5. Indoor OFC system to be commissioned within 3 Months after sanction of variation.
Exis
ting
Exis
ting To be
provide
d
To be
provided
Exis
ting
Work Yet to
Start
To be
provided
2.2
KV
cle
ara
nce
rece
ived
.
Project: BBS RKM: 124
RKM: 107
PDC-Mar'15 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)
At
Stns.
At
SP/SSP
/ TSS
1Singapur Road
(SPRD)
2 Theruvali (THV) SP 0%
3BissamCuttack
(BMCK)TSS 60%
4 Sansartali
5 Muniguda (MNGD) SSP 0%
6 Doikallu (DKLU) SP 0%
7 Ambodala (AMB) SSP 0%
8Langigarh Road
(LJR)TSS 0%
9Norla Road
(NRLR)SSP 0%
10Rupra Road
(RPRD)SP 0%
11Kandel Road
(KDLR)SSP 0%
12 Kesinga (KSNG TSS 0%
13 Titlagarh (TIG)Work
Started
Exis
ting
Exis
ting
Not
Provided
Not
ProvidedExis
ting
Remark/ Status
Agency : M/s Benzfab,BBS
LOA-27.12.12,DOC-30.06.14
Not
Provided
Su
rve
y C
harg
es P
aym
en
t m
ade
.
Materials supplied
on 27.05.2013.
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCSl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
Gr.No. 167
Status of Telecom Works for Railway Electrification targetted in 2014-15
Singapur Road (Excl)- Titlagarah (Incl)
25 KV Targeted Section: Theruvali - Titlagarh
Main Section:
TELECOM
1.SP/SSP/TSS Building U/P.
2.Cable route plan under approval.
3.OFC System Existing. But as demanded by SrDSTE/SBP, variation under process for supply & installation of STM equipt at all stations.
4.Cable laying & Outdoor work to be completed within 1 Month of completion of building.
5. Indoor OFC system to be commissioned within 3 Months after sanction of variation.
Project: BBS RKM: 66
RKM:
Gr.No. 172 As on 30.05.2014
OFC6
QuadTotal Comp. At Stns.
At
SP/SSP/
TSS
1 Pakur (PKR) TSS
2 Tilbihita (TBB)
3 Kotalpukur (KLP) SSP
4 Gumani (GMAN)
5 Barharwa (BHW)
6 Bonidanga (BDAG)
7 Bindubas SP
8 Tildanga (TLDE)
9 New Farakka (NFK) SSP
10 Chamagram (CMX)
11 Khaltipur (KTJ) TSS
12 Jamir Ghat (JMQ)
13 Gour Malda (GZM SSP
14 Malda Town (MLDT)
Exis
tin
g
Exis
tin
g
Exis
tin
g
Not
Provided
Not
Provided
Not
Provided
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
Status of Telecom Works for Railway Electrification targetted in 2014-15
Pakur-Malda Town
TELECOM
Sl.
NoStations
C/H
Bldg.
Main
Addnl
MUX
SP/SSP/
TSS Bldg
Location
25 KV Targeted Section:
Agency : Tender to be floated
Main Section:
Project: KKK RKM: 152
25 KV Targeted Section: NIL RKM: 0
RKM: 123
RKM: 152
Gr.No. 162A PDC-Nov'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Khana (KAN)
2Jhapatpur Dhal
(JDL)SP 0% 0.7
3 Bonpas (BPS)
4Noadar Dhal
(NRX)SSP 0% 1.2
5 Guskara (GKH)
6Pichkurir Dhal
(PCQ)SSP 0% 0.7
7 Bhedia (BDH)
8 Bolpur (BHP)
9 Prantik (PNE) TSS 90% 0.8
Provided ProvidedNot
Provided
Exis
ting
Exis
ting
Exis
ting
25
KV
Dya
na
mic
cle
ara
nce
rece
ived
1.MUX
installed at all
stations.
2.SP/SSP/
TSS building
not ready.
3. Cable laying
for
SP/SSP/TSS
to be started.
TELECOM
Sl.
NoStations
C/H
Bldg.
Main
Addnl
MUX
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
Outdoor- M/s Shivani Entp
Nikhil Ghosh-09002978939
LOA-06.09.11,DOC-31.07.14
Indoor- M/s Puncom
Rajesh Soni-09815651646
LOA-02.06.11,DOC-01.07.14
Agency :-
Status of Telecom Works for Railway Electrification targetted in 2014-15
Khana (Excl.)-Saintha-Pakur (Incl)
2.2 to 25 KV Targeted Section: Rampurhat-Pakur & Khana - Sainthia
CRS Targeted Section: Rampurhat-Pakur & Khana - Sainthia & Sainthia-Rampurhat
Main Section:
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Sl.
NoStations
C/H
Bldg.
Main
Addnl
MUX
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
10 Kopai (KPLE) SSP 90% 0.5 0.5
11 Ahmadpur (AMP) SSP 0% 1.6 1.6
12 Bataspur (BSLE)
13 Sainthia (SNT) SP 90% 1.5 1.5
14Gadadharpur
(GHLE)
15 Mollarpur (MLV) SSP 90% 1.0 Comp
16Tarapitha Road
(TPF)
17Rampur Hat
(RPH)TSS 98% 1.5 Comp
18Swadhinpur
(SDLE)
19 Nalhati (NHT) SSP 90% 1.0 Comp
20 Chatra (CTR)
21 Murarai (MRR) SP 90% 0.5 Comp
22Bansalai Bridge
(BSBR)
23 Rajgram (RJG) SSP 90% 0.5 Comp
24 NagarNabi (NGF)
25 Pakur (PKR) TSS 95% 3
ProvidedNot
Provided
Provided
Not
Provided
Exis
ting
Exis
ting
Exis
ting
25
KV
Dya
na
mic
cle
ara
nce
rece
ived
1.MUX
installed at all
stations.
2.SP/SSP/
TSS building
not ready.
3. Cable laying
for
SP/SSP/TSS
completed at
RPH,NHT,MR
R,RJG.
Termination
not done.
Project: KKK Main Section: RKM: 53
RKM: 0
RKM: 30
Gr.No. 162B PDC- Jun'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1Pandebeshwar
(PAW)TSS 100% 1 Comp Provided
2 Bhimgara (BMGA)
3 Panchra (PCR)
4 Dubrajpur (DUJ) SSP 100% 0.4 Comp
5 Chinpai (CPLE)
6 Kachujor (KOX) SSP 100% 4.0 Comp
7 Jibdharpur (JDQ)
8 Suri (SURI) SP 100% 0.7 Comp
9 Kunuri (KNRI)
10Mahishadahari
(MWZ)
11 Kherua (KVF)
12 Sainthia (SNT) SP 90% 1.0 1.0Not
Provided
All work
completed
except at
Sainthia
where SP
building is not
ready.
However
cable laying
at SNT is
complete.25
KV
cle
ara
nce
ob
tain
ed
ProvidedExis
ting
Exis
ting
Exis
ting
Provided
Provided
Agency :-
M/s Shivani Entp
Nikhil Ghosh-09002978939
LOA-06.09.11,DOC-31.07.14
Indoor- M/s Puncom
Rajesh Soni-09815651646
LOA-02.06.11,DOC-01.07.14
Status of Telecom Works for Railway Electrification targetted in 2014-15
Pandebeshwar (Excl) -Sainthia (Excl)
2.2 to 25 KV Targeted Section: NIL
CRS Targeted Section:Kachujor-Sainthia
Remark/
Status
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPC
Project: BBS Main Section: RKM: 124
25 KV Targeted Section: Jharsuaguda - Sambalpur RKM: 45
Gr.No. 170A PDC- Jun'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1Jharsuaguda Jn.
(JSG)
2Jharsuaguda Rd.
Jn. (JSGR)
3 Brundamal (BXQ)
4 Lopanga (LPG)
5 Rengali (RGL)
6 Sasan (SSN)
7 Sarala Jn. (SLR)
8Sambalpur Rd
Halt
9 Sambalpur (SBP)
10 Hirakud (HKG)
11 Godbhaga
(GBHQ)12 Attabitra (ATS)
13Bargarh Rd.
(BRGA)
14 Bappali (BRPL)
15 Dungripali (DJX)
Agency :-
Status of Telecom Works for Railway Electrification targetted in 2014-15
Jharsuaguda - Dungripali
Remark/ Status
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCE
xis
ting
Exis
ting
Exis
ting
To be
provided
by RE
Not
Provided
Not
Provided
Project: BBS Main Section: RKM: 238
25 KV Targeted Section: NIL RKM: 0
Gr.No. 170B PDC- As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Dungripali (DJX)
2 Khaliapali (KHPL)
3 Loisinga (LSX)
4Balangir Rd P.H.
(BNDR)
5 Balangir (BLGR)
6Deogaon Rd
(DFR)
7 Saintala (SFC)
8 Badmal (BUDM)
9 Sikir (SFK)
10Titalagarh Jn.
(TIG)
Agency :-
Status of Telecom Works for Railway Electrification targetted in 2014-15
Dungripali (Excl)-Titlagarh (Excl)
Remark/
Status
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPC
Exis
ting
Exis
ting
Exis
ting
To be
provided
by RE
Not
Provided
Not
Provided
Project: KKK RKM: 57
RKM: 57
Gr.No. 168 PDC-Dec'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Andal (UDL)
2 Sonachara (SCH) SSP 0%
3 Tapasi (TOP) SSP 0%
4 Ikra
5 Jamuria SP 0%
6 Barabani (BBI) TSS 0%
7 Chinchuriya (COR) SSP 0%
8 Sitarampur (STN)
Status of TPC
phone
REPC
Su
rve
y c
harg
e
sa
nctio
ne
d.
To be
laid
Exis
tin
g
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of Telecom Works for Railway Electrification targetted in 2014-15
Main Section: Andal-Sitarampur
25 KV Targeted Section: Andal-Sitarampur
Tender
opening on
06.06.14
Agency : Tender refloated.
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
Remark/
Status
Exis
tin
g
Not req
Req.
Req.
Exis
tin
g
Exis
tin
g
Project: MAS Main Section: RKM: 175
25 KV Targeted Section: Calicut Yard RKM: 4
RKM: 89
RKM: 86
Gr.No. 157 PDC-Jun'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Shorannur (SRR)
2 Karakad (KRKD)
3 Pattambi (PTB) SSP 80% 0.5 Comp
4Kodumunda
(KODN)
5 Pallippuram (PUM) SP 90% 1.5 Comp
6Perashshannur
(PEU)
7 Kuttippuram (KTU) SSP 40% 0.6 Comp
8 Tirunnavaya (TUA)
9 Tirur (TIR) TSS 0% 0.4
Status of Telecom Works for Railway Electrification targetted in 2014-15
Shoranur - Kannur
2.2 to 25 KV Targeted Section: Calicut- Kannur
Agency :-
Outdoor- M/s Thakur Entp
Rajiv-09438587275
LOA-01.11.11,DOC-28.02.14
Indoor- M/s Webfill
Uttam-09681755645
LOA-01.11.11,DOC-30.4.14
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
1. Cable
terminated at
KRKD, PTB,
PUM, KTU,
CLK & FK.
2. 18 EMC
post erected.
3. Earth
provided at
PTB,PGI &
VLI
ProvidedNot
Provided
CRS Targeted Section:Shoranur-Calicut
Not
Provided
25 K
V D
yn
am
ic c
leara
nce
re
ceiv
ed
Exis
tin
g
Exis
tin
g
Exis
tin
g
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
10 Tannur (TA)
11Parapanangadi
(PGI)SSP 40% 0.8 Comp
12 Vallikunnu (VLI)
13 Kadalundi (KN)
14 Ferok (FK) SP 60% 1.5 Comp
15 Kallayi (KUL)
16 Kozhikode (CLT) SSP 0% 0.5
17 Vellayel (VLL)
18 West Hill (WH)
19 Elattur (ETR)
20 Chemacheri (CMC)
21 Quilandi (QLD) TSS 0% 0.8 Comp
22 Vellarakkad (VEK)
23 Tikkotti (TKT) SSP 0% 0.6 Comp
24 Payyoli (PYOL)
25 Iringal (IGL)
Exis
tin
g
Exis
tin
g
Exis
tin
g
ProvidedNot
Provided
Not
Provided
25 K
V D
yn
am
ic c
leara
nce
re
ceiv
ed
22 MUX & 5
STM for LH
installed.
Indoor work
Completed.
Outdoor Work
for
SP/SSP/TSS
in progress.
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
26 Badagara (BDJ)
27Nadapuram
Rd.(NAU)
28 Mukkali (MUKE) SP 0% 4.5 Comp
29 Mahe (MHE)
30Jagannath Temple
(JGE)
31 Tellicherry (TLY)
32 Dharmadam (DMD)
33 Etakkot (ETK)
34 Kannur South (CS) TSS 0% 0.5 Comp
35 Kannur (CAN)
Exis
tin
g22 MUX & 5
STM for LH
installed.
Indoor work
Completed.
Outdoor Work
for
SP/SSP/TSS
in progress.
Exis
tin
g
Exis
tin
gProvided
Not
Provided
Not
Provided
25
KV
Dyn
am
ic c
lea
ran
ce
re
ce
ive
d
Project: MAS RKM: 153
25 KV Targeted Section: Nethtavati-Penambur RKM: 23
RKM: 50
Gr.No. 158 PDC-Jun'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Kannur (CAN)
2 Chirakkal (CQL)
3Valapattinam
(VAPM)
4Pappinisseri
(PPNS)SSP 0%
5Kannapuram
(KPQ)
6 Payangadi (PAZ) SP 0%
7 Elimala (ELM)
8 Payyanur (PAY) SSP 0%
9 Trikarpur (TKQ)
Exis
tin
g
Exis
tin
g
Exis
tin
g
ProvidedNot
Provided
REPC Remark/ Status
Not
Provided
2.2
KV
anti t
heft
cle
ara
nce
ob
tain
ed
20 MUX & 10 STM for
long haul installed.
Indoor work complete.
SP/SSP/TSS building
work not yet started.
Addnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
TELECOM
Sl.
NoStations
C/H
Bldg.
Main
2.2 to 25 KV Targeted Section: Kannur-Charvattur
Status of Telecom Works for Railway Electrification targetted in 2014-15
Kannur-Manglore-PenamburMain Section:
Agency :- Outdoor- Tender discharged.
Indoor- M/s Webfill
Uttam-09681755645
LOA-01.11.11,DOC-30.4.14
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
REPC Remark/ Status
Addnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phoneSl.
NoStations
C/H
Bldg.
Main
10Chandera (H)
(CDRA)
11 Charvattur (CHV) TSS 0%
12 Nileshwar (NLE)
13 Kanhangad (KZE) SSP 0%
14 Pallikere (PKP)
15 Kotikulam (KQK)
16 Kalanad (KLAD)
17 Kasaragod (KGQ) TSS 0%
18 Kumbla (KMQ) SSP 0%
19 Uppala (UAA)
20 Manjeshwar (MJS) SP 0%
21 Ullal (ULL)
22 Tokkuttu (KOT) SSP 0%
23Nethravathi
(NTVT)
24 Bekal Fort (BFR) SP 0%
25Mangalore Jn.
(MAQ)TSS 0%
Not
Provided
2.2
KV
anti t
heft
cle
ara
nce
ob
tain
ed
20 MUX & 10 STM for
long haul installed.
Indoor work complete.
SP/SSP/TSS building
work not yet started.
Exis
tin
g
Exis
tin
g
Exis
tin
g
ProvidedNot
Provided
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
REPC Remark/ Status
Addnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phoneSl.
NoStations
C/H
Bldg.
Main
26Nethravathi
(NTVT)
27 Sutarpete (SOTE)
28Kankanadi
(KNKD)
29 Thokur (TOK)
30Panambur
(PNMB)
Exis
tin
g
Exis
tin
g
Exis
tin
g
ProvidedNot
Provided
Not
Provided
2.2
KV
anti t
heft
cle
ara
nce
obta
ined
Project: MAS RKM: 262
2.2 KV to 25 KV Targeted section : NIL RKM: 56
CRS Targeted section : Virudhunagar-MEJ-TEN & MEJ-TN RKM: 147
Gr.No. 154 PDC-Jun'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Madurai Jn.(MDU) SSP 0.8
2Tiruparankundram
(TDN)
3Tirumangalam
(TMG)SP 3.5
4 Kalligudi (KGD) SSP 0.2
5Virudunagar Jn.
(VPT)TSS 1.0
6 Tulukapatti (TY) SSP 0.3
7 Sattur (SRT) SP 6.1
8 Nalli (NLL)
9 Kovilpatti (CVP) TSS 0.2
10Kumarapuram
(KPM)SSP 0.2
11 Kadambur (KDU) SP 1.2
12
Vanchi
Maniyachchi Jn.
(MEJ)TSS 0.5
Status of Telecom Works for Railway Electrification targetted in 2014-15
Main Section:
Agency :- M/s J.Hussain Farid
LOA-12.11.10,DOC-31.12.13
Comp
Remark/ Status
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Madurai (Excl)-Nagercoil & Vanchimanyachi-Tutucorin
REPC
Status of TPC
phone
Not
Provided
Provided Provided
Exis
ting
Exis
ting
Exis
ting
Additional
Muxes
provided
by division
against
RE Funds
25
KV
Dyn
am
ic C
lea
ran
ce
ob
tain
ed
Not
Provided
Comp
CRS inspection
completed on
21.08.13
Comp Work completed
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Remark/ StatusSl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
REPC
Status of TPC
phone
13 Naraikkinar (NRK)
14Gangaikondan
(GDN)SSP 0.3
15 Talaiyuthu (TAY)
16Tirunelveli Jn.
(TEN)
17Melappalayam
(MP)SP 0.2
18 Sengulam (SGLM) SSP 0.6
19 Nanguneri (NNN) TSS 50% 0.3
20 Valliyur (VLY) SSP 0.6
21 Aralvaymoli (AAY)
22 Tovalai (THX) SP 4
23 Nagercoil Jn. (NCJ)
24
Vanchi
Maniyachchi Jn.
(MEJ)
TSS 0.5
25Pandiyapuram
(PYM)
26Kailaspuram
(KLPM)
27 Tattapparai (TIP) SSP 0.2
28 Milavittan (MVN)
29 Tutimellur (TME)
30 Tuticorin (TN)
Provided Provided
Provided ProvidedE
xis
tin
g
Exis
tin
g
Exis
tin
g
Additional
Muxes
provided
by division
against
RE Funds
Comp
Comp
Work completed
Provided Provided
25
KV
Dyn
am
ic C
lea
ran
ce
ob
tain
ed
Comp
Project: MAS RKM: 150
CRS Targeted section : Villipuram - Vellore RKM: 150
Gr.No. 155 PDC-Apr'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1Vullupuram
Jn.(VM)
2Venkatesapuram
(VKM)
3 Teli (TEI)
4Mambalapattu
(MMP)SP Comp 1.7
5 Ayandur (AYD)
6 Mugaipur (MUY)
7 Tirikkovilur (TRK) SSP Comp 0.5
8 Adichchanur
(ACN)9
Andampallam
(AND)
10 Tandarai (TNI) TSS Comp 0.7
11Tiruvannamalai
(TNM)SSP Comp 0.6
12Turinjapuram
(TJM)
Addnl
MUX
By RE
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPC
TELECOM
Sl.
NoStations
C/H
Bldg.
Main
Status of Telecom Works for Railway Electrification targetted in 2014-15
Main Section: Villipuram (Excl)-Vellore (Excl)
Agency :- M/s-Puncom
LOA-06.09.11, DOC-31.03.14
Comp Provided Provided
SP/SSP/
TSS Bldg
Location
Exis
ting
Exis
ting
Exis
ting
Not Req.
Remark/ Status
25
KV
Dyn
am
ic C
lea
ran
ce
ob
tain
ed
Work Completed
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Addnl
MUX
By RE
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCSl.
NoStations
C/H
Bldg.
MainSP/SSP/
TSS Bldg
Location
Remark/ Status
13Agaram Sibbandi
(AGM)SP 1.7
14 Polur (PLR) SSP 0.4
15 Arni Road (ARV) TSS 0.4
16Sedarampattu
(SDPT)
17Kannamangalam
(KMM)SSP Comp 0.5
18Kaniyambadi
(KNB)
19
Vellore
Cantonment
(VLR)
SP Comp 4.5
Comp Provided Provided
Comp
Exis
tin
g
Exis
tin
g
Exis
tin
g
Not Req.
25
KV
Dyn
am
ic C
lea
ran
ce
ob
tain
ed
Work Completed
Project: MAS RKM: 33
25 KV Targeted Section: Mettupalayam Yard RKM: 3
RKM: 33
CRS Targeted section : Coimbatore North - Mettupalaiyam RKM: 33
Gr.No. 169 PDC-Jun'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)
At
Stns.
At
SP/SSP/
TSS
1Coimbatore North
Jn. (CBF)SSP
Periyanaikanpalaiy
am (H)
2 Karaimadai (KAY) SSP
3Mettupalaiyam
(MTP)
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
Exis
ting
Exis
ting
Exis
ting
To be
provided
Su
rvey c
ha
rge
s
pa
ym
en
t
sa
nctio
ne
d.
SP/SSP/
TSS Bldg
Location
Status of Telecom Works for Railway Electrification targetted in 2014-15
Main Section: Coimbatore (Excl)-Mettupalaiyam (Excl)
Agency :- Tender to be floated
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
2.2 to 25 KV Targeted Section: Coimbatore North - Mettupalaiyam
Project:JP RKM: 231
25 KV Targeted Section: NIL RKM: 0
RKM: 10
RKM : 10
Gr.No. 148 PDC-May'14 As on 30.05.2014
Total
(Km)
Comp
(Km)Total Comp. At Stns.
At
SP/SSP/
TSS
1 Jhansi (JHS) Exist SP
2 Mustra TSS 0.6
3 Garhmau (GRN)
4 Parichha (PIC) SSP 1.1
5Parichha Thermal
Siding (PTSC)
6 Chirgaon (CGN) SP 1.6
7 Nand Khas (NDK) SSP 0.8
8 Moth (MOTH) TSS 0.8
MainStatus of TPC
phone
REPC Remark/ Status
CR
S o
bta
ine
d.
Provided
SP/SSP/
TSS Bldg
Location
Status of Telecom Works for Railway Electrification targetted in 2014-15
Jhansi-Kanpur Including Ait-Konch
2.2 to 25 KV Targeted Section: Kanpur Anwarganj-Kalyanpur
Main Section:
JHS to Moth
(55RKM)-CRS
sanction received
on 24.09.12
Provided
Indoor- M/s Webfil
Manas-09830792026
LOA-10.10.11,DOC-31.06.14
TELECOM
Sl.
No.Stations
C/H
Bldg.
CRS Targeted Section : Kanpur Anwarganj-Kalyanpur
CompComp
Comp
Exis
ting
Comp Comp.
Agency :-
Outdoor- M/s Karan Singh
Sant Singh-09452023321
LOA-10.08.11,DOC-31.05.14
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS6
Quad
Total
(Km)
Comp
(Km)Total Comp. At Stns.
At
SP/SSP/
TSS
MainStatus of TPC
phone
REPC Remark/ Status
SP/SSP/
TSS Bldg
Location
Sl.
No.Stations
C/H
Bldg.
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS6
Quad
9 Erich Road (ERC) SSP 1.0
10 Parauna (PRN) SSP 0.8
11 Ait Jn. (AIT) SP 2.1
12 Bhua (BHUA) 80% SSP 0.6
13 Orai (ORAI) TSS - 6.0
14 Ata (Ata) SSP 0.7
15 Kalpi (KPI)
16 Chaurah (TNH) SP 2.7
17 Pukhrayan (PHN) SSP 0.8
18 Lalpur (LLR) TSS 0.8
19 Pama (PMN) 80% SSP 1
20 Bhimsen (BZM) 95% SP 6.2
21 Govindpuri (GOY) Exist Exist Exist
22Kanpur Central
(CNB)Exist Exist Exist
25
KV
Dyn
am
ic c
lea
ran
ce
rece
ived
.
CRS inspection
of Moth - Goy
done on
16/17.09.13
Provided Provided
Provided Provided
Comp.
Comp.
Comp
Comp
Exis
ting
CompCompComp
Comp
Comp Comp
Total
(Km)
Comp
(Km)Total Comp. At Stns.
At
SP/SSP/
TSS
MainStatus of TPC
phone
REPC Remark/ Status
SP/SSP/
TSS Bldg
Location
Sl.
No.Stations
C/H
Bldg.
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS6
Quad
23 Kalyanpur
24 Anwarganj SSP 0% 2.9
25Kanpur Central
(CNB)
26 Ait Jn. (AIT) Comp SP Comp 2.1 Comp.
27 Konch Jn. (KNH) 95%
1.OFC blowing comp.
2. Jhansi to Kanpur OFC commissioned & handed over to RCIL .
3. OFC Building work in progress at three stations - Bhua, Pama, Bhimsen.
4. Kalyanpur, Anwarganj indoor OFC equipment to be installed.
5. OFC splicing 6 Nos. to be done in Ait-Konch.
Not
Provided
Not
Provided
Provided ProvidedComp Comp
Exist
Mu
x
Pro
vid
ed
.
Comp
Exist
Exis
t
Project: JP RKM: 72
25 KV Targeted Section: NIL RKM: 0
RKM: 72
RKM : 72
Gr.No. 165 PDC-Feb'15 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Rewari (RE) SP 0%
2Rewari Anajmandi
(ANAI)
3 Karnawas (KNGT) SSP 0%
4 Bhrawas
5 Bawal (BWL) SSP 0%
6Majri Nangal
(MJNL)SSP 0%
7 Ajerka (AIA) SSP 0%
8 Khanpur-Ahir SSP 0%
9 Harsauli (HIS)
10 Khairthal (KRH) TSS 0%
11 Ghatla (GAL) SSP 0%
12 Parisal (PSL) SSP 0%
13 Alwar (AWR) SP 0%
2.2
KV
anti t
heft
cle
ara
nce
re
ceiv
ed.
Additonal
MUX has
been
provided at
all stations.
Work in
progress
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
Not
Provided
Main Section:
Exis
tin
g
Exis
tin
g
Exis
tin
g
Not
ProvidedProvided
Sl.
NoStations
C/H
Bldg.
Main
Status of Telecom Works for Railway Electrification targetted in 2014-15
Alwar-Rewari
Agency :-
M/s Kandelwal
Khandelwal-09414050260
LOA-16.08.12,DOC-31.08.14
TELECOM
2.2 to 25 KV Targeted Section: Alwar-Rewari
CRS Targeted Section : Alwar-Rewari
REPCRemark/
Status
Addnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
Project: JP RKM: 123
25 KV Targeted Section: NIL RKM: 0
RKM: 123
RKM : 123
Gr.No. 163 PDC-Oct'14 As on 30.05.2014
Total HDPEOFC
Blow
6
QuadTotal Comp.
At
Stns.
At
SP/SS
P/ TSS
1 Mathura
(MTJ)0
2 Bhuteshwar Mathura-
Bhuteshwar2.41 0 SP 100% 1.4 1.4
3 Mora 10%Bhuteswar-
Mora9.33 9.3 9.33 SSP 0%
4 Radha Kund SSP 95% 7.7 7.7
5Govardhan
(GDO)Porta
Mora -
Govardhan14.04 14.0 14 SSP 80% 1.7 1.7
6 Vehaj SSP 10% 7.4 7.0
7 Deeg (DEEG) 95%Govardhan -
Deeg15.18 15.0 15 TSS 0% 0.8 0.8
8Bedham
(BEDM)90%
Deeg -
Bedham12.01 11.8 10 SSP 60% 0.7 0.7
9 Barsana SSP 0% 7.0 6.8
10 Brijnagar 30%Bedham-
Brijnagar12.24 12.0 12 SP 0% 1.9 1.9
To be
Provide
d
Not
Prov
Not
Prov
Main Section:
STM
& MUX
By RE
Main
CRS Targeted Section : Mathura-Alwar
Exist
SP/SSP
/ TSS
Bldg
Locatio
n
SP/SSP/
TSS
Bldg
status
Cable laying
for
SP/SSP/TSS
Status of TPC
phoneRemark/
Status
TELECOM
Sl.
NoStations
C/H
Bldg.REPC
Block
Section
Exis
ting
25 K
V D
ynam
ic c
leara
nce r
eceiv
ed
Status of Telecom Works for Railway Electrification targetted in 2014-15Mathura (Excl) - Alwar
2.2 to 25 KV Targeted Section: Mathura-Alwar
Agency :-M/s Micromap,LKO
LOA-22.02.13,DOC-30.06.14
Total HDPEOFC
Blow
6
QuadTotal Comp.
At
Stns.
At
SP/SS
P/ TSS
STM
& MUX
By RE
Main SP/SSP
/ TSS
Bldg
Locatio
n
SP/SSP/
TSS
Bldg
status
Cable laying
for
SP/SSP/TSS
Status of TPC
phoneRemark/
Status
Sl.
NoStations
C/H
Bldg.REPC
Block
Section
11 Jhareda SSP 0% 6.5 6.0
12Govindgarh
(GVH)Porta
Brijnagar -
Govindgarh12.2 11.6 SSP 0% 0.8 0.7
13Jadali Ka Bas
(JBS)Porta
Govindgarh -
Jadoli ka
Bas
11.49 10.4 SSP 0% 0.7 0.6
14Ramgarh
(RAH)95%
Jadoli Ka
Bas-
Ramgarh
8.46 7.2 TSS 60% 0.5
15 Ootwar (OTO) PortaRamgarh -
Ootward11.09 8.0 SSP 0% 0.6
16 Gazika SP 0% 7.5
17 Alwar (AWR) ExistOotward-
Alwar14.73 2.0 4.0
123.2 101.4 60.33 49.15 35.3
25 K
V D
ynam
ic c
leara
nce r
eceiv
ed
Exis
ting
To be
provide
d
Not
Prov
Not
Prov
Project: JBP RKM: 209
25 KV Targeted Section: Cheoki - Manikpur RKM: 92
Gr.No. 173 A PDC-Mar'15 As on 30.05.2014
OFC4
QuadTotal Comp.
At
Stns.
At
SP/SSP/
TSS
1 Naini (NYN)
2 Link Jn. (LKJN)
3 Iradatganj (IDGJ) SSP
4 Jasra (JSR)
5 Lohgara (LOG) SP
6Shankargarh
(SRJ)
7 Majhiari (MJHR) SSP
8 Bargarh (BRG)
9Kataiya Dandi
(KTDD)TSS
10 Dabhaura (DBR)
11 Panhai (PNHI) SSP
12Manikpur Jn.
(MKP)
SP/SSP/
TSS Bldg
Location
Status of Telecom Works for Railway Electrification targetted in 2014-15
Main Section: Cheoki-Manikpur including Satna- Rewa
Agency :- Tender to be floated.
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
Not
Provided
Tender to
be floated.
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
To b
e r
ep
lace
by 6
Qu
ad
Exis
ting
Exis
ting
To be
provided
Not
Provided
Project: JBP RKM: 209
25 KV Targeted Section: Satna- Rewa & Satna- Jaitwar RKM: 70
Gr.No. 173B PDC-Mar'15 As on 30.05.2014
OFC4
QuadTotal Comp. At Stns.
At
SP/SSP/
TSS
1 Satna (STA)
2 Kaima (KMA)
3 Sakaria (SAKR) SSP
4Hinauta Ramban
(HNM)
5Baghai Road
(BGHI)SP
6 Turki (TZR)
7 Rewa (REWA) SSP
8 Jaitwar (JTW)
9 Hati (HATI) TSS
10 Sagma (SAGM)
Not
Provided
Remark/
StatusREPC
Exis
ting
Exis
ting
To b
e r
ep
lace
by 6
Qu
ad
To be
provided
Not
Provided
Status of Telecom Works for Railway Electrification targetted in 2014-15
Cheoki-Manikpur including Satna- Rewa
Agency :-
TELECOM
Sl.
NoStations
C/H
Bldg.
MainCable laying for
SP/SSP/TSS
Status of TPC
phone
Main Section:
Tender to be floated
Addnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Project: JBP RKM: 485
25 KV Targeted Section: Katni-Maihar RKM: 60
Gr.No. 174 PDC-Mar'15 As on 30.05.2014
OFC4
QuadTotal Comp. At Stns.
At
SP/SSP/
TSS
1 Satna Jn. (STA)
2Lagargawan
(LGCE)
3 Unchehara (UHR) SSP
4 Maihar (MYR)
5 Bhadanpur (BUU) SP
6 Amdara (UDR)
7Pakariya Rd
(PKRD)SSP
8 Jukehi (JKE)
9 Patwara (PTWA) TSS
10 Katni Jn. (KTE)
11Katni South (KTE-
S)SSP
12Madhavnagar
(MDVR)
TELECOM
Status of Telecom Works for Railway Electrification targetted in 2014-15
Main Section: Satna-Jabalpur
Agency :- Tender to be floated.
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
Not
Provided
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
SP/SSP/
TSS Bldg
Location
Exis
ting
Exis
ting
To b
e r
ep
lace
by 6
Qu
ad
To be
provided
Not
Provided
OFC4
QuadTotal Comp. At Stns.
At
SP/SSP/
TSS
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
Status
SP/SSP/
TSS Bldg
Location
13Sleemnabad
(SBD)14 Dundi (DDCE)
15Sihora Road
(SHR) 16 Gosalpur (GSPR) SSP
17 Deori (DOE)
18 Adhartal (ADTL)
19Jabalpur Jn. (JBP)
Project: LKO RKM: 207
25 KV Targeted Section: NIL RKM: 0
RKM: 207
Gr.No. 153 PDC-Oct'14 As on 30.05.2014
Total
(Km)
Comp
(Km)
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1Varanasi Jn.
(BSB)
2 Lohata (LOT) BSB-LOT 6.5 SSP Comp 0.9
3Chaukhandi
(CHH)LOT-CHH 11 SP Comp 2
4 Sewapuri (SWPR)CHH-
SWPR7
5 Kapsethi (KEH)SWPR-
KEH5.5 SSP Comp 0.6
6 Parsipur (PRF) KEH-PRF 8.5
7 Bhadohi (BOY) PRF-BOY 8.5 TSS Comp 0.5
8 Mondh (MOF) BOY-MOF 8.2
9 Suriawan (SAW) MOF-SAW 7.4 SSP 90% 0.5
Comp
Comp
REPCRemark/
Status
Exis
ting
ProvidedNot
Provided
25
KV
Dyn
am
ic c
lea
ran
ce
rece
ived
6
Quad
SP/SSP/
TSS
Bldg
Location
SP/SSP
/ TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
Status of Telecom Works for Railway Electrification targetted in 2014-15
Varanasi-Phaphamau-Unchahar-ALD
Agency :-
Outdoor -M/s Purvanchal,Jaunpur
Sanjay Singh-09415207132
LOA-23.07.10,DOC-30.06.14
Indoor- M/s Micromap,LKO
Jagdish Singh-09838078055
LOA-09.11.12,DOC-31.07.14
Main Section:
CRS Targeted Section : NIL RKM: 0
2.2 to 25 KV Targeted Section: BSB-Phaphamau incl ALD-Prayag-Phaphamau-Unchahar
TELECOM
Sl.
NoStations
C/H
Bldg.
OFC Main
Comp
Block
Section
Total
(Km)
Comp
(Km)
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
REPCRemark/
Status
6
Quad
SP/SSP/
TSS
Bldg
Location
SP/SSP
/ TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phoneSl.
NoStations
C/H
Bldg.
OFC Main
Block
Section
10Sarai Kansari
(SON)95% SAW-SQN 10
11 Janghai Jn. (JNH) 80% SQN-JNH 5.5 SP 90% 2.0 Comp
78.1 78.1
12Baryarampur
(BYHA)SSP 80% 0.3 0.0
13Ugrasenpur
(URPR)
14 Phulpur (PLP) SSP 50% 0.7 0.0
15Saraichandi
(SYC)TSS 80% 0.6 0.0
16 Tharwai (THW)
17Phaphamau Jn.
(PFM)
18Allahabad Jn.
(ALD)SP 100% 1.5 0.0
19 Prayag (PRG) SP 70% 1.5 0.0
20Phaphamau Jn.
(PFM)80% SSP 90% 1.0 Comp
21 Atrampur (ARP) PFM-ARP 14 SP 60% 1.7 Comp.
22Ramchaura Road
(RMC)ARP-RMC 7
23Lalgopalganj
(LGO)RMC-LGO 7.5 SSP 65% 0.7 Comp
24 Bhadri (BHDR) LGO-BHDR 7
25Kunda H. Ganj
(KHNM)90%
BHDR-
KHNM7.2 7.2 SSP 70% 0.7 0
Comp
25
KV
Dyn
am
ic c
lea
ran
ce
rece
ived
ProvidedNot
Provided
Exis
ting
Comp
BSB to JNH
Comp
Commissioned by NR
Total
(Km)
Comp
(Km)
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
REPCRemark/
Status
6
Quad
SP/SSP/
TSS
Bldg
Location
SP/SSP
/ TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phoneSl.
NoStations
C/H
Bldg.
OFC Main
Block
Section
26Garhi Manakpur
(GRMR)90%
KHNM-
GRMR11.8 5.4 TSS 70% 0.7 Comp
27Pariawan Road
(PON)85%
GRMR-
PQN7.2 0.0 SSP 60% 0.9 Comp
28 Arkha (ARKA) 70%PQN-
ARKHA8.8 0.0 SSP 70% 0.6 Comp
29Unchahar Jn.
(UCR)80%
ARKHA-
UCR2.5 0.0
73 47.0PFM-UCR
Outdoor:
Total OFC blowing done - 125/151Km.
OFC blowing & splicing completed from BSB to Janghai. (78/78 RKM)
OFC blowing from Phaphamau to Kunda Ganj completed.(47/73 RKM)
Total Splicing done-37/61 Nos.
Splicing from BSB to Jangahai done. (37/37 Nos.)
Splicing from Phaphamau to Unchahar to be done. (0/24 Nos.)
Indoor:
Commissioning of MUX & STM done from BSB to Janghai . Mux & STM installed from PFM to Bhadri.
Cable laying for SP/SSP/TSS completed at Lohta,Chaukhandi, Kapsethi,Bhadoi & Jangahi,Garhi Manikpur,Pariawan & Arkha.
Jointing completed at BSB to Atrampur.
TPC commissioned from BSB-PFM ,Prayag.
Project: LKO RKM: 181
25 KV Targeted Section: Sitapur Cantt-Rosa RKM: 86
RKM: 95
Gr.No. 164 PDC-Mar'15 As on 30.05.2014
Total HDPEOFC
Blow
6
Quad
Total
(Km)
Comp.
(Km)
At
Stns.
At
SP/SSP/
TSS1 ROSA (RAC) 5% SSP
2 Bantara (BRTA) 25%RAC-
BRTA8.0 0.00
3 Unchaulia (UCH) 75%BRTA-
UCH5.0 2.00 SSP 0%
4Jangbahadur
ganj (JBG)75%
UCH-
JBG11.3 8.00 SP 0%
5Jahani Khera
(JKH)60%
JBG-
JKH7.1 3.50
6Mahgal Ganj
(MING)Comp
JKH-
MING10.5 7.30 SSP 0%
8 Maholi (MAHO) 85%MING-
MAHO15.7 10.40 SSP 0%
9 Hempur (HMP) 85%MAHO-
HMP9.9 6.20 TSS 60%
10Sitapur City
(SPC)
HMP-
SPC11.9 8.00 SP 0%
12Sitapur Cantt
(SCC)
SXK-
SCC4.4 0.00 SP 0%
83.5 45.3
Not
Provided
Exis
ting
RAC to SCC
TELECOM
Sl.
NoStations
C/H
Bldg.
MainBlock
Section
Rosa-Sitapur-Burhwal
Status of Telecom Works for Railway Electrification targetted in 2014-15
Agency:- M/s Micromap,LKO
LOA-15.03.12,DOC-30.06.14
Main Section:
2.2 to 25 KV Targeted Section: Burhwal-Sitapur Cantt
REPCRemark/
Status
Status of TPC
phone
Not
Provide
d
Not
Provided
2.2
KV
an
ti-t
he
ft c
lea
ran
ce
ob
tain
ed
.
STM &
MUX
By RE
SP/SSP
/ TSS
Bldg
Locatio
n
SP/SSP
/ TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Total HDPEOFC
Blow
6
Quad
Total
(Km)
Comp.
(Km)
At
Stns.
At
SP/SSP/
TSS
Sl.
NoStations
C/H
Bldg.
MainBlock
SectionREPC
Remark/
Status
Status of TPC
phoneSTM &
MUX
By RE
SP/SSP
/ TSS
Bldg
Locatio
n
SP/SSP
/ TSS
Bldg
status
Cable laying for
SP/SSP/TSS
13Tappakhajuria
Halt (TKUR)SP 0%
14 Parsendi (PSN) SSP 0% 0.8 Comp
15 Viswan (BVN) Comp TSS 20%
16 Sarayan (SYU) 64% SSP 0%
17Mahmudabad
(MMB)SSP 0%
18Mundagopal
Ashram (MGPA)
19Tahsil Fatehpur
(TSF)SP 0%
20Sundhiamau
(SDAM)SSP 0%
21 Burhwal (BUW) 51% TSS 0%
1. Main OFC work of 83.0 Km from ROSA to Sitapur Cantt of NR is to be done by RE.
2. HDPE Duct laying in progress. Total Duct laid 45.4 RKM, OFC blowing yet to start.
3. Sitapur Cantt to Burhwal OFC work commissioned by NER.
Exis
tin
g To be
provided
by RE
Exis
tin
g
At Parsendi
Stn to SSP
PIJF 10 Pr
800mtrs laid.C
om
mis
sio
ne
d b
y N
ER
Not
Provide
d
Not
Provided
2.2
KV
an
ti-t
he
ft c
lea
ran
ce
ob
tain
ed
.
Project: GKP RKM: 245
25 KV Targeted Section: NIL RKM: 0
RKM: 147
RKM: 245
Gr.No. 142 PDC-Oct'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Barabanki (BBK) SP 2.2
2Jahangirabad
(JBR)
3 Rafi Nagar (RFR)
4 Bindaura (BUR) SSP 1.3
5 Burhwal (BUW) TSS 0.7
6Chowka Ghat
(CKG)
7Ghaghra Ghat
(GHT)
8 Jarwal Rd (JLD) SSP 0.3
9 Sarju (SUJ)
10 Colonelganj (CLJ) SP 1.2
11 Kasturi (KSR)
12 Maijapur (MIR) SSP 1.3
Exis
ting
Exis
ting
Comp
Cable laying for
SP/SSP/TSSAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Provided ProvidedComp
Work
completed in
BBK-Maijapur
section
Provided
25
KV
Dya
na
mic
cle
ara
nce
ob
tain
ed
.
Main
Status of Telecom Works for Railway Electrification targetted in 2014-15
Barabanki (Excl)-Gorakphpur Cantt (Excl)
2.2 to 25 KV Targeted Section: Baruachak-Govindnagar-GKP Cantt
Agency :-
Outdoor- M/s ITI, LKO
Adip Sinha -09450453520
LOA-28.05.08,DOC-31.3.14
Indoor- M/s Fibcom
LOA-15.01.08,DOC-14.01.09
Main Section:
CRS targeted Section : Barabanki-Gonda-GKP Cantt
Remark/
Status
Status of TPC
phone
REPC
TELECOM
Sl.
NoStations
C/H
Bldg.
Exis
ting
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Cable laying for
SP/SSP/TSSAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Main
Remark/
Status
Status of TPC
phone
REPCSl.
NoStations
C/H
Bldg.
13 Kathola (KTHL)
14Gonda Kacheri
(GDK)
15 Gonda (GD) SSP Comp 0.7
16 Baruachak (BRCK) TSS Comp 0.5 Comp Provided
17 Motiganj (MOTG)
18 Jhilahi (JLHI) SSP Comp 0.7
19 Mankapur (MUR)
20Lakhpatnagar
(LKNR)SSP 0% 0.6
21 Maskanwa (MSW)
22Swaminarayan
(SNC)SP 0% 1
23 Babhan Jyotiya
24 Babhnan (BV) SSP 0% 0.6
25 Gaur (GAU) SSP Comp 0.8
26 Tinich (TH)
27Govind Nagar
(GOVR)TSS Comp 0.7 Comp Provided
28 Basti (BST)
29 Orwara (ORW) SSP 0% 0.7
30 Munderwa (MND)
31 Chureb (CRV) SSP 0% 1
32 Khalilabad (KLD) SP 0% 1.6
Exis
tin
g
Exis
tin
g
Provided Provided
SSP/TSS/SP
building not
ready.
Not
Provided
Not
Provided
25
KV
Dya
na
mic
cle
ara
nce
ob
tain
ed
.
Not
Provided
Exis
tin
g
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Cable laying for
SP/SSP/TSSAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Main
Remark/
Status
Status of TPC
phone
REPCSl.
NoStations
C/H
Bldg.
33 Maghar (MHH) SSP 0% 3.5
34 Sihapar (SIPR)
35 Sahjanwa (SWA)
36 Jagat Bela (JTB) SSP 0% 1.2
37Domingarh (DMG)
38Gorakhpur City
(GKY)
39 Gorahkpur (GKP) SSP 0% 1.3
40Gorakpur Cantt
(GKC)TSS 80% 1.5 Comp Provided
Exis
tin
g
Exis
tin
g
Provided
Not
Provided
Provided
SSP/TSS/SP
building not
ready.
Not
Provided
25
KV
Dya
na
mic
cle
ara
nce
ob
tain
ed
.
Exis
tin
g
Project: GKP RKM: 203
25 KV Targeted Section: Chaurichaura-Gauribazar RKM: 8
RKM: 77
RKM : 203
Gr.No. 141 PDC-Oct'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1Gorakpur Cantt
(GKC)
Not
Provided
2 Kausambi (KHM)
3Sardar Nagar
(SANR)SSP
4Chauri Chaura
(CC)
5 Gauri Bazar (GB) SP
6 Baitalpur (BALR)
7Deoria Sadar
(DEOS)SSP
8 Ahilyapur (AHLR)
9 Nunkhar (NRA) TSS Comp
Stations
Main
0%
Provided
Not
Provided
REPCRemark/
Status
Exis
ting
Exis
ting
Exis
ting
ProvidedNot
Provided
25
KV
Dyn
am
ic c
lea
ran
ce
rece
ived
SP/SSP/TSS
building not
ready.
C/H
Bldg.
Status of Telecom Works for Railway Electrification targtted in 2014-15
Gorakhpur Cantt (Incl)-Chapra Katchery (Incl)
Addnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
2.2 to 25 KV Targeted Section: Bhatpar Rani - Chaurichaura- Gorakpur Cantt
Agency :-
Outdoor- M/s ITI, LKO
Adip Sinha -09450453520
LOA-28.05.08,DOC-31.3.14
Indoor- M/s Fibcom
LOA-15.01.08,DOC-14.01.09
Status of TPC
phone
Main Section:
CRS Targetted section : Siwan- GKC & CPR-SV-Thawe
TELECOM
Sl.
No
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Stations
Main
REPCRemark/
Status
C/H
Bldg.
Addnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phoneSl.
No
10 Bhatni (BTT) SSP
11 Nonapur (NNPR)
12Bhatpar rani
(BHTR)SSP
13 Bankata (BTK)
14 Mairwa (MW) SP
15 Karchhue (KYW)
16 Jiradai (ZRDE) SSP
17 Siwan (SV) SSP 0.9
18 Pachrukhi (PCR) TSS 0.3
19 Duraundha (DDA)
20 Chainwa (CW) SSP 0.7
21Mahendra Nath
(MHRM)
22 Ekma (EM) SP 1.86
23 Daudpur (DDP)
24Kopa Samhota
(KPS)SSP 0.71
25 Tekniwas (TKV)
26 Chappra (CPR) SSP 0.68
27Chappra Kacheri
(CI)TSS 3.28
Comp
0%
Comp
Exis
ting
Exis
ting
Exis
ting
Provided
25
KV
Dyn
am
ic c
lea
ran
ce
rece
ived
SP/SSP/TSS
building not
ready.
Provided
Provided
Not
Provided
Provided
Project: DNR RKM: 157
RKM: 60
RKM : 142
Gr.No. 140A PDC-Jun'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Hajipur (HJP)
2 Sarai (SAI) SSP 2
3 Bithauli (BTHL)
4Bhagwanpur
(BNR)SP 1.7
5 Benipatti (BNPT)
6 Goraul (GRL)
7 Kurhani (KHI) SSP 0.8
8 Turki (TUR) TSS 2.0
9Ramdyalu Nagar
(RD)
10Muzaffarpur
(MFP)
RC not
commissioned
due to RTU not
provided by
electrical
Provided Provided
25
KV
Sta
tic C
lea
ran
ce
ob
tain
ed
Comp. Comp.
Exis
ting
Exis
ting
Exis
ting
Provided
Remark/
Status
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPC
Status of Telecom Works for Railway Electrification targetted in 2014-15
HJP (Excl)-BJU (Excl) via Muzaffarpur
2.2 to 25 KV Targeted Section: MFP-Samastipur
Agency :-
Outdoor- M/s ITI, LKO
Adip Sinha -09450453520
LOA-28.05.08,DOC-30.06.14
Indoor- M/s Fibcom
LOA-15.01.08,DOC-14.01.09
Main Section:
CRS Targeted section : HJP-MFP-Bachwara
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Remark/
Status
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPC
11Narayanpur
Anant (NRPA)SSP 0.6
12 Silaut (SLT) SSP 1.6
13 Siho
14 Dholi (DOL) SP 1.1
15 Dubaha (DUBH)
16Khudiram Bose
(KRBP)SSP 2.0
17KarpuriGaram
(KPGM)
18 Samastipur (SPJ) TSS 1.5
19 Ujjiarpur (UJP) SSP 0.9
20 Nazirgang (NAZJ)
21Dalsingh Sarai
(DSS)SP 1.6
22Sadajagat (SDJT)
23 Bachwara (BCA) TSS 0.8
24 Teghra (TGA)
25Barauni Flag
(BUJ)SP 2
26 Barauni (BJU)
RC not
commissioned
due to RTU not
provided by
electrical
Provided Provided
25
KV
Sta
tic C
lea
ran
ce
ob
tain
ed
Comp. Comp.Provided
Exis
tin
g
Exis
tin
g
Exis
tin
g
Project: DNR RKM: 187
25 KV Targeted Section: Karhagola Road-Katareah RKM: 2
RKM: 177
RKM : 177
Gr.No. 149 PDC-Dec'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Barauni (BJU) SP 85% 3.6
2 Bihat (BEHT)
3 Tilrath (TIL)
4 Begusarai (BGS) SSP 85% 0.5
5 Lakho (LAK)
6 Danawli (DPL) SSP 85% 0.7
7 Lakhminia (LKN)
8Santha Halt
(SANH)
9Sahibpur Kamal
(SKJ)SSP 85% 0.6
Status of TPC
phone
REPCRemark/
Status
Exis
ting
Exis
ting
Exis
ting
Not Req ProvidedNot
Provided
25
KV
Dyn
am
ic c
lea
ran
ce
rece
ive
d
Eqpt wiring in
progress.
Addnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
Comp
TELECOM
Sl.
NoStations
C/H
Bldg.
Main
Status of Telecom Works for Railway Electrification targetted in 2014-15
Barauni (Excl)-Katihar (Excl)
2.2 to 25 KV Targeted Section: BJU-Mansi & Mansi - Katihar
Agency :-
M/s ITI
Adip Sinha-09450453520
LOA-24.06.11,DOC-31.03.14
Main Section:
CRS Targeted section : Barauni - Katihar
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Status of TPC
phone
REPCRemark/
Status
Addnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSSSl.
NoStations
C/H
Bldg.
Main
10Umesh Nagar
(UMNR)
11 Khagaria (KGG) TSS 85% 1.2
12 Man Singh (MNE) SSP 85% 0.3
13Mahesh Kunt
(MSK)SP 50% 1.3
14 Gauchhari(GAI)
15 Pasraha (PSR) SP 0% 0.6
16Narayanpur
(NNP)SSP 85% 0.4
17Thanabihpur
(THB)
18 Kharik (KHU) SSP 0% 1.0
19Naughachia
(NNA)TSS 0% 1.5
20 Katareah (KTRH) SSP 0% 0.3
21 Kursela (KUE)
22 Bakhri (BKHR) SP 0% 1.6
23Karhagola Road
(CRR)SSP 0% 0.8
24 Semapur (SMO) SSP 0% 0.4
25 Katihar (KIR)
Not
Provided
25
KV
Dyn
am
ic c
lea
ran
ce
rece
ived
Trenching
work in
progressExis
ting
Exis
ting
Exis
ting
Not ReqNot
Provided
Comp
Project: DNR RKM: 257
25 KV Targeted Section: Garwa Rd-Renukut-Chopan RKM: 140
Gr.No. 176 PDC-Mar'15 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1Garwa Road
(GHD)TSS 0%
2 Garhwa (GHQ) SSP 0%
3 Meralgram(MQX) SP 0%
4 Ramna(RMF) SSP 0%
5 Nagaruntari (NUQ) TSS 0%
6Wyndhamganj
(WDM)SSP 0%
7 Mahuariya(MXY) SP 0%
8Dudhinagar
( DXN)SSP 0%
9 Jharokhas (JRQ) SSP 0%
10Muirpur Road
(MPF)
Tender
floated.
Not
Provided
Not
Provided
Exis
ting
Exis
ting
Exis
ting
To be
Provided
Status of TPC
phone
REPCRemark/
Status
Addnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
TELECOM
Sl.
NoStations
C/H
Bldg.
Main
Status of Telecom Works for Railway Electrification targetted in 2014-15
Garwa Rd-Chopan-Singrauli (incl)
Agency :- Tender opening on 19.05.14
Main Section:
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Status of TPC
phone
REPCRemark/
Status
Addnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSSSl.
NoStations
C/H
Bldg.
Main
11 Renukut (RNQ) TSS 0%
12 Jogidih (JGF) SSP 0%
13 Gurmur (GMX) SSP 0%
14 Paraspa
15Salai Banwa
(SLBN)SP 0%
16 Billi (BXLL) SSP 0%
17 Chopan (CPU) TSS 0%
18 Magardah (MWF) SSP 0%
19Khuldil Road
(KDRD)
20Mirchandhori
(MCQ)SP 0%
21KaraIla Road
(KRLR)SSP 0%
22 Singarauli(SGRL) SSP 0%
23 Mahadiya (MHDA)
24Karala Road
(KRLR)
25 Anpara (ANPR) SP 0%
26Krishnashilla
(KRSL)
27Shaktinagar
(SKTN)
Not
Provided
Tender
floated.
Exis
tin
g
Exis
tin
g
Exis
tin
g
To be
Provided
Not
Provided
Project: NJP RKM: 87
25 KV Targeted Section: Kumedpur-Adina RKM: 39
Gr.No. 171 PDC-Dec'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1Kumedpur Jn.
(KDPR)SP 0%
2Harishchandrapur
(HCR)
3 Milangarh SSP 0%
4Bhaluka Road
(BKRD)
5 Samsi (SM) TSS 0%
6 Kumarganj
7 Eklakhi (EKI) SSP 0%
8 Adina (ADF)
9 Old Malda (OMLF) SP 0%
10Malda Town
(MLDT)
11 Old Malda (OMLF)
12Bulbul Chandi
(BBCE)
13 Singhabad (SQB)
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPC Remark/ Status
Not
Provided
Not
Provided
Total 36 Km of
OFC from Old
Malda to
Singhabad to be
provided.
Tender to be
floated.
Status of Telecom Works for Railway Electrification targetted in 2014-15
Kumedpur-Malda Town incl Old Malda-Singhabad
Agency :- Tender to be floated.
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Main Section:
Exis
ting
Exis
ting
To be
Provided
Exis
ting
To b
e
Pro
vid
ed
Project: NJP RKM: 267
RKM: 62
RKM: 90
Gr.No. 150 PDC-Mar'15 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(By RE)
At
Stns.
At
SP/SSP/
TSS
1 Katihar Jn. (KIR) TSS 0%
2 Nayatola (NYT)
3 Dandkhora (DNQ)
4 Gorphar (GRR)
5 Sonaili (SI) SP 0%
6 Jhaua(JAU)
7 Meenapur (MENP)
8 Salmari (SRI)
9 Mukuria Jn. (MFA)
10 Barsoi Jn. (BOE) SSP 0%
11Sanjay Gram
(SJGN)
12 Sudhani (SUD) SSP 0%
13 Ajharail (AHL)
14 Telta (TETA)
15 Dalkhola (DLK) TSS 0%
16 Surjakamal (SJKL)
Status of Telecom Works for Railway Electrification targetted in 2014-15
Katihar-Barsoi-Raninagar
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSS
2.2 to 25 KV Targeted Section: KIR-Kumedpur-Mukeria & KIR-Mukeria
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
Status of TPC
phone
Main Section:
25 KV Targeted Section: Dumadangi-NJP-Raninagar Jalpaiguri & Katihar Yard
M/s ECI-SPIC-SMO-McML,
Ratnam-09866760008Agency :-
Exis
ting
Not
Req.
2.2
KV
an
ti t
he
ft c
lea
ran
ce
rece
ived
REPCRemark/
Status
Exis
ting
Exis
ting
Work yet to startNot
Provided
Not
Provided
OFC6
Quad
Total
(Km)
Comp.
(By RE)
At
Stns.
At
SP/SSP/
TSS
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSSSl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
Status of TPC
phone
REPCRemark/
Status
17 Kanki (KKA) SSP 0%
18 Hatwar (HWR)
19 Kishanganj (KNE) SP 0%
20 Pangipara (PJP)
21 Gaisal (GIL) SSP 0%
22 Gunjaria (GEDR) TSS 0%
23 Aluabari Road
24 Dhulabari (DBQ)
25 Mangurjan (MXJ)
26 Tinmilehat (TMH) SSP 0%
27 Dumdangi (DMZ) SP 0%
28 Chatterhat (CAT)
29 Nijbari (NJB) SSP 0%
30 Rangapani (RNI) TSS 0%
31New Jalpaiguri
(NJP)
32Ambari Falakata
(ABFC)SSP 0%
33 Belakoba (BLK)
34Raninagar
Jalpaiguri (RQJ)SSP 0%
Exis
ting
Exis
ting
Exis
ting
Work yet to startNot
Provided
Not
Provided
Not
Req.
2.2
KV
an
ti t
he
ft c
lea
ran
ce
rece
ived
OFC6
Quad
Total
(Km)
Comp.
(By RE)
At
Stns.
At
SP/SSP/
TSS
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS Bldg
status
Cable laying for
SP/SSP/TSSSl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
Status of TPC
phone
REPCRemark/
Status
35 Katihar Jn. (KIR) TSS 0%
36 Kuretha (KUQ)
37 Sahja Halt (SAJH)
38Pranpur Road
(PQD)SSP 0%
39 Labha (LAV)
40Dillidewanganj
(DVJ)
41Kumedpur Jn.
(KDPR)SSP 0%
42Babhangaon-
H(BAHN)43 Khurail (KWE)
44Azamnagar
Road(AZR)SP 0%
45Bhawanipur
Bihar(BWPB)46 Mukuria Jn.(MFA)
Exis
tin
g
Exis
tin
g
Exis
tin
g
2.2
KV
anti t
heft
cle
ara
nce
re
ceiv
ed
Work yet to
start
Not
Req.
Not
Provided
Not
Provided
Project:SC RKM: 125
25 KV Targeted Section: Settihalli-Yeliyur RKM: 35
RKM: 0
RKM: 30
Agency:-
Gr.No. 156 PDC-Mar'15 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Bangalore City
(SBC)
2Nayanadahalli
(NYH)
3Jnanabharati
(GNB)
4 Kengeri (KGI) SP comp 2.6
5 Hejjala (HJL) SSP comp 1.9
6 Bidadi (BID) TSS comp 3.0
7 Ketohalli (KHLL)
8Ramanagaram
(RMGM)SSP comp
9Channapatna
(CPT)SSP 0%
10 Sethihalli (SET)
TELECOM
Sl.
NoStations
C/H
Bldg.
Main
Status of Telecom Works for Railway Electrification targetted in 2014-15
Banglore-Kengri-Mysore
2.2 to 25 KV Targeted Section: NIL
CRS Targeted Section: Kangeri - Ramnagram
Main Section:
Status of TPC
phoneAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
M/s Soma,SC
Madhu-09908769690
LOA-14.08.12,DOC- 13.01.14
Exis
tin
g
Exis
tin
g
Exis
tin
g
Not
Req
REPC Remark/ Status
Comp
Provided
25 K
V D
yn
am
ic c
leara
nce
re
ceiv
ed
Electrified
Work under progress
Provided
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Sl.
NoStations
C/H
Bldg.
MainStatus of TPC
phoneAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
REPC Remark/ Status
11 Nidaghatta (NZH)
12 Maddur (MAD) SSP 0%
13 Hanakeri (HNK)
14 Mandya (MYA)
15 Yeliyur (Y) TSS 0%
16 Byadrahalli (BDRL)
17Chandragirikoppal
(CGKR)SP 0%
18Pandavapura
(PANP)
19 Shrirangapattana SSP 0%
20 Naganahalli (NHY) TSS 0%
21 Mysore New Goods
Terminal (MNGT)22 Mysore Jn. (MYS)
Exis
tin
g
Exis
tin
g
Exis
tin
g
Not ReqNot
ProvidedWork under progress
Not
Provided
25 K
V D
yn
am
ic c
leara
nce
re
ceiv
ed
Project: SC RKM: 213
25 KV Targeted Section: Nallapadu-Vinukonda RKM: 75
Gr.No. 177 PDC-Mar'15 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Nallapadu (NLPD) TSS
2 Perecherla (PRCA)
3Phirangipuram
(PPM)SSP
4 Nudurupadu (NDPU)
5 Satulur (STUR) SSP
6 Narasaraopet (NRT)
7 Munumaka (MUK)
8 Santamagulur (SAB) SSP
9 Vellalacheruvu (VEP)
Status of Telecom Works for Railway Electrification targetted in 2014-15
Nallapadu - Diguvametta
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Main Section:
Agency:-
Status of TPC
phone
REPC Remark/ Status
Exis
tin
g
Exis
tin
g
Exis
tin
g
To be
Provided
Not
Provided
Not
Provided
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPC Remark/ Status
10 Savalyapuram (SYM) SSP
11 Vinukonda (VKN) TSS
12Cheekateegala
Palem (CEM)
13Gundlakamma
(GKM)SSP
14 Kurichedu (KCD) SP
15 Potlapadu (POO)
16 Donakonda (DKD) SSP
17 Gajjelakonda (GJJ) SSP
18Markapur Road
(MRK)TSS
19 Tarlupadu (TLU) SSP
20 Cumbum (CBM) SP
21 Jaggambhotla (JBK)
22 Somidevipalle (SDV) SSP
23 Gudimetta (GMA)
24 Giddalur (GID) TSS
25Kistamasettipalli
(KSTE)26 Diguvametta (DMT) SSP
Exis
tin
g
Exis
tin
g
Exis
tin
g
To be
Provided
Not
Provided
Not
Provided
Project:SC RKM: 8
25 KV Targeted Section : NIL RKM:0
RKM: 8
RKM: 8
Gr.No. 126 PDC-Mar'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Chikbanvar Yard
Exis
t
Exis
t
Exis
t
Not
ReqProvided Not Req
Note: All Telecom work completed.
Agency :- -
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPC Remark/ Status
Status of Telecom Works for Railway Electrification targetted in 2014-15
Banglore Circular
CRS Tageted Section : Yaswantpur-Chikbanvar
Main Section:
2.2 to 25 KV Targeted Section: Yaswantpur-Chikbanvar
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
TELECOM
Sl.
NoStations
C/H
Bldg
Project:SC RKM: 250
25 KV Targeted Section: Sondad-Rajoli RKM: 111
RKM: 0
Gr.No. 161 PDC-Mar'15 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)
At
Stns.
At
SP/SSP/
TSS
1 Gondia Jn.(G)(Excl) SP 0%
2 Gankhera (GKT)
3 Hirdamali (HDM) SSP 0%
4 Pindkepar (PQH)
5 Gonglee (GNL) TSS 0%
6 Khodseoni (KSIH)
7 Sondad (SNV) SSP 0%
8 Gondumri (GMI)
9 Dewalgaon (DEW) SP 0%
10 Barabati (BFF)11 Arjuni (AJU) SSP 0%
12 Wadegaon (WDG) SSP 0%
13 Arun Nagar (ARNG)
14 Wadsa (WSA) TSS 0%
25
KV
dyn
am
ic c
lea
ran
ce
ob
tain
ed
.
Work yet to start
SP/SSP/TSS
building not ready
Status of Telecom Works for Railway Electrification targetted in 2014-15
Gondia-Ballarshah
2.2 to 25 KV Targeted Section: NIL
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPC Remark/ Status
Main Section:
M/s Kalindee,Gurgaon
LOA-18.07.12,DOC-17.03.14Agency :-
SP/SSP/
TSS Bldg
Location
Exis
ting
Exis
ting
Exis
ting
Not
Re
qu
ire
d
Not
Provided
Not
Provided
OFC6
Quad
Total
(Km)
Comp.
(Km)
At
Stns.
At
SP/SSP/
TSS
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPC Remark/ Status
SP/SSP/
TSS Bldg
Location
15Chicholi Buzurg
(CCBZ)
16 Brahmapuri (BMP) SSP 0%
17 Kirtimenda (KMME) SP 0%
18 Nagbhir Jn (NAB) SSP 0%
19 Meodala (MGW)
20 Talodi Road (TUD) TSS 0%
21 Alewahi (AWH) SSP 0%
22 Sindewahi (SYE) SP 0%
23 Rajoli (ROL) SSP 0%
24 Mulmarora (MME) TSS 0%
25 Talewahi (TWI)
26 Kelzhar (KEZ) SSP 0%
27 Chanda Fort (CAF) SP 0%
28 Babupet (BUPH)
29 Ballarshah (BPQ)
Work yet to start
SP/SSP/TSS
building not readyExis
ting
Exis
ting
Exis
ting
Not
Re
qu
ire
dNot
Provided
Not
Provided
Project:SC RKM: 161
RKM: 0
RKM: 2
Gr.No. 132 PDC-Mar'14 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)
At
Stns.
At
SP/SSP/
TSS
1 Wadi Jn. (WADI) SP
2 Halkatta
3 Sulehalli (SUH) SSP
4 Chittapur (CT)
5Malkhaid Road
(MQR)TSS
6 Seram (SEM)
7 Kurgunta (KQT) SSP
8 Nawandgi (NAW)
9 Mantatti (MVH) SP
10 Tandur (TDU)11 Rukmapur (RMY) SSP
12 Dharur (DRR) SSP
13 Mailaram (MWY)
14 Godamgura ((GDQ) TSS
Agency :- Work By South Central Railway
CRS Tageted Section : Wadi Yard
Status of Telecom Works for Railway Electrification targetted in 2014-15
Main Section: Wadi (Excl)-Lingapalli (Excl)
2.2 to 25 KV Targeted Section: NIL
REPC Remark/ Status
TELECOM
Sl.
NoStations
C/H
Bldg
MainAddnl
MUX
By RE
Provided ProvidedCompWork
Comp
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
25
KV
Dyn
am
ic c
lea
ran
ce
rece
ived
Work Completed .
Exis
ting
Exis
ting
Exis
ting
Not
Re
qu
ire
d
OFC6
Quad
Total
(Km)
Comp.
(Km)
At
Stns.
At
SP/SSP/
TSS
REPC Remark/ StatusSl.
NoStations
C/H
Bldg
MainAddnl
MUX
By RE
SP/SSP/
TSS Bldg
Location
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
15 Vikrabad Jn. (VKB)
16 Chitgidda (CTF) SSP
17 Gullaguda (GGD) SP
18Ravalapalli Kalan
(RPK)SSP
19 Shankarpalli (SKP)
20 Nagalapalli (NPL) TSS
21 Lingampalli (LPI) SSP
CompWork
Comp
Exis
ting
Exis
ting
Exis
ting
Not
Re
qu
ire
d
Provided Provided
25
KV
Dyn
am
ic c
lea
ran
ce
rece
ived
Work Completed .
Project: SC RKM: 365
25 KV Targeted Section: Guntakal-Dhone RKM: 77
Gr.No. 178 PDC-Mar'15 As on 30.05.2014
OFC6
Quad
Total
(Km)
Comp.
(Km)At Stns.
At
SP/SSP/
TSS
1 Guntakal Jn. (GTL) TSS
2 Maddikera (MKR)
3 Tuggali (TGL) SSP
4 Edduladoddi (EDD)
5 Gootyi (GV) SSP
6 Pagidiral (PGDI)
7 Pendekallu (PDL)
8 Lingandoddi (LMD) SSP
9 Nalliya (NYL)
10 Dhone Jn. (DHNE) SSP
SP/SSP/
TSS Bldg
Location
Status of Telecom Works for Railway Electrification targetted in 2014-15
Main Section: Guntur- Nallapadu- Guntkal
Agency:-
TELECOM
Sl.
NoStations
C/H
Bldg.
MainAddnl
MUX
By RE
Not
Provided
SP/SSP/
TSS
Bldg
status
Cable laying for
SP/SSP/TSS
Status of TPC
phone
REPCRemark/
StatusE
xis
ting
Exis
ting
Exis
ting
To be
Provided
Not
Provided
Recommended