Space Reallocation Update

Preview:

DESCRIPTION

Space Reallocation Update. October, 2007. Summary. “Almost” on time Definitely under budget Thanks to all for their patience and good humour Lots of “small things” yet to do. Ferrier Building. Everyone has moved in Still need signs Some final details still to complete - PowerPoint PPT Presentation

Citation preview

Space Reallocation UpdateSpace Reallocation Update

October, 2007October, 2007

SummarySummary

““Almost” on timeAlmost” on time Definitely under budgetDefinitely under budget Thanks to all for their patience and Thanks to all for their patience and

good humourgood humour Lots of “small things” yet to doLots of “small things” yet to do

Ferrier BuildingFerrier Building

Everyone has moved inEveryone has moved in Still need signsStill need signs Some final details still to completeSome final details still to complete Access to Ferrier opposite James Access to Ferrier opposite James

Building (to 1Building (to 1stst floor), from Dr. floor), from Dr. Penfield (to 3Penfield (to 3rdrd floor), and from 3 floor), and from 3rdrd floor of Arts (to 3floor of Arts (to 3rdrd floor) floor)

Arts Computer Lab in MayArts Computer Lab in May

Arts Computer Lab in Arts Computer Lab in SeptemberSeptember

The Art Computer Lab Help The Art Computer Lab Help DeskDesk

Department of History Department of History Workspace (May)Workspace (May)

Department of History Department of History Workspace in SeptemberWorkspace in September

The Beaverbrook Conference The Beaverbrook Conference RoomRoom

The Arts Lounge The Arts Lounge (Ferrier 2(Ferrier 2ndnd floor) floor)

The CourtyardThe Courtyard

Construction should start very soonConstruction should start very soon Noisy work to be done ONLY early in Noisy work to be done ONLY early in

the morningthe morning

Courtyard looking eastCourtyard looking east

Courtyard looking westCourtyard looking west

Down the SlopeDown the Slope

Arts West: DLLFArts West: DLLF

““Ready to Roll”Ready to Roll”The Computer Classroom: The Computer Classroom:

Leacock 212Leacock 212 New lighting is operationalNew lighting is operational Computers are now installedComputers are now installed Most software is installedMost software is installed The pedagogical options are The pedagogical options are

unparalleledunparalleled To learn more and to be given a To learn more and to be given a

demonstration of our state-of-the-art demonstration of our state-of-the-art classroom, contact Mary MacKinnonclassroom, contact Mary MacKinnon

Leacock 212: The Computer Leacock 212: The Computer ClassroomClassroom

(prior to the installation of the computers)(prior to the installation of the computers)

What’s Next ?What’s Next ?

How can we best integrate numerous projects How can we best integrate numerous projects in Peterson Hall? (washrooms, CFI projects, in Peterson Hall? (washrooms, CFI projects, general repairs to offices, ventilation, and general repairs to offices, ventilation, and more)more)

How can we make the best use of our new How can we make the best use of our new assets? (especially the computer classroom assets? (especially the computer classroom and breakout rooms in Leacock)and breakout rooms in Leacock)

Installation of the computers at the Stand-up Installation of the computers at the Stand-up computer stations in the Leacock corridor computer stations in the Leacock corridor

Installation of the printers in Leacock by SnaxInstallation of the printers in Leacock by Snax