James Webb Space Telescope Update. Eric P. Smith Deputy Director, JWST Program NASA Science Mission Directorate. 2010 Programmatic Events. TAT: Test Assessment Team ICRP: Independent Comprehensive Review Panel. NASA TAT Responses. ICRP Recommendations (1). Baseline Funding - PowerPoint PPT Presentation
Citation preview
James Webb Space Telescope Update
Eric P. SmithDeputy Director, JWST Program
NASA Science Mission Directorate
2010 Programmatic Events
2AAS 217th Meeting
TAT: Test Assessment TeamICRP: Independent Comprehensive
Review Panel
NASA TAT Responses Finding Status
Prioritization of Verification Tasks Concur, tasks being prioritized
OTIS Testing at JSC Concur with goals of recommendation
MIRI Testing at JSC Concur, will establish MIRI testing plans
NIR Detector Operating Margins Additional testing shows no need for new detectors
Dedicated I&T Lead Concur: Jeff Hanley on board
Decision Making During OTIS Testing Concur, decision trees under development
l&T Reorganization (OTIS) Concur: Completed
Prioritization of Optical Tests Concur, test being prioritized
ISIM Instrument and Optical Testing Concur, reducing instrument CPT tests after delivery
Thermal Balance Testing at JSC Concur, threat in the system
Enhanced Pathfinder Testing Concur, Lien in the system
ISIM Cryo Testing Length ISIM testing shortened to mitigate this concern
Chamber Checkout at JSC Concur
Thermal Simulation Turnaround Time Concur
Thermal Test Assessment Criteria Concur
Parallel Optical & Thermal Testing @ JSC Concur
Use of Radiator Margin Concur
3AAS 217th Meeting
ICRP Recommendations (1)
• Baseline Funding– NASA did not establish an adequate cost and
schedule baseline at JWST’s Confirmation Review milestone, and recommended four specific steps be taken to establish a realistic baseline.
4AAS 217th Meeting
ICRP Recommendations (2)
• Independent Analysis Capability– NASA Headquarters should have a robust
independent cost and program analysis capability, and recommended a stronger role for the Office of Independent Program and Cost Evaluation (IPCE).
5AAS 217th Meeting
ICRP Recommendations (3)
• Program and Project Management– Recommended that JWST be elevated to a new
organizational entity at Headquarters– Implementation phase of JWST project requires a
different management approach than the Formulation phase
6AAS 217th Meeting
HQ Management Changes
7AAS 217th Meeting
WAS IS
GSFC Management Changes
8AAS 217th Meeting
WAS IS
ICRP Recommendations (4)
• Additional Items– NASA program/project governance policy– Program, Project, Industry communication– Potential Risk in Integration and Test
• ICRP Endorsed findings of the TAT– System Engineering
• Establish a plan that provides the required level of experience and involves appropriate prime contractor personnel before changing system engineering accountability
– Project Scientist and Science Team• Recommend this role be strengthened
9AAS 217th Meeting
Steps to A Launch Date
10AAS 217th Meeting