James Webb Space Telescope Update. Eric P. Smith Deputy Director, JWST Program NASA Science Mission Directorate. 2010 Programmatic Events. TAT: Test Assessment Team ICRP: Independent Comprehensive Review Panel. NASA TAT Responses. ICRP Recommendations (1). Baseline Funding - PowerPoint PPT Presentation

Citation preview

Page 1: James Webb Space Telescope Update

James Webb Space Telescope Update

Eric P. SmithDeputy Director, JWST Program

NASA Science Mission Directorate

Page 2: James Webb Space Telescope Update

2010 Programmatic Events

2AAS 217th Meeting

TAT: Test Assessment TeamICRP: Independent Comprehensive

Review Panel

Page 3: James Webb Space Telescope Update

NASA TAT Responses Finding Status

Prioritization of Verification Tasks Concur, tasks being prioritized

OTIS Testing at JSC Concur with goals of recommendation

MIRI Testing at JSC Concur, will establish MIRI testing plans

NIR Detector Operating Margins Additional testing shows no need for new detectors

Dedicated I&T Lead Concur: Jeff Hanley on board

Decision Making During OTIS Testing Concur, decision trees under development

l&T Reorganization (OTIS) Concur: Completed

Prioritization of Optical Tests Concur, test being prioritized

ISIM Instrument and Optical Testing Concur, reducing instrument CPT tests after delivery

Thermal Balance Testing at JSC Concur, threat in the system

Enhanced Pathfinder Testing Concur, Lien in the system

ISIM Cryo Testing Length ISIM testing shortened to mitigate this concern

Chamber Checkout at JSC Concur

Thermal Simulation Turnaround Time Concur

Thermal Test Assessment Criteria Concur

Parallel Optical & Thermal Testing @ JSC Concur

Use of Radiator Margin Concur

3AAS 217th Meeting

Page 4: James Webb Space Telescope Update

ICRP Recommendations (1)

• Baseline Funding– NASA did not establish an adequate cost and

schedule baseline at JWST’s Confirmation Review milestone, and recommended four specific steps be taken to establish a realistic baseline.

4AAS 217th Meeting

Page 5: James Webb Space Telescope Update

ICRP Recommendations (2)

• Independent Analysis Capability– NASA Headquarters should have a robust

independent cost and program analysis capability, and recommended a stronger role for the Office of Independent Program and Cost Evaluation (IPCE).

5AAS 217th Meeting

Page 6: James Webb Space Telescope Update

ICRP Recommendations (3)

• Program and Project Management– Recommended that JWST be elevated to a new

organizational entity at Headquarters– Implementation phase of JWST project requires a

different management approach than the Formulation phase

6AAS 217th Meeting

Page 7: James Webb Space Telescope Update

HQ Management Changes

7AAS 217th Meeting

WAS IS

Page 8: James Webb Space Telescope Update

GSFC Management Changes

8AAS 217th Meeting

WAS IS

Page 9: James Webb Space Telescope Update

ICRP Recommendations (4)

• Additional Items– NASA program/project governance policy– Program, Project, Industry communication– Potential Risk in Integration and Test

• ICRP Endorsed findings of the TAT– System Engineering

• Establish a plan that provides the required level of experience and involves appropriate prime contractor personnel before changing system engineering accountability

– Project Scientist and Science Team• Recommend this role be strengthened

9AAS 217th Meeting

Page 10: James Webb Space Telescope Update

Steps to A Launch Date

10AAS 217th Meeting

Page 11: James Webb Space Telescope Update

End

11AAS 217th Meeting