Solar project site plan JUN 2015.pdf

Preview:

Citation preview

  • PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    PL

    MV

    MV

    MV

    UG

    UG

    UG

    UG

    AC

    A

    C

    AC

    A

    C

    AC

    AC AC AC

    N

    PROPOSED ARRAY FENCE

    2 13456789101112

    2 13456789101112

    B

    TITLE

    SIZE DRAWINGNUMBER

    REV

    DATEENGINEERED BYDRAWN BYD

    205 BILLINGS FARM ROAD, BUILDING 4WHITE RIVER JUNCTION, VERMONT 05001800-374-4494INFO@GROSOLAR.COM

    THIS DRAWING AND SPECIFICATIONS CONTAINED HEREON IS PROPRIETARY TOGROSOLAR AND IS LOANED TO FACILITATE BIDDING, CONSTRUCTION, FABRICATION

    AND/OR EXECUTION OF REQUIREMENTS STATED AND IS TO BE SURRENDEREDUPON REQUEST OR COMPLETION OF SERVICES

    PROJECT

    LOCATION

    REV CHK BY APV BYDATEREVISIONS

    A

    C

    D

    E

    F

    G

    H

    B

    A

    C

    D

    E

    F

    G

    H

    DESCRIPTIONSCALE SHEET

    PROJECTNUMBER

    PRELIMINARY SITE PLAN

    E-1TBD CESB JMM 05-19-2015

    1 IN = 50 FT 1 OF 1

    TOWN OF CLIFTON PARK SOLAR217 VISCHER FERRY ROADCLIFTON PARK, NY 12148

    A ISSUED FOR REVIEW 02-10-2015B UPDATED LAYOUT, NEW EQUIPMENT TRANSFORMER AREA 03-26-2015C REVISED AND REISSUED FOR INTERCONNECTION 05-19-2015

    ISSUED FOR INTERCONNECTIONNOT FOR CONSTRUCTION

    NOTES

    1. SITE SPECIFIC FACTORS SUCH AS: TOPOGRAPHY,SHADING, ACCESS DRIVES, DRAINAGE, EXISTINGBUILDINGS, PV EQUIPMENT, PAD LOCATIONS, AND ORUTILITY INTERCONNECTION AREA COULD CHANGE THEFINAL ARRAY LAYOUT AND POWER OUTPUT.

    2. THE ARRAY ROW SPACING SHOWN WILL PREVENTSHADING BETWEEN 10AM-2PM ON DECEMBER 21ST.

    3. SITE PREPARATION AND PRELIMINARY LAYOUT FOR THECLIFTON PARK LANDFILL SITE IS BASED ONINFORMATION PROVIDED BYC.T. MALE ASSOCIATESENGINEERING, SURVEYING AND ARCHITECTURE D.P.C.,FROM DRAWING #15-145, NAMED TOPOGRAPHIC SURVEYPORTION OF LOT 1 OF TOWN OF CLIFTON PARK LANDFILLSHEET 1 OF 1, PROJECT #14.4727 LATEST REVISIONDATED 01/ 26/ 2015.

    PROPOSEDINVERTER,

    EQUIPMENT, ANDTRANSFORMER

    PADSUNDERGROUND FEEDERSTO EQUIPMENT PAD

    APPROXIMATE EXISTING POLE,POINT OF INTERCONNECTION ANDPOCC, UTILITY ISOLATION SWITCH

    PROPOSEDENTRANCE

    SYSTEM SUMMARY?????????????????

    ????

    ??????????????

    ???

    MODULE POWER (Wp) 325

    NUMBER OF MODULES 3060

    RATED DC POWER (kWp) 994.5

    INVERTER AC CAPACITY (kWAC) 742.4PROPOSED GRAVELACCESS DRIVE

    APPROXIMATE EXISTING ELECTRICAL UTILITY POLE

    APPROXIMATE EXISTING GAS VENT, TYPICAL.

    APPROXIMATE EXISTING OVERHEAD ELECTRIC CIRCUIT

    LEGEND

    APPROXIMATE VENT PIPE WITH 15FT RADIUS SETBACK

    PL APPROXIMATE EXISTING PROPERTY LINE

    PROPOSED RACK - (2) VERTICAL ROWS OF 9 MODULES

    MV MV MV PROPOSED UNDERGROUND MEDIUM VOLTAGE CIRCUIT

    APPROXIMATEEXISTING WELL

    LOCATION,SETBACK TBD

    TRANSITION FROMABOVE GROUND TO

    UNDERGROUND OFF OFTHE LANDFILL

    OE OE OE PROPOSED OVERHEAD ELECTRIC CIRCUIT

    PROPOSED PV ARRAY

    AC AC AC PROPOSED LV ABOVE GROUND ELECTRIC CIRCUIT

    UG UG UG PROPOSED LV UNDERGROUND ELECTRIC CIRCUIT

    LINE EXTENSION BYGROSOLAR

    APPROXIMATEEXISTING POLE, RISERPOLE, GENERATORISOLATION SWITCH

    NEW METER POLE,NATIONAL GRID METER

Recommended