Senior Project Powerpoint

Preview:

DESCRIPTION

Energy Capture from Ocean Waves

Citation preview

Energy Capture from Waves: Final Presentation

Robert Kaiser: Project ManagerJoseph Gorton: Electrical Engineer

Geoffrey Hoffmann: Mechanical EngineerKyle Steets: Mechanical Engineer

Peter Wassel: Mechanical Engineer

Outline

• Designs• Detailed Design: Buoy • Testing & Analysis• Project Management

Fall 2008 Semester

Spring 2009 Semester

DESIGNS

“Pandora’s Box”

Buoy

Buoy: Mechanical Design

Buoy: Mechanical Design

Buoy: Mechanical Design

Buoy: Mechanical Design

Buoy: Electrical Design

MANUFACTURING

Wire Wrapping

# of Turns =length of wire on spool

Circumference of pipe

=length of wire on spool (inches)

linear length/revolution inches turn( )

# of Turns =1640ft( ) 12in

ft( )

1.660inturn

≈11,855 turns

Pipe Caps and Springs

Inner Pipe Spacers

TESTING AND ANALYSIS

Early Test Results

• Tested magnets with two of Dr. Orehotsky’s coils in the Physics II Lab– One (1) Magnet was able to produce

approximately 1 Volts– Two (2) Magnets were able to produce

approximately 2 Volts

Demonstration Test Results: One Coil

Current Electrical Test Results:Three Coils

Mechanical Test Results

Analysis

Comparison to Solar and Wind Power

PROGRAM MANAGEMENT

Budget

Original Budget

$20,630

$500 $2,000

$600

LaborConsultationMaterialsMisc.

Current Budget

$41,168

$500$2,000 $600

LaborConsultationMaterialsMisc.

Comparing what was budgeted and what was spent

Current Budget Actual Money Spent

$41,168

$500$2,000 $600

LaborConsultationMaterialsMisc.

$4,081.69

$169.10 $178.69

LaborConsultationMaterialsMisc.

WBS StructureCost Center (task) Cumulative Cost Budgeted Cost Remainder

W-10-00: Program Management $1,433.33 $4,722.59 $3,289.26

W-10-01: Admin. Labor Cost $0.00 $20.00 $20.00

W-10-02: Research Labor $362.34 $322.08 ($40.26)

W-10-03: Deliverable Writing $1,013.60 $9,855.84 $8,842.24

W-10-04: Consulting $169.10 $500.00 $330.90

W-10-05: Misc. $0.00 $50.00 $50.00

W-10-06: Management Reserve $80.52 $2,013.00 $1,932.48

W-10-07: Design $161.04 $410.66 $249.62

W-10-08: CADD Design $44.29 $483.12 $438.83

W-10-09: 3D Design $177.16 $241.56 $64.40

W-10-10: Manufacturing $704.57 $17,533.36 $16,828.79

W-10-11: Allocation $487.18 $603.90 $116.72

W-10-12: Testing $161.04 $4,348.08 $4,187.04

W-10-13: Test Development $346.42 $322.08 ($24.34)

W-10-14: Analysis $0.00 $241.56 $241.56

Misc. $0.00 $600.00 $600.00

Total $5,140.59 $42,267.83 $37,127.24

MaterialsQuantity Ordered Description Vendor Price

3 30AWG Magnet Wire Action Electronics $61.00

4 1”x1” Neodymium Magnets w/ ¼” Hole

Applied Magnets $15.80

1 1-¼” PVC Pipe Lowe’s $2.27

2 1-¼” PVC Pipe Caps Lowe’s $1.34

1 Set of two (2) compression springs

Lowe’s $4.48

1 2-¼” PVC Pipe Lowe’s

2 2-¼” PVC Pipe Lowe’s

4 Germanium Diodes Provided $0.00

1 Small Circuit Board Provided $0.00

1 PVC Pipe Cleaner Lowe’s $3.88

1 PVC Pipe Glue Lowe’s $2.97

OVERALL TOTAL: $178.69

Thank You! – Any Questions?