Energy Capture from Waves: Final Presentation
Robert Kaiser: Project ManagerJoseph Gorton: Electrical Engineer
Geoffrey Hoffmann: Mechanical EngineerKyle Steets: Mechanical Engineer
Peter Wassel: Mechanical Engineer
Outline
• Designs• Detailed Design: Buoy • Testing & Analysis• Project Management
Fall 2008 Semester
Spring 2009 Semester
DESIGNS
“Pandora’s Box”
Buoy
Buoy: Mechanical Design
Buoy: Mechanical Design
Buoy: Mechanical Design
Buoy: Mechanical Design
Buoy: Electrical Design
MANUFACTURING
Wire Wrapping
€
# of Turns =length of wire on spool
Circumference of pipe
=length of wire on spool (inches)
linear length/revolution inches turn( )
# of Turns =1640ft( ) 12in
ft( )
1.660inturn
≈11,855 turns
Pipe Caps and Springs
Inner Pipe Spacers
TESTING AND ANALYSIS
Early Test Results
• Tested magnets with two of Dr. Orehotsky’s coils in the Physics II Lab– One (1) Magnet was able to produce
approximately 1 Volts– Two (2) Magnets were able to produce
approximately 2 Volts
Demonstration Test Results: One Coil
Current Electrical Test Results:Three Coils
Mechanical Test Results
Analysis
Comparison to Solar and Wind Power
PROGRAM MANAGEMENT
Budget
Original Budget
$20,630
$500 $2,000
$600
LaborConsultationMaterialsMisc.
Current Budget
$41,168
$500$2,000 $600
LaborConsultationMaterialsMisc.
Comparing what was budgeted and what was spent
Current Budget Actual Money Spent
$41,168
$500$2,000 $600
LaborConsultationMaterialsMisc.
$4,081.69
$169.10 $178.69
LaborConsultationMaterialsMisc.
WBS StructureCost Center (task) Cumulative Cost Budgeted Cost Remainder
W-10-00: Program Management $1,433.33 $4,722.59 $3,289.26
W-10-01: Admin. Labor Cost $0.00 $20.00 $20.00
W-10-02: Research Labor $362.34 $322.08 ($40.26)
W-10-03: Deliverable Writing $1,013.60 $9,855.84 $8,842.24
W-10-04: Consulting $169.10 $500.00 $330.90
W-10-05: Misc. $0.00 $50.00 $50.00
W-10-06: Management Reserve $80.52 $2,013.00 $1,932.48
W-10-07: Design $161.04 $410.66 $249.62
W-10-08: CADD Design $44.29 $483.12 $438.83
W-10-09: 3D Design $177.16 $241.56 $64.40
W-10-10: Manufacturing $704.57 $17,533.36 $16,828.79
W-10-11: Allocation $487.18 $603.90 $116.72
W-10-12: Testing $161.04 $4,348.08 $4,187.04
W-10-13: Test Development $346.42 $322.08 ($24.34)
W-10-14: Analysis $0.00 $241.56 $241.56
Misc. $0.00 $600.00 $600.00
Total $5,140.59 $42,267.83 $37,127.24
MaterialsQuantity Ordered Description Vendor Price
3 30AWG Magnet Wire Action Electronics $61.00
4 1”x1” Neodymium Magnets w/ ¼” Hole
Applied Magnets $15.80
1 1-¼” PVC Pipe Lowe’s $2.27
2 1-¼” PVC Pipe Caps Lowe’s $1.34
1 Set of two (2) compression springs
Lowe’s $4.48
1 2-¼” PVC Pipe Lowe’s
2 2-¼” PVC Pipe Lowe’s
4 Germanium Diodes Provided $0.00
1 Small Circuit Board Provided $0.00
1 PVC Pipe Cleaner Lowe’s $3.88
1 PVC Pipe Glue Lowe’s $2.97
OVERALL TOTAL: $178.69